Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹39.6 L+₹1.5 L (3.93%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹41.1 L+₹3.1 L (8.03%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹42.8 L+₹4.7 L (12.4%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹44.4 L+₹6.4 L (16.7%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S DHAGPA ENTERPRISES L8 | M/S T G ENTERPRISES L5 | M/S KEWAN INDIA L2 | M/S L.N. TRADERS L4 | M/S YESHI THINLEY L1 | M/S L G BUILDERS L3 | M/S TSERING DHONDUP L7 | M/S KESANG CONSTRUCTION L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolation of cement Concrete (unreinforced) of any description and in any position not otherwise specifically provided and removing the debris outside the defence land complete all as specified and as directed | 18.81 | Cum | 1,718.56 ₹32,326.18 | 1,655.33 ₹31,136.67 | 1,530 ₹28,779.3 | 1,591.66 ₹29,939.11 | 1,500 ₹28,215 Lowest | 1,545.3 ₹29,067.09 | 1,671.75 ₹31,445.7 | 1,647.05 ₹30,980.99 |
| 2.00 | Demolition of cement concrete (un reinforced) in ground floors and paving n. exc. 15 cm thickness (below or above ground level) complete all as directed. | 1.95 | Cum | 1,677.61 ₹3,271.34 | 1,583.24 ₹3,087.32 | 1,485 ₹2,895.75 Lowest | 1,559.84 ₹3,041.7 | 1,500 ₹2,925 | 1,499.85 ₹2,924.71 | 1,687.74 ₹3,291.08 | 1,622.82 ₹3,164.5 |
| 3.00 | Dismantling timber in fillets, rails, posts, rafters,purlins, etc. under 40 sq. cm in section | 630 | RM | 24.24 ₹15,273.16 | 24.01 ₹15,129.39 | 24.75 ₹15,592.5 | 24.26 ₹15,282.21 | 25 ₹15,750 | 24.5 ₹15,436.58 | 23.54 ₹14,828.31 Lowest | 23.77 ₹14,978.09 |
| 4.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises. | 137 | Sqm | 112.94 ₹15,473.45 | 115.3 ₹15,795.55 | 122.5 ₹16,782.5 | 117.65 ₹16,117.91 | 125 ₹17,125 | 120.05 ₹16,446.85 | 110.73 ₹15,170.05 Lowest | 112.99 ₹15,479.64 |
| 5.00 | Dismantling of Wall and ceiling boards (fibre, pulp, insulation, etc.) or insulation boards/slabs/ blankets, any thickness, including cover fillets. | 268.29 | Sqm | 88.52 ₹23,747.85 | 75.75 ₹20,322.6 | 63.6 ₹17,063.24 | 71.46 ₹19,172.26 | 60 ₹16,097.4 Lowest | 67.42 ₹18,087.04 | 85.11 ₹22,834.47 | 80.29 ₹21,541.95 |
| 6.00 | Dismantling plain or corrugated steel sheeting any thickness, complete all as specified and directed. | 132.34 | Sqm | 53.65 ₹7,099.98 | 46.79 ₹6,192.76 | 41.6 ₹5,505.34 | 44.99 ₹5,954.58 | 40 ₹5,293.6 Lowest | 43.26 ₹5,725.56 | 50.61 ₹6,698.09 | 48.67 ₹6,440.47 |
| 7.00 | Dismantling timber scantlings 40 sq. cm and over in section, in any position, unframed work | 1.3 | Cum | 1,592.39 ₹2,070.11 | 1,515.41 ₹1,970.03 | 1,428 ₹1,856.4 | 1,485.69 ₹1,931.4 | 1,400 ₹1,820 Lowest | 1,456.56 ₹1,893.53 | 1,576.63 ₹2,049.62 | 1,545.71 ₹2,009.43 |
| 8.00 | Taking down chowkhats or frame exc 1.5 sqmtr but n.exc 4 sq m(without taking off shutters from frames), complete all as specified and directed. | 3 | Each | 567.91 ₹1,703.74 | 520.3 ₹1,560.91 | 505 ₹1,515 | 515.15 ₹1,545.45 | 500 ₹1,500 Lowest | 510.05 ₹1,530.15 | 530.76 ₹1,592.28 | 525.51 ₹1,576.52 |
| 9.00 | Taking down chowkhats or frame n.exc 1.5 sqmtr (without taking off shutters from frames), complete all as specified and directed. | 8 | Each | 328.19 ₹2,625.53 Lowest | 354.12 ₹2,832.94 | 388 ₹3,104 | 365.07 ₹2,920.55 | 400 ₹3,200 | 376.36 ₹3,010.88 | 333.19 ₹2,665.51 | 343.49 ₹2,747.95 |
| 10.00 | Surface excavation not exc 30 cm deep and averaging 15 cm deep and getting out in hard /dense soil | 20.58 | Sqm | 125.57 ₹2,584.19 | 124.52 ₹2,562.62 | 132.3 ₹2,722.73 | 127.06 ₹2,614.91 | 135 ₹2,778.3 | 129.65 ₹2,668.28 | 119.59 ₹2,461.14 Lowest | 122.03 ₹2,511.36 |
Tender Value
Refer Docs
EMD Value
₹73,300
Closing Date
6 Apr 2026, 6:00 pmClosed
Maj Rohit Gogoi
ge 859 ews
SPECIAL REPAIR OF VARIOUS BUILDING UNDER GE 859 EWS
2026_MES_753883_1
8991/E8
Open Tender
Civil Works
Item Rate
859 ews
SPECIAL REPAIR OF VARIOUS BUILDING UNDER GE 859 EWS
7 documents required · 7 mandatory
₹500
Yes
GE 859 EWS
₹73,300
Yes
11 Apr 2026
24 Feb 2026
7 Apr 2026
24 Feb 2026
6 Apr 2026
9 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolation of cement Concrete (unreinforced) of any description and in any position not otherwise specifically provided and removing the debris outside the defence land complete all as specified and as directed | 18.81 | Cum | - | - |
| 2 | Demolition of cement concrete (un reinforced) in ground floors and paving n. exc. 15 cm thickness (below or above ground level) complete all as directed. | 1.95 | Cum | - | - |
| 3 | Dismantling timber in fillets, rails, posts, rafters,purlins, etc. under 40 sq. cm in section | 630 | RM | - | - |
| 4 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises. | 137 | Sqm | - | - |
| 5 | Dismantling of Wall and ceiling boards (fibre, pulp, insulation, etc.) or insulation boards/slabs/ blankets, any thickness, including cover fillets. | 268.29 | Sqm | - | - |
| 6 | Dismantling plain or corrugated steel sheeting any thickness, complete all as specified and directed. | 132.34 | Sqm | - | - |
| 7 | Dismantling timber scantlings 40 sq. cm and over in section, in any position, unframed work | 1.3 | Cum | - | - |
| 8 | Taking down chowkhats or frame exc 1.5 sqmtr but n.exc 4 sq m(without taking off shutters from frames), complete all as specified and directed. | 3 | Each | - | - |
| 9 | Taking down chowkhats or frame n.exc 1.5 sqmtr (without taking off shutters from frames), complete all as specified and directed. | 8 | Each | - | - |
| 10 | Surface excavation not exc 30 cm deep and averaging 15 cm deep and getting out in hard /dense soil | 20.58 | Sqm | - | - |
stage.html
html • 0.04 MB
technical_844499.pdf
techsummary_844499.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_844499.xls
BOQ • 0.40 MB
8991.pdf
Tender Documents • 1.30 MB
retender.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .