Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹10.5 LSame as L1Rejected-Finance GOA GOA | SOUTH GOA | GOA | 403103 | L2 | Rejected-Finance Second Lowest bidder |
Tender Value
₹13.2 L
EMD Value
₹26,370
Closing Date
27 Aug 2024, 5:00 pmClosed
EE II
Aquem Baixo Rawanfond
Urgent construction of protection wall for collapsed banks at Sy. No. 55/1 at Sernabatim Village of Colva Village Panchayat in Benaulim Constituency under Disaster Manangement.
2024_WRD_16721_1
WDII/TECH/F17/7e/2024-25/SN4
Open Tender
Miscellaneous Works
Item Rate
90 days
Rawanfond
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹26,370
8 Oct 2024
13 Aug 2024
28 Aug 2024
13 Aug 2024
27 Aug 2024
13 Aug 2024
Amount
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : All kinds of soil
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: Upto 2.5 meters long pile
Heading and pointing whole bally piles 150mm diameter including only rings, providing and fixing pile shoes, cutting of heads after driving and taking out rings removing cut off portions to departmental store as specified.
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) Upto 2.5 meters long pile
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings, propping etc. and removal of formwork for: Foundations, footings, bases for columns and mass concrete
vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level
In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.
Laterite boulder masonry in cement concrete 1:3:6 (1 cement, 3 coarse sand : 6 graded granitic stone aggrt. 20mm nominal size) in foundation.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge 110mm Dia
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.
Nutan Gopalkrishna Prabhu Malkarnekar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .