Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.6 LAccepted-Finance | 1 | Accepted-Finance found eligible | |
| 2 | 2₹9.9 L+₹28,500 (2.96%)Accepted-Finance BEHIND P N BANK CANAL ROAD JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | 2 | Accepted-Finance found eligible | |
| 3 | 3₹11.0 L+₹1.4 L (14.2%)Accepted-Finance | 3 | Accepted-Finance found eligible |
Tender Value
Refer Docs
Closing Date
7 Nov 2022, 2:00 pmClosed
Executive Engineer,MID Akhnoor/Nowshera
Office of Executive Engineer, MID Akhnoor Nowshera
Fabrication, providing and fitting of copper coils/strips to 400HP/300KW,BHELMake, 3phase 50HZ, 6.6KV, Slip Ring Type, vertical solid shaft HT Motor (Stator and Rotor) with allied works at LIS Rajal.
2022_IFC_192643_1
MID/AN/120
Open Tender
Electrical and Maintenance Works
Item Wise
60 days
RAJAL
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Engineer,MID Akhnoor/Nowshera
Exempted
Office of Executive Engineer, MID Akhnoor Nowshera
9 Nov 2022
17 Oct 2022
9 Nov 2022
17 Oct 2022
7 Nov 2022
21 Oct 2022
19 Oct 2022
Carriage of motor (Stator and rotor) from the pump house Rajal to workshop by suitable loading capacity load carrier for safe carriage/transportation to workshop of the firm for complete dismantling of motor which includes extraction of rotor out of stator. Cleaning the slots of the rotor with suitable chemical/solvents and then complete rewinding of rotor by way of fabrication, providing and fitting of 144 Nos of new copper strips of similar Electrolytic value /grade in 72 Nos of rotor slots, insulation with new F class insulation material such as glass, tape, mica tape, slot liner, glass tape, wedges of mica etc, soldering of all the 72 connection at both ends of the motor and the connection connecting the rotor winding the rotor cable leads, Applying Bectol Red/Grey varnishing with class F varnish of reputed make, Drying out the rotor at optimum controlled temperature as per standard practice and continuing the process till the standard maximum/required Insulation Resistance Value and Polarization Index test value is achieved, Providing /application of glass fiber resin banding at both ends of the rotor for over-hang portion of the rotor winding, varnishing the bands and providing /fitting in position of rotor connection leads of actual length and specification. Complete job includes the cost of material, labour charges including hire charges of tools and tackles required if any.
Providing and fitting of copper coils of stator by vacuum pressure impregnation procedure after proper cleaning of core/slots, making it free from oil/ grease/other deposition. The slot portions are to be wedged at the ends, centre and magnetic putty is to be inserted with adequate pressure to enhance flux linkage. Complete rewinding of the stator by way of fabrication of 54 Nos. of new copper coils from the enameled poly mica covered copper wire of suitable gauge size, shape and electrolytic grade 99.9% as per copper wire used for original coil. Insulation of coils with the new F class insulation material of high quality such glass fibre or polyester and mica impregnated or glued together with epoxy, polyester amide (polyamide or polyimide), polyurethane or other resins having superior thermal stability, slot liner, slot spacers, glass tape, fine cotton tape, wedges of mica textile etc. Insertion of new coils in 54 No. slots of stator with the help of nomex paper and separator wedges and also insertion of packing /anti vibration blocks and locking the same properly.The coil ends must be rigidly supported and adequately braced with binding rings or tapes to prevent their movement and also absorb shocks & vibrations during excessive over-loads, starting inrush currents and voltage surges. Insulation of all the 54 No. of coils connections after brazing with brazing rods (14% of silver brazing rods) by applying in layers of glass mica tape reinforced by the varnished glass sleeves. Insulating the connections of the stator coil and also cleaning connections connecting the complete stator with CRC2-26/electro. Varnishing the stator with class F Epoxy gel /varnish coat of reputed make and drying out at optimum controlled temperature as permissible in standard practice. Continuing the drying out process till the required IR value is achieved, providing /fitting in position of stator connection leads of actual length and specification. Complete job includes the cost of material, labour charges including hire charges for deployment of tools & tackles .Complete Job.
Providing and fitting of new bearings in the bearing housings a) 29338/C3 Thrust roller bearing b) 6248/C3 Ball bearing c) NU 326/C3 Cylindrical roller bearing .Complete Jo includes cost of material and labour charges including tools and tackles required for the execution of job.
Cleaning the top bearing oil chamber with flushing oil & providing and re-filling of fresh lubricating oil of actual specification up to the mark.
Carriage of the motor ( rotor and stator) from workshop of the firm to lift irrigation station Rajal, assembling of motor (rotor and stator) and placing of the motor on the motor skirt. Coupling the motor with VT pump half coupling , restoration of all electrical connections of motor to LRS, & slip rings, making proper alignment of motor with pump and adjustment thereof, tightening of all nuts, bolts/studs and Testing the motor on load for all connected parameters & commissioning for proper operation, Complete Job.
AAR PEE ELECTRICAL ENGINEERING WORKS
M D Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .