Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 CrAccepted-AOC | ₹1.5 Cr | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | NIRMALA CONSTRUCTIONS L1 |
|---|---|---|---|---|
| 1.00Appendix A - Duck Pond | ||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 365.79 | sqm | 18.27 ₹6,682.98 |
| 1.00 | 60.2.3:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 125 | hour | 518.65 ₹64,831.25 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 597.23 | cum | 258.8 ₹1.5 L |
| 1.00 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 25.88 | cum | 2,980.72 ₹77,126.13 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 70.03 | cum | 4,011.67 ₹2.8 L |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 17.04 | cum | 8,381.54 ₹1.4 L |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 18.06 | sqm | 843.43 ₹15,232.35 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.61 | cum | 8,608.22 ₹31,092.89 |
| 1.01 | 16.78.1:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With Material conforming to Grade - I ( size range 75 mm to 0.075 mm) having CBR Value- 30 | 57.16 | cum | 3,348.48 ₹1.9 L |
Tender Value
₹1.5 Cr
EMD Value
₹50,000
Closing Date
7 Oct 2025, 11:00 amClosed
Chief Engineer, KIIDC
Kerala Irrigation Infrastructure Development Corporation Ltd., Ground Floor, Old Jica Building, KWA Campus, Vellayambalam, Thiruvananthapuram
District Panchayath and Agriculture department,it was decided to prepare an estimate for upgrading the existing seed farm to a new farm
2025_KIIDC_775955_2
KIIDC/TR/7833/2024_12_1_1/1
Open Tender
Civil Works - Others
365 days
Alappuzha, Arunoottimangalam
Please refer tender document
3 documents required · 3 mandatory
₹6,508
₹50,000
27 Jan 2026
23 Sept 2025
10 Oct 2025
23 Sept 2025
7 Oct 2025
23 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid