| Sl No | Description | Qty | Unit | JOPHIN KA L2 | SAMU P V L1 |
|---|---|---|---|---|---|
| 1.01 | C GOOWN Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 68 | cum | 2,328.16 ₹1,58,314.88 | 2,265.24 ₹1,54,036.32 Lowest |
| 1.02 | Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 76 | cum | 674.68 ₹51,275.68 | 656.45 ₹49,890.2 Lowest |
| 1.03 | Providing and laying cement concrete 1:6:12, using 40mm broken stone for flooring in panels including charges for watering, curing, consolidating, paneling , cost of conveyance of all materials required etc complete | 50 | cum | 6,519.64 ₹3,25,982 | 6,343.43 ₹3,17,171.5 Lowest |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 1(cement : 2 coarse sand (zone-III)derived from naturalsources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2 | cum | 8,543.27 ₹17,086.54 | 8,312.37 ₹16,624.74 Lowest |
| 1.05 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 659 | sqm | 52.27 ₹34,445.93 | 50.86 ₹33,516.74 Lowest |
| 1.06 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 10 | cum | 1,970.1 ₹19,701 | 1,916.86 ₹19,168.6 Lowest |
| 1.07 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 5.0 in superstructure above plinth level up to floor V level in all shapes and sizes in: cement mortar 1:6 (1 cement : 6 coarse sand)including charges for watering, curing , cost and conveyance of all materials required etc complete | 7 | cum | 9,222 ₹64,554 | 8,973.89 ₹62,817.23 Lowest |
| 1.08 | Filling and finishing with approved mix 1:3 (1 cement :3 Coarse sand) in proportion recommended by the manufacturer into cracks/honey comb areas of concrete /masonry by suitable trowel /float at required thickness, including curing ,etc.complete as per directions of Engineer in Charge.Note: Wall thickness 40 cm | 68 | meter | 1,606.88 ₹1,09,267.84 | 1,563.45 ₹1,06,314.6 Lowest |
| 1.09 | Dismantling old wooden planks on ceiling of Godown including stacking of serviceable material and disposal of unseviceable materials within 50 meters lead | 696 | sqm | 53.95 ₹37,549.2 | 52.5 ₹36,540 Lowest |
| 1.10 | 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 663 | sqm | 342.02 ₹2,26,759.26 | 332.78 ₹2,20,633.14 Lowest |
Tender Value
₹63.6 L
EMD Value
₹50,000
Closing Date
24 Dec 2025, 4:00 pmClosed
The Managing Director
Kerala State Warehousing Corporation ,Warehousing Corporation road, PB No. 1727, Kochi-16
Construction of new first floor office building in new godown and other works at State Warehouse Kozhinjampara in Palakkad district under NABARD WIF scheme
2025_KSWC_821769_1
KSWC/Cotn/SW/gn/Kzpra/2025-26
Open Tender
Civil Works - Buildings
Item Rate
90 days
State Warehouse, Near Raviraj theatre, Kozhinjampa
Please refer the Tender document
9 documents required · 9 mandatory
₹2,950
₹50,000
19 Jan 2026
15 Dec 2025
27 Dec 2025
15 Dec 2025
24 Dec 2025
17 Dec 2025
17 Dec 2025 - 24 Dec 2025
Amount
C GOOWN Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
Providing and laying cement concrete 1:6:12, using 40mm broken stone for flooring in panels including charges for watering, curing, consolidating, paneling , cost of conveyance of all materials required etc complete
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 1(cement : 2 coarse sand (zone-III)derived from naturalsources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 5.0 in superstructure above plinth level up to floor V level in all shapes and sizes in: cement mortar 1:6 (1 cement : 6 coarse sand)including charges for watering, curing , cost and conveyance of all materials required etc complete
Filling and finishing with approved mix 1:3 (1 cement :3 Coarse sand) in proportion recommended by the manufacturer into cracks/honey comb areas of concrete /masonry by suitable trowel /float at required thickness, including curing ,etc.complete as per directions of Engineer in Charge.Note: Wall thickness 40 cm
Dismantling old wooden planks on ceiling of Godown including stacking of serviceable material and disposal of unseviceable materials within 50 meters lead
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Applying two coat of water thinnable cement primer of approved brand and manufature on wall surface after preparing the surface by using wire brush or emery paper, all works including cost and conveyance of all materials, labour charges, scaffolding etc. complete as per directions of Engineer in Charge
Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile) including applying additional coats wherever required to achieve even shade and colour, after preparing the surface by using wirebrush or emery paper, all works including cost and conveyance of all materials, labour charges, scaffolding etc. complete as required. :Two or more coats on new work.as per directions of Engineer in Charge
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, after preparing the surface by using wirebrush or emery paper, all works including cost and conveyance of all materials, labour charges, scaffolding etc. complete as per directions of Engineer in Charge On steel work.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two or more coats on new work, painting over the existing structure after preparing the surface by using wirebrush or emery paper, all works including cost and conveyance of all materials, labour charges, scaffolding etc. complete as per directions of Engineer in Charge.one or more coat for old work
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1.5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
Vaccum de-water flooring (VDF) by fixing channels,doing the vaccum de-watering over the placed concrete, power floating the compacted base flooring incorporating non-metallic floor hardner FH 20 or equivalent at 3kg/sqm, cutting the concrete in panels of size 4mx3m intervals by groove cutting the panels in 5mm width x 10 mm deep after 3 to 4 days of water curing, filling this gap with polysulphide sealant or any suitable flexible materials after 7 to 10 days of curing with all materials, tools, machines etc complete as per specifications and directions of Engineer in charge.
Supplying and fixing approved quality GI rolling shutter fabricated from 1mm GI laith with top cover from 0.9mm GI sheet side channel 2mm GI ,Bottom, locking plate 2mm GI and Side brackets fabricated from 10 gauge sheet , pipe shaft (40mm GI) ,ball bearings pulleys ,locking arrangements ,handle for operation etc and a coat of epoxy metal primer.cost and conveyance of all materials, labour charges, scaffolding etc. complete as per directions of Engineer in Charge
INTERLOCKING YARD- Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means.
Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory road roller of capacity 8nto 10 tonnes to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
CONSTRUCTION OF OFFICE AND TOILET AT FIRST FLOOR OF GODOWN- Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below
Dismantling Rolling shutter including frame, top cover ,hold fast etc all complete and stacking within 50 metres lead
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In lime mortar.
Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand) All works including cost and conveyance of all materials, labour charges, scaffolding etc. complete as required as per direction of Engineer -in-Charge.
Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (ZoneIII) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
6 mm cement plaster 1:3 ( 1 cement : 3 fine sand) finished with a floating coat of neat cement and thick coat of Lime wash on top of walls when dry for bearing of R.C.C. slabs and beams.
Steel work for angle (minimum thickness 5 mm) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer after preparing the surface by using wirebrush or emery paper, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes. All works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, after preparing the surface by using wirebrush or emery paper, all works including cost and conveyance of all materials, labour charges, scaffolding etc. complete as required. On steel work.as per directions of Engineer in Charge
Steel work in built up tubular- round, square or rectangular hollow tubes etc. trusses etc.,minimum thickness 3mm including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, after preparing the surface by using wirebrush or emery paper, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes. All works including cost and conveyance of all materials, labour charges, scaffolding etc. complete as required.
Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS : 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc.Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminnium snap beading for glazing /paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge.(Glazing, paneling and dashfasteners to be paid for separately): For fixed portionPowder coated aluminium (minimum thickness of powder coating 50 micron)
Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of Engineer - in -Charge. ( Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness (weight not less than 10kg/sqm)
Providing and fixing Thomson Multi wood board or equivalent make paneling 12 mm thick, to frame, backing or studding with screws etc. complete ( Frames, backing or studding to be paid separately) as per the direction of site Engineer-in-charge.
Providing and fixing false ceiling with 7.5 mm thick PVC wooden grain panel board ceiling of approved quality in aluminum frame work 25x25 mm square tube of 1mm thick with necessary screws etc complete including all transportation and labour charges as per direction of Engineer in charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Applying two coat of water thinnable cement primer of approved brand and manufature on wall surface after preparing the surface by using wire brush or emery paper, all woks including cast and conveyance of all materials, labour charges, scaffolding etc. complete as required.as per directions of Engineer in Charge
Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required:W.C. pan with ISI marked white solid plastic seat and lid
Providing and placing on terrace (at all floor levels) polyethylene water storage tank :ISI 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.
Supplying and fixing CP Towel rod 45cm or nearest available length including cost of materials and labour charges etc complete as per the direction of site Engineer-incharge.
Supplying and fixing CP Health faucet good quality including cost of materials and labour charges etc. complete as per the direction of site engineer-in-charge.
Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:White Vitreous China Wash basin size 550x400 mm with a pair of 15 mm C.P. brass pillar taps
Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS: 8931 15 mm nominal bore
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 25 mm diapipe 10kgf /cm2
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 32 mm dia pipe 10Kgf/cm2
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 50 mm dia pipe 6 kgf/cm2
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work including cutting chases and making good the wall etc. 63 mm dia pipe 6 Kgf/cm2
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 75 mmdia pipe 6 Kgf/cm2
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chased and making good the wall etc. 110 mm dia pipe 6kgf/cm2
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 63 mm dia Elbow
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement -63 dia 45 degree Elbow
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement -63x63x63 mm dia Door Tee
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 75 mm dia Vent cowl
Providing and fixing PVC moulded fittings / accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 110 mm dia 45 degree Elbow
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 110x110x75 mm dia Door Tee
Supplying and fixing solid PVC door of size 0.75 x 2.10 M using door frame 50x47x5mm and 30mm thick solid PVC for the shutter in single leaf including 18 nos 50 mm scews fixed in walls including all door fittings cost and conveyance of all materials required etc. complete as per instruction. during execution
Providing and fixing PVC ball valve ( ISI marked) of the approved brand for rigid PVC pipes,including jointing with PVC solvent cement : 32mm nominal bore
Providing and fixing floor trap of approved quality & make as per the direction of engineer in charge
Providing and laying Ceramic anti skid floor tiles of size 300x300 mm (Thickness to be specified by the manufaturer) of first quality conforming to IS : 15662,of approved make ,in all colors ,shades laid on 20 mm thick bed of cement mortar 1:4 ( 1 cement : Coarse sand ) including jointing with tile spacers and pointing with epoxy joint fillers with pigment of matching shade of approved brand in approved pattern etc., complete.
Constructing soak pit 1.20x1.20 m filled with brickbats including S.W. drain pipe 100 mm diameter and 1.20 m long complete as per standard design.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3kg/sqm including pointing the joints with white cement and matching pigment etc., complete
Providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc.complet
Supplying and installing ready made PVC Septic tank including the cost of carriage, trenching, placing at the level below ground level as specified as per the direction of engineer in charge (Provision for CC/RCC/Sand/06mm aggregate for the preparation of bed shall be paid separately)<br> 4. 35 to 50 flush capacityi cluding cost and conveyance of all materials requited etc.complete
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.
JOPHIN KA (BID ID -2446573)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.35 MB
ExperienceFormat.pdf
Tender Documents • 0.07 MB
Contletrfrtaxes.pdf
Tender Documents • 0.06 MB
Standardbiddocument.pdf
Tender Documents • 1.87 MB
BOQ_1377443.xls
BOQ • 0.39 MB
Drawing.pdf
Additional Documents • 1.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .