Loading…
Loading…
Tender Value
₹2.4 L
EMD Value
₹4,840
Closing Date
16 Jul 2026, 6:00 pm
Er. Rakesh Kumar
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
Please refer to BOQ
2026_PWDJK_314941_10
26 of 2026-27 dated 06-07-2025
Open Tender
Civil Works
30 days
Samba
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
₹4,840
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
7 Jul 2026
7 Jul 2026
17 Jul 2026
7 Jul 2026
16 Jul 2026
7 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles above 25 mm and upto 40 mm | 45 | Sqm | 87.5 | ₹3,937.5 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) with all leads and lifts carriage complete. | 4.73 | Cum | 4,826.5 | ₹22,829.35 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with all leads and lifts carriage complete | 3.45 | Cum | 5,733.6 | ₹19,780.92 |
| 4 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 134.1 | Sqm | 816.15 | ₹1,09,445.72 |
| 5Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 5.1 | Foundations, footings, bases of columns etc. for mass concrete. | 15 | Sqm | 286.35 | ₹4,295.25 |
| 6 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 450 | Kg | 181.6 | ₹81,720 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.82 MB
BOQ_1020316.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid