| Sl No | Description | Qty | Unit | Dile Ram L2 | MAYA RAM L1 |
|---|---|---|---|---|---|
| 1.00 | Boulder filling dry hand packed tightly under floors. | 37.47 | Cum | 2,500 ₹93,675 | 2,498 ₹93,600.06 Lowest |
| 2.00 | Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded stone aggregate 40mm nominal size) excluding cost of centring & shuttering in foundation and plinth. | 16.65 | Cum | 9,500 ₹1,58,175 | 9,476 ₹1,57,775.4 Lowest |
| 3.00 | Providing and laying cement concrete 1:1.5:3 (1 Cement : 1.5 Sand : 3 graded stone aggregate 20 mm Nos.minal size) and curing complete excluding cost of form work and reinforcement and reinforced concrete work in : - | 1.99 | Cum | 10,500 ₹20,895 | 10,392 ₹20,680.08 Lowest |
| 4.00Providing form work with steel plates 3.15mm thick welded with angle iron 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batten and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 metres and removal of the same for insitu reinforced concrete & plain conrete work in. | |||||
| 4.01 | Vertical surface such as walls(any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like | 13.28 | Sqm | 420 ₹5,577.6 | 404 ₹5,365.12 Lowest |
| 5.00 | Providing mild steel/tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level. | 179.25 | Kg | 95 ₹17,028.75 | 88 ₹15,774 Lowest |
Tender Value
₹2.9 L
EMD Value
₹5,870
Closing Date
27 Dec 2025, 11:00 amClosed
Executive Engineer Jal Shakti Division Thunag
o/o Executive Engineer Jal Shakti Division Thunag
CO Boulder filling CC 1 3 6 cement store 2nd floor at odidhar
2025_HPIPH_123730_2
7836-86 DT 16/12/2025
Open Tender
Civil Works - Water Works
Item Rate
90 days
Thunag
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
₹5,870
Yes
9 Mar 2026
17 Dec 2025
27 Dec 2025
17 Dec 2025
27 Dec 2025
17 Dec 2025
Boulder filling dry hand packed tightly under floors.
Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded stone aggregate 40mm nominal size) excluding cost of centring & shuttering in foundation and plinth.
Providing and laying cement concrete 1:1.5:3 (1 Cement : 1.5 Sand : 3 graded stone aggregate 20 mm Nos.minal size) and curing complete excluding cost of form work and reinforcement and reinforced concrete work in : -
Providing form work with steel plates 3.15mm thick welded with angle iron 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batten and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 metres and removal of the same for insitu reinforced concrete & plain conrete work in.
Vertical surface such as walls(any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like
Providing mild steel/tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
f6.pdf
Tender Documents • 0.88 MB
Termsncondition.pdf
Tender Documents • 0.23 MB
BOQ_181783.xls
BOQ • 0.23 MB
F8.pdf
Tender Documents • 1.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .