| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.4 LAccepted-Finance | ₹95.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹97.0 LAccepted-Finance | ₹97.0 L | L2 | Accepted-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical MOH SHER MOHAMMAD PILIBHIT | PILIBHIT | UTTAR PRADESH | 262001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
15 Dec 2025, 2:00 pmClosed
Superintending Engineer
SE ECTC SLDC Campus UPPTCL, Lucknow
Civil Construction Work for 132 KV Transfer Bus, Bay and Converting Single Main Bus Bar Scheme into Main 1 Transfer Bus Scheme at 132 KV Sub Station, Khalilabad, Sant Kabir Nagar
2025_UPCTL_1090316_1
65/ECTC(L)/2025-26
Open Tender
Civil Works
120 days
SE ECTC SLDC Campus UPPTCL, Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
Superintending Engineer, E.C.T.C. Lucknow
₹1.9 L
2 Feb 2026
13 Nov 2025
16 Dec 2025
13 Nov 2025
15 Dec 2025
13 Nov 2025
132 KV Transfer Bus, 'Bay' and Converting Single Main Bus Bar Scheme into Main-1 Transfer Bus Scheme at 132 KV Sub Station, Khalilabad, Sant kabir Nagar
B.O.Q Civil Construction Work for 132 KV Transfer Bus, 'Bay' and Converting Single Main Bus Bar Scheme into Main-1 Transfer Bus Scheme at 132 KV Sub Station, Khalilabad, Sant kabir Nagar.(SOR 05/2024)
Contouring of sub-station with help of leveling instrument/ total station instrument & staff including plotting of trees and structure if any including preparation of contour plan in 6 copies including marking periphery including all labour, Supervisor, instrument, T&P materials complete as per direction of Engineer I/C. ( 29.123 )
total
Conditions:
1. All civil work shall be executed according to the approved drawings of UPPTCL.
2. The quantities in BOQ are tentative and may vary up to any extent or be deleted as per the requirement at site.
3. All civil work shall be carried out as per UPPWD/UPPTCL specification.
4. Rates in BOQ are exclusive of CGST,SGST. Labour tax shall be borne by contractor.
5. Pozzlona Portland cement confirming to IS 1489(Part 1) 1991 of approved quality like ACC,Ultra Tech,Birla or equi.shall only be used.
6. Overweight steel section within tolerance shall be measured at standard weight and underweight steel section within tolerence shall be measured at actual weight.
7. In case any change in Bill of Quantity is suggested by higher authority that will be binding on the contractor.The agreement shall be executed on the approved Bill of Quantity only.
8.Performance Guarantee shall be applicable as per GO 622/23-12-2012-2 Audit/08 dt 08 June 2012.adopted by UPPTCL BOD dated 27.06.2017
9. The 60% amount of bricks available from dismantling shall be reovered @ Rs. 2362.00/thousand + GST from firm /contractor.
10. The 30% amount of bricks available from dismantling shall be reovered as brick ballast @ Rs. 700.00/CuM + GST from firm /contractor.
11. The amount of steel/Chain link/Pale Fencing available from dismantling will be recovered Rs. 20.00/Kg + GST from firm /contractor.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.59 MB
Tendernotice_2.pdf
PDF • 0.60 MB
BOQ_2002164.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid