| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.4 LAccepted-AOC ERATTUPETTA BLOCK PANCHAYATH KERALA | 1 | Accepted-AOC 1 | |
| 2 | 2₹6.7 L+₹32,825.64 (5.16%)Accepted-AOC MUKALEL HOUSE KUMILY | IDUKKI | KERALA | 685501 | 2 | Accepted-AOC 2 |
Tender Value
₹7.6 L
EMD Value
₹19,060
Closing Date
31 Jan 2024, 2:00 pmClosed
Assistant Engineer
Assistant Engineer
Proj no64Thidanadu Division 13th ward DRINKING WATER PROJECT PIPE LINE MOTOR INSTALLATION AND RELATED ACTIVITIES
2024_LSGD_648218_1
2023_LSGD_635339_1
Open Tender
Civil Works - Others
Item Rate
180 days
Erattupetta block
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,685
Yes
₹19,060
Yes
24 Apr 2024
23 Jan 2024
2 Feb 2024
23 Jan 2024
31 Jan 2024
23 Jan 2024
Amount
Protection wall
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Water tank
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
22.6:Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured)
Jomy Mathew
Bidder Name
Jomy Mathew
Denny Jose
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_994799.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .