Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | ₹1.9 L Quoted ₹2.3 L | L1 | Accepted-AOC AOC |
| 2 | L1₹2.3 LRejected-Finance | ₹2.3 L | L1 | Rejected-Finance L1 |
| 3 | L1₹2.3 LRejected-Finance | ₹2.3 L | L1 | Rejected-Finance L1 |
| 4 | L1₹2.3 LRejected-Finance | ₹2.3 L | L1 | Rejected-Finance L1 |
| 5 | L1₹2.3 LRejected-Finance | ₹2.3 L | L1 | Rejected-Finance L1 |
Tender Value
₹2.7 L
EMD Value
₹26,995
Closing Date
20 May 2026, 3:00 pmClosed
CHIEF ENGINEER, KMC
motijheel
improvement of puliya near Nitin Sweet house in raje nagar ward 87 under zone 3
2026_NNKAN_1149928_1
75/AA-2/26-27
Open Tender
Civil Works
30 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹26,995
13 Jun 2026
18 May 2026
20 May 2026
18 May 2026
20 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of RCC of reinforcment brick work including stacking of material etc all complete work. | 1 | sqm | 1,200 | ₹1,198.8 |
| 2 | Dismenteling of Brick including stacking of dismentled material etc all complete work. | 7.7 | Cum | 580 | ₹4,466 |
| 3 | Dewatering /Watering of water by diesel pump including hire charges of pump, pump operater, fule, cartage of pump at site including all complete. Work ( 228.00 per 8 hus in a day=1824/day) | - | days | 1,824 | - |
| 4 | Earth work in Excavation in trenches for foundations pipes Cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in distance of 50 mtr. | 1 | cum | 215 | ₹214.79 |
| 5 | Providing and Laying Cement Concrete(1:4:8,1 cement:4 fine sand:8 Brick ballast nominal size 40mm) and curing complete,including cost of formwork in foundation and floors. | 2.73 | cum | 5,740 | ₹15,670.2 |
| 6 | Class-150 Brick workin (1:4) cement mortar in Foundation & Plinth including supply of all Materials Labour and Tool & Plants etc, required for proper completion of the work | 1 | cum | 6,600 | ₹6,593.4 |
| 7 | 12mm Thick Cement plaster1;4 in single coat on Both side of single or half brick wall for interior plasting upto flor two level including internal rounded angles chamfers and/or rounded angles not exceeding 80mm in girth and finishing even and smooth. | - | sqm | 200 | - |
| 8 | RCC work with cement concrete 1:1.5:3, 1 Cement:1.5 Coarse sand: 3 stone Agregate including all completion of work for slab. | 1 | cum | 8,720 | ₹8,711.28 |
| 9 | Mild steel or Iron in Reinforcement including all completion of work. | 0.8 | qtls | 7,200 | ₹5,759.93 |
| 10 | Sale of materials bricks with all completion | - | nos | -7.2 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.66 MB
100stamp.pdf
Tender Documents • 0.30 MB
BOQ_2153122.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid