Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.3 LAccepted-AOC | L1 | Accepted-AOC work awarded | |
| 2 | L2₹81.7 L+₹44,464 (0.55%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹81.9 L+₹64,941 (0.80%)Rejected-Finance SHOP NO 1 154 1 G F BLDG KINARA WARD NO 2 SANGUEM GOA | L3 | Rejected-Finance L3 | |
| 4 | L4₹83.6 L+₹2.3 L (2.84%)Rejected-Finance H NO 245 A NEAR PRIMARY SCHOOL NIRMALANAGAR XELDEM QUEPEM GOA 403705 | XELDEM | QUEPEM | GOA | 403705 | L4 | Rejected-Finance L4 | |
| 5 | L5₹97.0 L+₹15.8 L (19.4%)Rejected-Finance H NO 18 272 SHIRWAI QUEPEM GOA | QUEPEM | SOUTH GOA | GOA | L5 | Rejected-Finance L5 |
Tender Value
₹88.8 L
EMD Value
₹1.8 L
Closing Date
18 May 2023, 4:00 pmClosed
EE XII, WRD
Gogal Margao Goa
Construction of flood protection wall RHS river bank in Sy. No. 91/10A and 3/6 at Dattawadi Capxem of Sanvordem Village in Sanguem Taluka
2023_WRD_8404_1
WDXII/TECH/F10/01/2023-24 /Sr1
Open Tender
Civil Works
Item Rate
120 days
Gogal Margao
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,000
₹1.8 L
9 Apr 2025
24 Apr 2023
22 May 2023
24 Apr 2023
18 May 2023
24 Apr 2023
Amount
Earthwork in excavation by mechanical means in all type of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and such material either in full or in parts, as the case may be adopting any approved method or methods as may be convenient or permitted incl. chiseling, wedging etc. but blasting prohibited in all condition such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring and bracing, removal of stump and other deleterious matter, dresing of sides and bottom and backfilling the excavated earth to the extent required and disposal of excavated soil/rock at specified areas within 50mts leads and lifts etc as per specification and drawing and as directed by the Engineer-in-charge.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level.
b) In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.
Centering and shuttering including struttings, propping etc. and removal of formwork fo ra) Foundations, footings, bases for columns and mass concrete.
b) vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer-in-charge. a)110mm dia.
Paresh G. Kamat & Associates
GOVIND BHIKU NADKERNY & ASSOCIATES
M/S UNIQUE CONSTRUCTIONS
Manju Shankar Gavli
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .