Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
31 Jul 2025, 10:00 amClosed
SM(P AND P)
SENIOR MANAGER PROJECTS AND PLANNING PD ADMINISTARTION FACT
Stack Emission Monitoring in FACT,Udyogamandal complex
2025_FACT_867920_1
3003/2025-2026/E31785
Limited
Miscellaneous Works
Item Rate
365 days
UDYOGMANDAL
LIMITED TENDER
5 documents required · 5 mandatory
₹0
₹2,000
Yes
1 Aug 2025
9 Jul 2025
1 Aug 2025
9 Jul 2025
31 Jul 2025
9 Jul 2025
Stack Emission Monitoring in FACT,Udyogamandal complex
Chimney No:15 Sulphuric acid plant Pollutants: SO2 Acid Mist
Chimney No.25. Amophos III stage 300 TPD. Pollutants: NH3,SPM, Fluoride.
Chimney No.32. Amophos IV thStage 150 TPD. Pollutants: NH3,SPM, Fluoride
Chimney No.EV2. New Ammonium Sulphate. Pollutants: NH3,SPM.
Chimney No.H 101.Oil fired heater AC north. Pollutants: SPM ,SO2,CO.
Chimney No.H205.oil fired heater AC South. Pollutants: S P M, SO2, CO.
Chimney No.H 206 LNG Heater. Pollutants: So2, CO and SPM
Chimney No.H 2101. CPP boiler stack. Pollutants:S P M, SO2, CO.
Chimney No.X 201. A C Reformer Stack. Pollutants: S P M, SO2, CO
Chimney No.S 101.III rd stageparamount stack. Pollutants: NH3, SPM, FluoridE
Sampling and Analysis of ST-1Stack of Hyam plant. Parameters to be analysed are Nitrogen Dioxide and Nitric Oxide, Sulphur dioxide and Ammonia . Frequency once per month Minimum.
Sampling and Analysis of ST-3Stack of Thermal Oil Furnace. Parameters to be analysed are Sulphur dioxide,Carbon Monoxide,and SuspendedParticulate Matter. Frequency once per month Minimum
Sampling and Analysis of ST-4Stack of Captive power plant. Parameters to be analysed are Sulphur Dioxide, Carbon Monoxide and Suspended Particulatematter. Frequencey - Once per month minimum
Sampling and Analysis of ST-5Stack of Startup Boiler. Parameters to be analysed are Sulphur Dioxide, Carbon Monoxide and Suspended Particulatematter. Frequencey - When emissions on line / 2 times minimum per year.
Sampling and Analysis of EV-1Stack of Caustic Effluent Incineration Plant. Parameters to be analysed are Sulphur Dioxide,Nitrogen Dioxide and Nitric Oxide and SuspendedParticulate matter. Frequencey - Once per month
Ambient Air.at a location in PD specified at the time of request PollutantsRPM , Lead ,Frequency - on request
Cochin Test House (BID ID -3250509)
stage.html
html • 0.02 MB
finance_912355.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .