| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹50.5 L (40.5%)Admitted-Finance E 60 INDUSTRIAL AREA HARIDWAR 249401 | HARIDWAR | HARIDWAR | UTTARAKHAND | 249401 | ₹1.8 Cr+₹50.5 L (40.5%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical 904 27 BARAKHAMBA ROAD CENTRAL DELHI DELHI 110001 | NEW DELHI | DELHI | 110001 | - | - | Rejected-Technical Not qualified in PQ criterion of Tender |
| Sl No | Description | Qty | Unit | Fibretech L1 | GOGOAL HYDRO PVT. LTD. L2 |
|---|---|---|---|---|---|
| 1.00 | Preliminary Survey of machine | 1 | Job | - | - |
| 2.00 | Dismantling of the Machine. | 1 | Job | - | - |
| 3.00 | Post –Dismantling Inspection, Testing , Measurement and Analysis | 1 | Job | - | - |
| 4.00 | Repair of Kaplan Runner Blades (04 Nos.) | 1 | Job | - | - |
| 5.00 | Repair of Guide Vane (24 Nos.) | 1 | Job | - | - |
| 6.00 | Repair, re-babitting, Dye-Penetration test and Ultrasonic test of GGB/UGB, TGB and Thrust Bearing Pads | 1 | Job | - | - |
| 7.00 | Repair of Guide Vane Bearing body assemblies – 24 Nos | 1 | Job | - | - |
| 8.00 | Repair of Runner Hub | 1 | Job | - | - |
| 9.00 | Repair of Runner cone | 1 | Job | - | - |
| 10.00 | Repairing of Stay Vanes -12 Nos | 1 | Job | - | - |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
8 Jan 2020, 5:00 pmClosed
EE(M n G) Kulhal UJVNL
Office of EE(M n G) Kulhal UJVNL Pin 248142
Capital Maintenance of Unit B of Kulhal Power Station (3x10 MW)
2019_UJVN_21237_1
e-14/UJVNL/EE(M n G)/KPS/2019-20
Open Tender
Repair and Maintenance Works
Item Rate
120 days
Kulhal Power Station UJVNL Dehradun
as per tender document
2 documents required · 2 mandatory
₹11,800
Dy. General Manager, HGC, UJVN Limited, Dhakrani
₹2.6 L
Yes
16 Jan 2020
25 Nov 2019
9 Jan 2020
25 Nov 2019
8 Jan 2020
25 Nov 2019
Amount
Preliminary Survey of machine
Dismantling of the Machine.
Post –Dismantling Inspection, Testing , Measurement and Analysis
Repair of Kaplan Runner Blades (04 Nos.)
Repair of Guide Vane (24 Nos.)
Repair, re-babitting, Dye-Penetration test and Ultrasonic test of GGB/UGB, TGB and Thrust Bearing Pads
Repair of Guide Vane Bearing body assemblies – 24 Nos
Repair of Runner Hub
Repair of Runner cone
Repairing of Stay Vanes -12 Nos
Repair of Runner Chamber-01 No
Repair of Top Cover Liner surface -01 Nos
Supply of SS stud with nut of size M-27
Repair of Guide Vanes Servo Motor -02 Nos
Repair of Regulating Ring-01 No
Repair of Governing System & OPU system-01 No
Repairing of Upper bracket and turbine pit cover-01 No
Repairing and replacement of clean water system-01 No
Supply of wire mesh for buckets
Supply of 50 mm dia MS seamed pipe line(Jindal/Tata make)-80 mtr
Supply of 50 mm dia MS long bend-10 Nos
Supply of 50 mm dia MS Short bend-10 Nos
Repair of Turbine Shaft assembly-01 No
Supply of SS shaft journal and its fasteners
Repair of Pivot Ring (01 No
Overhauling of Generator Stator Assembly
Supply of Carbon Brushes: 84 Nos.
Overhauling of Generator Rotor, Rim, Spider and their Poles Assembly
ELCID testing, Wedge Deflection Tests and Other tests on Generator Stator/ Generator Rotor after repair
Replacement of Water cooling Pipeline along with Lagging & Valves, Laying of GI pipe line of 3/4"arround the stator and laying of 1" GI pipe line upto the drain point
Supply of seamless MS pipe line -100 mm dia (Jindal/Tata make), Supply of 15 mm GM gate valve, (Leader/Neta/IS-778 class -1)(Nut and bolt TVS/LPS/As per IS slandered).Supply of flanges, fastener (Nut and bolt TVS/LPS/As per IS standered and other consumable item shall be provided by contractor)
Supply of Cast Steel 150 mm diameter glove valve for water for Stator Air Cooler (as per tech spec and scope of work describe in F-19)
Supply of Cast Steel 100 mm diameter glove valve for water for Stator Air Cooler)
Supply of Cast Steel 50 mm diameter glove valve for water for Stator Air Cooler
Supply of GI pipe line-1” length 30 mtr
Supply of GI pipe line-¾”length 24 mtr
Overhauling and Repairing of all the Brake /Jack assemblies (06 Nos.)
Overhauling of AVR (Automatic Voltage Regulator) System
Replacement of Instruments
Supply of RTD: 30 NO.
Supply of TSD: 14 NO.
Supply of Pressure Gauge: 20 NOS.
Temperature Scanner (01 NO.)
Techo meter as per sample-01 No
Guide apparatus meter as per sample-02 Nos.
Pressure grouting of runner chamber and epoxy painting of spiral casing
Painting of all metallic parts
Reassembly, Alignment, Leveling & Re-commissioning of the Unit
Testing, Commissioning, Dry Out and Synchronization
GOGOAL HYDRO PVT. LTD.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
tenderdocument14.pdf
Tender Documents • 1.03 MB
BOQ_25351.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .