Loading…
Loading…
Tender ID
Tender Value
₹4.3 Cr
EMD Value
₹2.7 L
Closing Date
20 May 2026, 5:30 pmClosed
Chief General Manager (Thermal)
Biennial Rate Contract for Picking of Stones & foreign materials from running belt conveyors of Lignite Handling System for two years of contract period (2026-28)
297395
SLPP/LHS/SP/2026-28
Open
Services
Service
Surat
₹2,950
Gujarat Industries Power Co. Ltd.
₹2.7 L
30 Apr 2026
30 Apr 2026
30 Apr 2026
20 May 2026
30 Apr 2026
technical Bid in
E-Reverse Auction Will be informed by GIPCL to all qualified Bidders
1. Amendment / corrigendum of the tender document, forms, schedules, etc... may be
done any time by the GIPCL during the period of publication of tender in the website.
The Bidders are required to visit the website regularly till the last date & time of Bid
2. GIPCL reserves the right to reject any or all the tenders without assigning any
reason thereof.
3. The Bidders are required to quote the rate strictly as per the terms and conditions
mentioned in the tender document, adhering to technical specifications as well.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
4. The conditional tender will not be entertained and shall be liable for rejection.
5. Bidders are advised to upload the tender well in advance to avoid delay in
submission of tenders due to n-procure site related issues. In case of any issues /
difficulties cropping up during on line uploading / submission of documents, bidders
are requested to inform these well in advance (at least two days before closing of
tender) to (n) Code Solutions as mentioned in Section-B of tender and as well as to
GIPCL mail to [email protected]
6. The Bidders are required to submit their Bids online only through the website
https://tender.nprocure.com
7. The supporting documents in physical forms along with EMD DD/BG or detail of
RTGS/Online payment for EMD and Tender fee are to be submitted only at the
following address: -
Chief General Manager (Thermal)
Gujarat Industries Power Company Limited
Surat Lignite Power Plant
At Village: Nani Naroli,
Taluka: Mangrol,
Dist.:Surat-394 110, Gujarat.
E-Mail:[email protected]
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
INSTRUCTIONS TO BIDDERS
1. PLANT SYNOPSIS
Gujarat Industries Power Company Limited (GIPCL) (henceforth be named
Company/GIPCL), is a Premier Power Utility in the State of Gujarat with an installed
capacity of 1859.40 MW comprising of various conventional and renewable projects.
GIPCL commissioned its first power project: a 145 MW gas based combined cycle power
plant in 1992 at Vadodara. It expanded its capacity by 165 MW Neptha and Gas based
Combine Cycle Power Plant at Vadodara in
Surat Lignite Power Plant (SLPP) with four units of 125 MW capacities each is located at
Village: Nani Naroli, Taluka: Mangrol, District: Surat in Gujarat. GIPCL has also operating
its own captive Lignite and Lime Stone Mines close to the Power Plant. The Power Plant is
based on Circulating Fluidized Bed Combustion (CFBC) technology for the Boilers, where
Lignite is burnt along with Lime Stone in the Combustor of the Boiler.
It commissioned 5 MW Solar Power Plant on the Vastan Mine dump top adjacent to Surat
Lignite Power Plant in January 2012. Also, GIPCL has commissioned 1MWp Distributed
Solar Power Projects at two locations in Gujarat viz. at Village: Amrol, Dist.: Anand in April,
2016 and at Village Vastan, Taluka Mangrol, and Dist.: 2016. Surat in May 2016. GIPCL
has successfully commissioned a 2 X 40 MW Solar Project in September 2017 as well as
a 75 MW Solar Power Project in June 2019 at Gujarat Solar Park, Village Charanka, Dist.:
Patan. GIPCL has also successfully commissioned 112.4 MW wind farms at different
location of Gujarat. The Company has commissioned the 100 MW Solar Project at the
Raghanesda Solar Park, Banaskantha, Gujarat on August 2021. The Company has also
commissioned 75 MW Solar project at Vastan Lignite Mine, Tal. Mangrol, Dist. Surat,
Gujarat in June 2025. The Company has also developed 2375 MW Renewable Energy
Park at Khavda in the Kutch district of Gujarat in Dec
Surat Lignite Power Plant (SLPP) is accessible by road from Kim and Kosamba, which are
on Mumbai-Ahmadabad highway. From Kosamba, SLPP is around 32 km, out of which
km is part of the National & State Highway and balance 5 km is District Road. From Kim,
SLPP is around 18 km, out of which 13 km is the State Highway and balance 5 km is
District Road. The nearest Broad Gauge Railway Line is at Kim, which is around 21 km
from the SLPP. Surat is approximately 50 km from the SLPP. Location Map for SLPP is as
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
The Company intends to award Tender for: Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for 4 x
MW Surat Lignite Power Plant for a period of two years (2026-28)” at SLPP and is
therefore inviting open tenders online https://tender.nprocure.com along with provision of e-
Reverse auction from experienced & resourceful contractors.
2. SCOPE OF WORK :-
Followings will be in the detail scope of work of the contractor:
1) Deployment of manpower for removal of stones, boulders, foreign materials,
very large size of lignite and tramp metal from running conveyor belts at
different locations i.e. BCN-M1A, S/R out plant machine boom conveyor, BCN-
M2A, BCN-M3A, BCN M7, BCN M4, ELHS S/R machine boom conveyor,
BCN 2C, BCN 6A & BCN 6B as requirement of plant operation (deployed
manpower shall be allowed to trip the belt o n l y to remove large size of
stones/lignite and foreign materials from the system).
2) Stones, boulders, foreign materials removed from both conveyor and bunker
grill to be cleared from gallery and bunker grill on daily basis or as directed by
engineer-in-charge
3) Contractor should deploy Supervisor / safety sergeant in all three shifts, which
shall be responsible for availability of adequate manpower and their safe
execution of the job during shift, including proper use of personal protective
equipment by all the personnel being deployed.
4) Contractor to designate a person as a site supervisor to look after and
coordinate the daily activities. The supervisor shall report to concerned
engineer of GIPCL and get the job certified on daily/shift basis. The daily
reports duly certified by GIPCL engineer shall be submitted along with the
monthly bill and the payment shall be made on the basis of the same.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
5) Stone pickers can be deployed in other areas if felt necessary at the direction
of engineer-in-charge.
6) Work shall be executed strictly as per the instructions of engineer-in-charge
and as per the requirement of GIPCL.
General scope of work:-
1. All tools and plants and consumables shall be in the scope of contractor.
2. During monsoon period if manpower is idle than, all the manpower shall be
utilized for chute chock up removal at LHS.
3. Contractor shall make their own arrangement for transportation of manpower.
3. GENERAL INSTRUCTIONS:-
3.1 The Bidders who are interested in participating in the tender must read and Comply
with the instructions and the Terms & Conditions contained in the tender
3.2 The Bids shall be filled in by the Bidders clearly, neatly and accurately. Any
alteration, erasures or overwriting shall be liable to make the tender invalid unless
the same is neatly carried out and attested over the full signature of Bidder. The
decision of the Company to interpret the information and rates filled in by the
Bidder shall be final and binding on the Bidder.
3.3 The Bidders are requested to make themselves fully conversant with the General
Conditions of Contract, Special Conditions of Contract, Technical Specifications,
Site conditions, Safety &Health Aspects and Norms to be observed etc. before
submitting their bids so that no ambiguity arises in these respects subsequent to
submission of the Bids.
3.4 Before quoting the rates, the Bidder should go through the specifications, scope of
work etc. and get himself fully conversant with them. The Bid should include cost
of mobilization and cost to adhere to all Safety Norms as described in the tender.
No relaxation or request for revision of quoted/accepted rates shall be entertained
subsequent to the opening of Bid on account of mobilization or Safety costs.
3.5 Splitting of work is not advisable.
3.6 Bidder has to submit all the information as per required Bid document. Failure to
furnish all the information as per required Bid documents or submission of a Bid
containing deviations from the contractual terms and conditions, specifications and
requirements, shall be rejected.
3.7 The Bids shall be submitted within the time frames set out in the Notice Inviting
Tender (NIT) and Bids submitted thereafter shall not be accepted and considered.
3.8 The tender documents shall not be transferable.
3.9 The Bidders are expected to examine all instructions, forms, terms & specifications
in the Bid documents and to get fully acquainted themselves with all the conditions
and matters which may affect the subject matter of the work/tender or the cost
thereof. If any Bidder finds any discrepancies or omissions in the specifications
and documents or any doubt in true meaning or interpretation of any part, he shall
seek necessary clarifications in writing or during Pre-Bid meeting if required.
3.10 Conditional offers shall not be considered and liable to be rejected.
3.11 The Company reserves the right to extend the deadlines for submission of the Bids
by giving amendments.
3.12 During evaluation of Bids the Company may, at its discretion ask the Bidder(s) for
clarification of their Bid. The request for clarification and the response shall be in
writing and no change in prices or substance of the Bid shall be sought, offered or
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
3.13 The Company reserves the right to amend/ modify the Bidding documents at any
time prior to the deadline for submission of Bids, either at its own discretion or in
response to the clarification requested by a prospective Bidder. In such case, the
Company may in its discretion extend the deadline for submission of Bids in order
to facilitate the prospective Bidders for incorporating the effect of the amendment
3.14 The Bidders shall bear all costs and expenses associated with the preparation and
submission of their respective Bids, to attend meetings or conferences, if any,
including any pre award discussion with the successful Bidder, technical and other
presentations etc. and the Company shall not be liable for any expense thereof.
3.15 If the successful Bidder is a joint venture, formed of two or more companies, the
Bidder along with the partners shall accept joint and several responsibilities and
liabilities for all obligations under the Contract.
3.16 Timely and satisfactory completion of the work and strict adherence to the allotted
time frames for jobs shall be the essence of the contract.
3.17 The Company reserves the right to qualify/disqualify any applicant without
assigning any reason.
3.18 The Bidder shall be disqualified if any untrue statement or misrepresentation is
made in the Bid forms, attachments and other supporting documents submitted by
3.19 GIPCL reserves the right to opt for e-Reverse Auction of the subject work at the
sole discretion of GIPCL.
3.20 To participate in e-Reverse Auction, bidders have to register on nProcure’s e-
Auction Portal: https://e-auction.nprocure.com.
3.21 After e-Reverse Auction process, L1 bidder shall be decided on lowest offered rate
amongst other bidders during specified e-Reverse Auction process.
3.22 Schedule & other details for e-reverse Auction will be intimated later on to the
eligible bidders.
4. PLANT VISIT:-
The Bidder is advised to visit the Surat Lignite Power Plant (SLPP) after downloading the
tender copy from website: http://etender.gipcl.com or https://tender.nprocure.com to study
the actual working conditions, before submitting their offer. The Bidders shall examine the
site of works and its surroundings and see for himself that may be necessary for preparing
the Bid and entering into a contract. All costs and liabilities arising out of the site visit shall be
at Bidder’s account.
The submission of tender by a contractor implies that he has read these instructions,
conditions of the contract etc. and has himself aware of the scope, nature of works &
specifications of the works to be done. GIPCL will not, therefore after acceptance of
contractor’s rate, pay any extra charges for any other reason in case the contractor is found
later on to have misjudged the site conditions.
Any error in description or quantity or omission in the contract document shall not vitiate the
contract or release the contractor from executing the work comprised in the contract
according to scope of works, magnitude of the works, requirement of materials, equipment,
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
tools & tackles, labour, etc. Contractor has to complete the work in accordance with the
contract documents irrespective of any defects, omissions or errors that may be found in the
contract documents.
The Bidder is deemed to have examined and understood the tender document, obtained his
own information in all matters whatsoever that may affect the works to be carried out
especially mentioned or works which may have to be carried out to fulfill his contractual
obligation within the scheduled rates and to have satisfied himself to the sufficiency for his
BIDDER shall inspect the site, examine and obtain all information required and satisfy
himself regarding matters such as access to site, communication, transport, working
condition including constraint of work place, confined area, quantum of dusting, running
equipment, importance of work, round the clock working conditions, safety requirements,
right of way, high flood level in River, flow of water during monsoon/dry season in the
River/Nallah, the type and number of equipment and facilities required for the satisfactory
completion of work, the quantity of various items of the work, the availability of local labour,
availability and rates of material, local working conditions, uncertainties of weather,
obstructions and hindrances that may arise, etc which may affect the work or cost thereof,
before submission of his Bid. Ignorance of site conditions shall not be accepted by the
GIPCL as basis for any claim for compensation. The submission of a Bid by the BIDDER
will be construed as evidence that such an examination was made. Any later claims /
disputes in regard to rates quoted shall not be entertained or considered by the GIPCL.
The rates quoted by BIDDER shall be based on his own knowledge and judgment of the
conditions and hazards involved and shall not be based on any representations of the
5. ELIGIBILITY CRITERIA:-
The following criteria shall be adopted for qualifying the Bidders for further
5.1 Bidder should have worked in Stone picking from running conveyors at
thermal power plants only of having capacity not less than 1000 TPH and speed
of belt 2.75 meters per second for three years of experience out of last five
years in similar jobs and should enclose proof of the same. Bidder shall
submit necessary evidence for the same like attested copies of work orders along
with work completion certificates from clients. The work completion certificate
shall comprise of Order value & Executed value. Bidders should have
executed the work directly. The work executed as a sub-contractor or subletting
agency shall not be taken in to consideration.
Note: For evaluation of the bid, the executed value mentioned in the work
completion certificated will be considered.
5.2 Bidder should produce evidence of having experience of successfully completed
similar works as defined hereunder during last three years ending last day of the
month previous to the one in which tender is invited, satisfactory progress of
ongoing works etc. secured from clients along with certified copies of documentary
evidence preferably photo copies of work experience. The experience should be
either of the following:
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
One similar completed work costing not less than the amount equal to
Rs. 2,57,71,529 /- with taxes and duties.
Two similar completed works each costing not less than the amount
equal to Rs. 1,71,81,019 /- with taxes and duties.
Three similar completed works each costing not less than the amount
equal to Rs. 1,28,85,764 /-with taxes and duties.
Bidder should specifically mention fulfilling of above criteria in his offer along
with details of work orders & work completion certificates issued by clients.
5.3 Contractor shall have to submit satisfactory work completion/execution certificate
from the client including ongoing/existing contracts. Experience as a sub-
contractor will not be allowed and Price Bid of such Bidders will be rejected.
5.4 Tender fee: The tender fee (non refundable) shall be submitted through RTGS or
through online payment as per details provided in clause no. 7 herein under.
5.5 EMD: The EMD shall be accompanied in the form of DD/RTGS or Bank
Guarantee given by Bank as described in subsequent clause no.
5.6 Bidder should have separate Employees Provident Fund code number towards
registration of firm with RPF commissioner.
5.7 This is a skilled and specialized job and as such the details regarding the
training imparted to the workers to develop vision and to pick up stones /
shales from running fast moving conveyors is to be furnished, if GIPCL
5.8 The experience of the bidder should be in the name of the firm only on
whose Name the tender is purchased.
5.9 Attested copies of relevant documents duly signed & seal on each & every page
shall be submitted. The above documents will be analyzed and after satisfaction,
the Price Bid will be open. GIPCL may verify the documents, experience
certificates issued by concern authority. After opening of technical Bid, if any
required attested documents found missing in the Technical Bid submitted by
the Bidder, the tender inviting authority may inform to that Bidder only once
by E-mail to submit the missing required documents within stipulated time limit.
If Bidder/Bidders fail to submit within stipulated time, their Bid will be declared
technically disqualified and no further correspondence will be entertained.
5.10 Bidder should have annual average turnover of at least Rs. 1,28,85,764 /-with
taxes and duties for last three financial years. i.e. 2022-23, 2023-24 & 2024-
25. Bidder shall furnish proof for the last three financial years to demonstrate
the financial healthiness of the company. The balance Sheet must be in the
name of the company. Any type of MOU for this purpose will not be entertained.
Note: In case, the annual turnover is less than the statutory guideline which does
not require audit, the bidder shall submit the turnover certificate from Chartered
5.11 The Bidder has to submit INCOME TAX Permanent Account Number (PAN).
Copies of the same shall be submitted.
5.12 Bidder has to submit GST registration number. Copy of the same shall be
5.13 In case Bidder is a joint venture company since last five years, the above
requirements/credential of Joint Venture Company / Parent companies shall be
5.14 Certificate from a qualified Chartered Accountant who should be a member of
the Institute of Chartered Accountants of India is to be submitted regarding the
Net worth at the end of the last financial year 2024-25 which should be
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
5.15 Entire tender document shall be submitted duly signed & stamped by bidder on
each page as a token of having acceptance of all terms & conditions,
specifications, scope etc of tender document.
5.16 This is a skilled and specialized job and as such the details regarding the
training imparted to the workers to develop vision and to pick up stones /
shales from running fast moving conveyors is to be furnished, if GIPCL
5.17 The experience of the bidder should be in the name of the firm only on whose name
the tender is purchased.
5.18 ADDITIONAL PRE QUALIFICATION CRITERIA
1) If Bidder or its Partner(s) or Director(s) is /are/was in any Litigation(s), Court Case(s)
or Arbitration(s), either completed or under progress during last five(5) years or
Black Listed / Deregistered / Stopped or banned from dealing in the past by any
Govt. of Gujarat Undertakings / Depts. / Authorities and Govt. of Gujarat supported
companies / undertakings / organizations, Bid of that party will be liable to be
rejected. Bidder agrees and undertakes to accept decision of GIPCL in this regards
as final and binding on the Bidder without any demur and that no further
correspondence shall be done in this regard at any stage.
2) Bidder shall have to submit the “Declaration-cum-Undertaking for Compliance of
Safety Laws and Regulations” as amended in Annexure -G attached.
a. If any Major violation of any safety law(s) / Rule(s) is / are found during the
preceding Three (3) years, bid of that party will be liable to be rejected. Bidder
agrees and undertakes to accept decision of GIPCL in this regards as final and
binding on the Bidder without any demur and that no further correspondence
shall be done in this regard at any stage.
b. If any of the details submitted in the prescribed Annexure / Form to the Bid is/are
found to be false, incorrect at any time in future, then the Contract awarded to
that Bidder / Contractor shall be liable to be terminated forthwith without any
notice / correspondence and Bidder agrees and undertakes to accept decision of
GIPCL in this regards as final and binding on the Bidder without any demur and
that no further correspondence shall be done in this regard at any stage. Further,
Performance / Security Deposit will also be liable to be forfeited. Any dues to
GIPCL from the Bidder / Contractor shall be recovered from the pending bills or
any other dues payable to the Bidder / Contractor, if any or otherwise through
any other recourse available under the Laws.
5.19 The experience of the bidder should be in the name of the firm only on whose
name the tender is purchased. Bidder has to fill the Annexure- R mentioning the
documents submitted in support of each qualification criteria. Document mentioned
in the Annexure-R against each Qualification criteria will only be considered for
evaluation of eligibility.
The Bidder shall submit all the evidences, documents, attested copies of work orders & work
completion certificates etc… as a proof with EMD & Tender Fee and also provide the
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
requisite details online for meeting the prequalification requirements. GIPCL will verify the
experience, performance, capability & strength of Bidders, independently for executing the
job. GIPCL may visit the site & consult the owner of the industry/property where similar job is
executed by Bidder. GIPCL reserves the right to accept/split/cancel/reject any/all Bids
without assigning any reason thereof. The tenders of qualified Bidder/Bidders shall only be
considered for further evaluation.
6. LANGUAGE OF BID:-
The Bid prepared by the Bidder, and all correspondence and documents relating
to the Bid exchanged by the Bidder and the Company, shall be written in the
English language. Any printed literature furnished by the Bidder, written in another
language shall be accompanied by an English translation for the purpose of
interpretation of the Bid.
7. EARNEST MONEY DEPOSIT (EMD) and TENDER FEE:-
7.1 An EMD of Rs. 274000/- (Rupees Two Lacs Seventy Four Thousand only) and
Non-refundable Tender fee Rs. 2950/- (Rupees Two Thousand Nine Hundred
Fifty only) shall accompany with Bid. Tender fee shall be submitted through
RTGS/NEFT/online payment gateway of company’s website: www.gipcl.com(online
payment form) as per detail provided in Section-F (Annexure-J).:
7.2 The EMD shall be submitted in the form of DD/irrevocable Bank Guarantee in favor
of Gujarat Industries Power Company Limited from any Schedule Public Sector
Bank or Schedule Private Sector Bank as per Performa of BG enclosed with this e-
Bank for EMD DD Payable at :
1. Bank of Baroda Mosali, Dist: Surat
2. State Bank of India Nani Naroli, Branch Code:
3. Any Nationalized banks Surat
Alternatively, The EMD & Tender Fee shall be submitted through RTGS/online mode of
payment by the bidders as per the details given below: -
1) Name of account holder: Gujarat Industries Power Co. Ltd.
2)BANK NAME: State Bank of India
3) BRANCH: Nani-Naroli, Taluka Mangrol, Dist. Surat. Pin code-394110
4) IFSC CODE: SBIN0013423
7.3 In case EMD is paid in the form of BG, the same shall be valid for a period of
days after the due date for submission of the bid.
7.4 The EMD of the successful bidder will be returned after payment of Security Deposit
by successful bidder.
7.5 The earnest money deposit will be refunded to the unsuccessful BIDDER as soon as
the tender is finalized and after award of LOI / Work Order.
7.6 Any bid not accompanied with EMD and Tender fee will be rejected. Tender fees and
EMD should be submitted to GIPCL.
7.7 No interest shall be payable on EMD.
7.8 The EMD will be forfeited if the BIDDER (i) withdraws his tender after acceptance or
(ii) withdraws his tender before the validity date of the tender
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
7.9 SCHEDULE OF EMD & TENDER FEES
Address for Submission:
EMD &Tender fee and other
documents dully signed to be Chief General Manager (Thermal)
submitted in physical form on or GUJARAT INDUSTRIES POWER CO. LTD.,
before due date of closing of the (Surat Lignite Power Plant)
tender Village: Nani Naroli, Taluka: Mangrol, District: Surat.
PIN: 394 112, Gujarat.
Phone : 02629-261063 (10 lines)
8. SUBMISSION OF BIDS
(A) MODE OF SUBMISSION
The bids shall be submitted online at the https://tender.nprocure.com within the
dates specified in the NIT along with the details of tender fees, EMD in two parts as
A. Pre qualification and Techno-commercial Bid without price.
B. Price Bid with reverse auction.
B2 Reverse Auction.
Note: Tender fee and EMD shall be submitted as per NIT.
(a)Pre qualification and Techno-commercial Bid without price:
The tender document duly signed in all pages without price bid along with techno-
commercial deviations, if any, shall accompany the bid. The following Information
shall be provided in the techno commercial bid:
1. Qualification and experience of Site-in-charge.
2. Schedule of deviation (Annexure-F) Technical as well as commercial, if any.
3. Eligibility Criteria (Annexure-R), To be fill and forward as a part of techno
commercial bid along with all required document.
4. Qualification & experience of Supervisors
The following supporting documents shall also be submitted along with EMD &
Tender Fee in physical form:
1. The tender documents dully signed in all pages without price bid along with
techno-commercial deviations, if any.
2. Proof of experience meeting the minimum eligibility criteria as mentioned in
tender document
3. Performance certificate issued by clients.
4. Previous work order copies.
5. Details of present work order (if any)
6. Turn over for the last three years, audited annual accounts/financial
7. statements i.e. profit and loss account and balance sheet duly certified by a
practicing CA will be required.
8. P.F. Number and Allotment Letter.
10. Goods & Service tax registration number/certificate copy-GSTIN.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
11. User ID for e-reverse Auction
12. To participate in e-Reverse Auction, Bidders have to create e-Auction USER
ID on www.auction.nprocure.com and it is mandatory to submit the same
along with physical Techno-commercial Bid; so that the Bidder shall be
allowed to participate in the e-Reverse Auction.
13. Annexure-G & H, Duly filled and stamped undertaking for following:
➢ Declaration Cum Undertaking for Safety Laws and Regulations Compliance
➢ Declaration for Contractual Disputes / Litigations
(B) PRICE BID WITH E-REVERSE AUCTION:-
1 . Percentage Rate Price Bid shall be submitted online only in soft form / online
through https://tender.nprocure.com.
Note: Estimate includes cost of all manpower (at prevailing minimum wage
rate), materials, supervision, equipments, vehicles, consumables, tools &
tackles, transportation, Safety, legal & statutory compliance, mobilization,
Contingency expenditure all taxes & duties (except GST) etc... Bidder shall
quote applicable GST separately in online price bid.
2. Goods & Service tax shall be paid extra (on quoting through price bid) at actual
as per prevailing rates as declared by Central Government on submission of
documentary evidence
3. The rates shall be firm for entire contract period and also during extension, if
required and shall not be subject to any escalation in price, idle charges for
labour, machinery, overhead expenses etc. There will not be any
escalation/compensation to the contractor against any revision in MWR
(Minimum Wage Rates) and revision in painting materials prices.
4. Contractor shall not pay less than the Minimum Wages notified by the
Government from time to time to his/her employees of corresponding
5. Contractor shall at his/her expense comply with all labour and industrial
laws and such other acts and status as may be applicable to this
contract in respect to pay etc. On account of any default in respect of all
liabilities and in case of non compliance of the above, the company can
withhold their payments till all legal liabilities are discharged.
6. Contractor shall deploy labour/workers & supervisors in sufficient numbers and
quality to ensure workmanship of the degree specified in this contract and to
the satisfaction of the Company.
7. Bidder shall have to quote their service charge on estimated cost in the
form of %age. i.e. “At Estimated Value OR %age below the estimated
value OR %age above the estimated value in online Price Bid only.
Bidder shall quote applicable GST separately in online price bid.
8. Online quoted amount by bidder shall include applicable GST. Total amount
8. Online quoted amount by bidder shall include applicable GST. Total amount
will be derived by considering bidder’s online quoted total amount with service
will be derived by considering bidder’s online quoted total amount with service
charge and quoted GST as per prevailing rates as declared by Central/State
Government. Any statutory changes in taxes & duties will be to GIPCL’s
account. In case of any reduction and/or removal of taxes, the same shall be
passed on to GIPCL.
9. The quantities shown in the SoR (Section-E) are approximate for the contract
period and may vary as per job requirement.
10. The Bidder shall fill the Bid documents with utmost care in consonance with the
instructions contained in the Bid documents.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
B2 E-REVERSE AUCTION:-
1. GIPCL reserves the right to opt for e-Reverse Auction for the subject tender at
sole discretion of GIPCL.
2. To participate in e-Reverse Auction, bidders should have registered on
nProcure’s e-Auction Portal:https://e-auction.nprocure.com by selecting
auctioneer as “Gujarat Industries Power Company Limited”.
3. For conducting e-Reverse Auction, lowest 50% out of total eligible Bidders
(rounded to the next higher whole number) or at least 03 (three) nos. of eligible
bidders L1 to L3 (whichever is higher) will be invited.
4. Original L1 price (including GST) will be declared through nProcure’s e-Auction
Portal:https://e-auction.nprocure.com to start e-Reverse auction process and
final received lowest auction price in the value by e-Reverse auction process
will be the final L1 price.
5. Minimum decremental value for the e-Reverse auction will be set by GIPCL
prior to start of e-Reverse auction and this will be applicable during each
reverse bid hit.
6. Duration for the e-Reverse auction will be 60 Minutes with a provision of
extensions for further 15 Minutes at every single reverse bid received during
the last 05 minutes, till there is no further reverse bid entry (hit) by the
participating Bidders.
7. Evaluation of tender will be done on gross total quoted amount with GST.
8. After e-Reverse Auction process, final L1 bidder shall be decided on lowest
offered rate amongst other bidders during specified e-Reverse Auction
9. After e-Reverse Auction process, the original rate quoted by the final L1 bidder
shall be reduced proportionately based on total % reduction from their original
quoted gross price v/s price derived after e-reverse auction, keeping GST
percentage (%) rate same as originally quoted by final L1 bidder.
10. Prorata reduction will be applied in the quoted rates for all the items of SoR
after price discovery through e-Reverse Auction.
B: METHOD OF TENDERING/SIGNATURE ON BIDS
(i) The Bid must contain the postal address like name, residence and place of
business of the person or persons submitting the Bid and must be signed and
sealed by the Bidder’s with his usual signature. The name of all persons
signing the documents shall also be typed or printed below the signature on
(ii) Bid by a joint venture/partnership firm must be furnished with full names of all
partners and be signed with the partnership name, followed by the signature
and designation of one of the authorised partners or other authorised
representative(s). A certified copy of the power of attorney authorizing such
partner or representative shall also be submitted.
(iii) Bids by a Corporation/Company must be signed with the legal name of the
Corporation/Company i.e by the President/Managing Director/Secretary or
other person or persons authorised to Bid on behalf of such
Corporation/Company. A certified copy of the board resolution/power of
attorney authorizing such partner or representative shall also be submitted.
(iv) The Bidder's name stated on the proposal shall be the exact legal name of
(v) Erasures or other changes in the Bid Documents shall be initialed by the
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
person signing the Bid.
(vi) Bids not conforming to the above requirements of signing shall be
9. MODIFICATION AND WITHDRAWAL OF BIDS
a. The Bidder may modify or withdraw the bid prior to the deadline prescribed for
submission of bids.
b. No Bid shall be modified subsequent to the deadline for submission of Bids.
c. No Bid shall be withdrawn in the interval between the deadline for submission
of Bids and the expiration of the period of bid validity.
10.POLICY FOR BIDS UNDER CONSIDERATION
a. Bid shall be deemed to be under consideration immediately after opening of the
bid and till official intimation of award/rejection made by the Company to the
b. While the Bids are under consideration, Bidders and / or their representative or
other interested parties are advised to refrain from contacting by any means, the
Company. The Engineer, if necessary, will obtain clarifications on the Bids by
requesting for such information from any or all the Bidders, in writing as may
be necessary. The Bidder will not be permitted to change the price or
substance of the Bid after the Bid has been opened.
11.EFFECT AND VALIDITY OF THE BID
a. The Bid should be kept valid for acceptance for a period of one hundred and eighty
(180) calendar days from the last date of submission of Bids.
b. The submission of any Bid along with the required documents and specifications
shall constitute an agreement that the Bidder shall have no cause of action or
claim, against the Company for rejection of his Bid. The Company shall always be
at liberty to reject or accept any Bid or Bids at his sole discretion and any action
will not be called into question and the Bidder shall have no claim in that regard
against the GIPCL.
12.OPENING OF BIDS
12.1 The GIPCL will open the pre-qualification/Technical Bid/price Bid, as the
case may be, in presence of Bidder's representatives whenever such a
procedure has been specified. Otherwise the tender will be opened by the
authorized officers of GIPCL.
12.2 Preliminary Examination:
12.2.1 The Company will examine the Bids for any computational errors,
for sureties furnished by bidder, for authentication of documents
submitted and completeness of the Bids.
12.2.2 Arithmetical errors will be rectified on the following basis:
(a) If there is a discrepancy between the unit price and the total price that
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
is obtained by multiplying the unit price and quantity, the unit price shall
prevail and the total price will be corrected & will be binding to the
(b) If there is a discrepancy between the Total Bid Amount and the sum of
total prices, the sum of total prices shall prevail and the Total Bid
Amount will be corrected & will be binding to the bidders.
13.EVALUATION & COMPARISON OF BIDS
13.1 GIPCL shall evaluate the Bids received and accepted by it to ascertain the lowest
evaluated Bid in conformity with the specifications of the tender documents.
13.2 The Technical Bids will be examined for minor matters regarding qualification
of bids. Subsequent to correspondence with the respective bidders, the
decision of Tender Committee will be final.
13.3 All responses to requests for clarifications shall be in writing and shall be
presented to the Company through e-mail or in a sealed envelope on or before
the given date requested by the Company. If the Technical clarifications sought by
the Company do not reach the Company on or before due date, the Bid will be
13.4 The comparison of all the Bids shall be carried out with reference to the scope of
work as per the technical specification. Any deviation/omission shall be evaluated
at highest quoted price of the deviation/omission quoted by any of the Bidder. In
case a separate price (for omission) is not given by any other Bidder, a
reasonable price of the same shall be taken & the same shall be binding to the
13.5 The commercial deviation, if any, shall be loaded to bring all the Bids at par. The
loading shall be carried out at an interest rate of 2% above PLR of SBI.
13.6 A Bid to be substantially responsive shall be one which on evaluation confirms to
all the terms, conditions and specifications of the Bid documents without any
material deviation or reservation.
13.7 For the above referred purpose, a material deviation shall be one which:
(a) Which affects in any substantial way the scope, quality or performance
of the contract, or
(b) Which limits in any substantial way and in a manner inconsistent with
the Bid documents, GIPCL‟s right or the Bidder‟s obligations, under the
contract, or Whose rectification would affect unfairly the competitive
position of other Bidders presenting substantially responsive Bids.
14. RIGHT OF REJECTION OF TENDERS
14.1 GIPCL reserves the right to accept or reject any Bid or to cancel the Bidding
process and reject all Bids at any time prior to award of contract, without
thereby incurring any liability to the affected Bidder or Bidders or any obligation to
inform the affected Bidder or Bidders regarding the same.
14.2 Any Tender without EMD and Tender fee will be treated as non responsive and
shall be rejected at the outset & no further correspondence shall be
entertained regarding this.
14.3 GIPCL reserves the right to debar any Bidder from participation in future Bids
if such Bidder has quoted an abnormally low rate in the Bid document/price
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
15. AWARD OF CONTRACT
15.1 GIPCL will award the contract to that bidder whose quotation has been
determined to be substantially responsive and evaluated as the lowest quotation(
After E-reverse auction) in conformity with the requirements of the specifications
and documents contained herein, provided further that the bidder is
determined and evaluated to be qualified to perform the contract satisfactorily.
15.2 The successful bidder shall be intimated of his selection through the Letter of
Intent or Letter of Award/ Work Order which shall be sent to him through e- mail,
courier, fax or registered mail.
15.3 GIPCL reserves the right to cancel/short close the contract during the contract
period without assigning any reason.
16. CONTRACT PERIOD
16.1 The contract will be for a period of 02 years (24 months) from the date of actual
commencement of operation of the contract as stated in the Work Order
(“Contract Period‟).
16.2 GIPCL reserves the right to extend the Contract Period up to 03 months on the
same rates and terms and conditions without any price escalation and entering into
any new contract
16.3 The said Contract Period can be extended if mutually agreed upon by both the
parties up to One year (12 Months) and in such a case a revised work order shall
be issued at the same rates and terms & condition or at negotiated rates
acceptable by both parties i.e. the Company & the Contractor.
16.4 The basic considerations and the essence of the ‘contract’ shall be the strict
adherence to the time schedule for performing the specified ‘works’. Contractor has
to mobilize required number of manpower along with necessary tools, tackles,
16.5 GIPCL reserve the right to short close the contract any time by giving one month
notice period without assigning any reason.
17. ASSIGNMENT AND SUB-LETTING
The Contractor shall not directly or indirectly assign or sub-let total/any part of the
contract to any other party or agency.
18. CONTRACTOR’S OBLIGATIONS
A: DEPLOYMENT & RESPONSIBILITY OF MANPOWER
(i) The Contractor shall deploy suitably qualified and sufficient manpower for
timely & satisfactorily execution of the works under the contract.
(ii) The Contractor shall deploy sufficient skilled to properly complete the job in
(iii) The Contractor shall depute its own workmen/labor with proper identification
to enter the plant premises after ensuring that the jobs are scheduled.
(iv) At the time of deploying manpower, the Contractor shall strictly comply all the
applicable labor laws/Acts norms including but not restricted to the age of the
workers, women workers and shall also ensure that a police verification and
security check for all the workmen/labor engaged at the GIPCL site is done
and necessary documents regarding the same shall be submitted to the
GIPCL‟s authorized representative/officer-in-charge. Any default in complying
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
with the same or any misrepresentation regarding compliance of the same
shall compel GIPCL to initiate appropriate civil or criminal proceedings
regarding the same.
(v) The Contractor shall also comply with the safety requirements and provide his
workmen/labor with safety equipment like helmets, masks, gum boots, three
pair of stitched uniform every year and other necessary PPEs for properly
undertaking the operations involved under this contract. Following are also to
a) Safety shoes (standard approved ISI make)
b) Safety helmet (standard approved ISI make in yellow colour only)
c) Safety Goggles / face shield.
d) Ear plug / Ear muff.
e) Hand gloves like electrical hand gloves / cotton hand gloves / Chemical hand
f) Full body double harness Safety belt.
Note for safety helmet: Following brands safety helmet shall be provided by
contractor to his workmen.
SAFETY HELMET: -
Sr. No. Model Company Specifications
01 Tough Hat, HP-TH Sure Safety
03 PN 521 - Shelmet Karam
SAFETY SHOES: -
Sr. No. Name of Manufacturer Mode
01 Acme Fabrik Plast Co. SSTEELE (Strom) – Double Density
02 TRIMAX(Adjacent) – Double Density
03 Waves Waves Nile D/D
04 Favourite Safety Products FSP Nile DD
(vi) Contractor shall nominate /authorize senior experienced person in writing as
site in charge to co-ordinate with GIPCL engineer and who shall bear overall
responsibility for performance of the contract. Such person shall remain
always available at site or site office allotted to the contractor at SLPP site.
Contractor has to submit the authority letter and documentary proof for the
(vii) The Contractor shall appoint a supervisor who shall co-ordinate with GIPCL‟s
Engineer In - Charge for daily entrusted job. They have to maintain daily
records dully signed for the works carried out and duly certified by Engineer-
In-Charge. The Contractor in co-ordination with the Engineer-In-Charge shall
ensure the availability of adequate manpower to carry out the job satisfactorily
on a daily basis. As per the instruction of Engineer-In-Charge they have to
allot the work and execute the same in specified time limit.
(viii) During emergency or similar situations the Contractor shall be required to
mobilize resources as per need within the period of 04 hours as directed by
GIPCL. If the contractor fails to mobilize sufficient manpower to complete the
job in time, GIPCL will execute the job through other agency at the risk and
cost of the contractor with 15% supervision charges& the same will be
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
recovered from the Contractor‟s bill.
(ix) Important Note: Whenever any of the Unit at SLPP remains under outage
due to any reason, the contractor shall mobilize sufficient work force at
site within a period of four hours from the time of intimation to the site-
in-charge or via mail to your office. Generation loss occurred due to
want of manpower as well as resources will be viewed very seriously
and will invite appropriate punitive measures as decided by competent
(x) Contractor should mobilize sufficient number of manpower and execute the
working all shifts of 08 hours with sufficient manpower. Contractor should not
continue the any manpower for more than 12 hours (08 hous+04 hours OT).
B: TOOLS & TACKLES:-
All tools and tackles required to execute the contract are in the scope of the
contractor. The contractor should ensure that tools and tackles are in healthy &
working condition. All consumable items would be in the scope of the contractor.
19. Clarification of Bidding Documents
If any Bidder requires any further information or clarification in the Bidding
Documents, may notify the Company before one week of last date of submission of
online Bid, in writing or by E-mail at the GIPCL's mailing address
[email protected] indicated in the 'Invitation to Bids'. The GIPCL's response
(including an explanation of the query) will be sent in writing or by E-mail to all
prospective Bidders who have received the Bidding Documents.
20. TIME SCHEDULE
The basic considerations and the essence of the 'Contract' shall be the strict
adherence to the time schedule for performing the specified 'Works'.
21. UNDERSTANDING AND CLARIFICATION ON DOCUMENTS AND
The Bidder is required to carefully examine the specifications and documents, all
the conditions and matters work wise & cost wise. If any Bidder finds any
discrepancies or omissions in the specifications and documents or is in doubt for
any meaning of any part, he shall request in writing for an interpretation/
clarification to the GIPCL or during Pre-Bid meeting. All such interpretations and
clarifications shall form a part of the Bid documents.
All the payments against the work order shall be in Indian currency and payable
through RTGS (online payment) system only based on submission of required
documents like bank mandate form with original cancelled cheque.
23. POINTS TO BE CONSIDERED DURING QUOTING ONLINE PRICE BID
(a) The schedule of rates shall be read in conjunction with Instructions to Bidders,
General conditions of contract, Special conditions of contract and Technical
specifications.
(b) The quantities given in the schedule of rates are estimated and will be made
as per actual work carried out as per the rates of work order.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
(c) The method of measurement of completed work for payment shall be in
accordance with the method of measurement specified in the price bid.
(d) No separate amount shall be payable for use of auxiliary equipment incidental
to or in day to day operation in the course of fulfillment of contractual obligation
Note: Interested bidders are requested to submit the online tender at least two
days in advance from the due date set for on line submission of bid in order to
avoid non participation of e-tender due to probable technical problem in e-tender
The quantities specified are estimated and for tendering purpose only. Payment
will be made, based on actual work done as certified by Engineer-in-charge of
Quantities of individual items may be revised during the course of contract period
based on site requirement. Contractor shall not be entitled for any compensation
on ground of such alteration in scope of work. GIPCL reserves the right to operate
or increase/decrease quantities in each item or omit any item included in
Schedule of Quantity at his discretion. Contractor shall have no claim,
whatsoever, on grounds of loss of anticipated profit etc. on account of the same.
After commencement of the work, GIPCL, for any reason may not require to be
carried out the whole/part of the work as specified in the tender, the ENGINEER-
in-charge shall inform the fact for thereof to the CONTRACTOR and contractor
shall have no claim for any payment or compensation whatsoever on account of
any profit or advantage which he might have derived from the execution of the
work in full but which he did not derive in consequence of the full amount of the
work not having been carried out nor shall he have any claim for compensation by
reason of any change having been made in the original specifications and
instructions which shall involve any curtailment of the work as originally
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
INSTRUCTIONS TO BIDDERS FOR ONLINE TENDERING
Sr. No Description
Tender documents are available only in electronic format and same can be
01 downloaded from the website https://tender.nprocure.com and It can also be
viewed from Company’s website https://www.gipcl.com.
Price bid should be submitted online through the website
02 https://tender.nprocure.com only. No physical submission of price bid will be
entertained as it should be furnished on-line only.
Bidders who wish to participate in online tenders will have to procure / should
have legally valid Digital Certificate (Class III) as per Information Technology
Act-2000, using which they can sign their electronic bids. Bidders can procure
03 the same from any of the license certifying Authority of India or can contact
(n)code solutions- a division of GNFC Limited, who are licensed Certifying
Authority by Government of India
All bids should be digitally signed. The bidders are required to contact at the
below mentioned address for detailed training on on-line tendering and also for
04 (n)Code Solutions (A Division of GNFC Ltd.)
304, GNFC Infotower, Nr. Hotel Grand Bhagwati,
S G Highway, Bodakdev,
Gujarat, India.
E-mail: [email protected], [email protected],
website: https://tender.nprocure.com
Interested bidders are requested to submit the online tender at least two days in advance
from the due date set for on line submission of bid in order to avoid non-participation.
REVERSE AUCTION:
1. To participate in e-Reverse Auction, Bidders have to create e-Auction USER ID on
https://e-auction.nprocure.com that the bidder shall be allowed to participate the e-
Reverse Auction
2. E-Reverse Auction will be carried out through new e-Reverse Auction portal of (n)
Code Solution: https://e-auction.nprocure.com.
3. E-Reverse auction shall be conducted amongst (a) the lowest 50% eligible bidders
(rounded to the next higher whole number) from the total bids received OR (b)
Minimum three (03) lowest bidders, whichever is higher, shall be invited for
participation in e-Reverse Auction through E-reverse auction platform.
4. As per the tender conditions, L1 value will be declared to start e-Reverse Auction
and final reduction in this value by e-Reverse Auction process will be the final L1
5. Decrement value considered for reverse auction will be 0.50 % of quoted value of L1
bidder with GST OR 1Lakh whichever is lower.
6. Duration for the e-Reverse Auction shall be 60 Minutes with extension of 15 Minutes
at every single reverse bid received during the last 5 Minutes, till there is no further
reverse bid entry by the participating Bidders.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
7. After e-Reverse Auction process, L1 bidder shall be decided on lowest rate quoted
during e-Reverse Auction
8. Post e-Reverse auction, Reduction in prices will be distributed proportionately on
9. In case of any further information regarding online bidding or if a Bidder needs any
assistance in accessing / submission of online bid/ clarification or if training is
required for participating in online e-reverse bidding, then the Bidder can contact the
following office for assistance or training:
(n)Code Solutions (A Division of GNFC Ltd.)
304, GNFC Infotower, Nr. Hotel Grand Bhagwati,
S G Highway, Bodakdev,
Gujarat, India.
E-mail: [email protected], [email protected],
website: https://tender.nprocure.com
Bidder may visit https://tender.nprocure.com/faqs for information regarding e tendering
registration process.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
GENERAL CONDITIONS OF CONTRACT
1. CONTRACT SECURITY DEPOSIT/ PERFORMANCE BANK GUARANTEE
As a Contract Security, the successful Bidder, to whom the work is awarded, shall
be required to furnish a Performance Bank Guarantee (PBG)/Contract security
deposit in favor of Gujarat Industries Power Company Limited for guarantee
amount at 10% of the “Annual Contract Price” excluding GST from all
Nationalized Banks or Axis Bank, ICICI Bank, HDFC Bank, Kotak Mahindra Bank,
IndusInd Bank, RBL Bank, DCB Bank, Federal Bank, Bandhan Bank and
Standard Chartered Bank in the format attached in SECTION-F(ANNEXURE-B),
and it shall guarantee the faithful performance of the 'Contract' in accordance
with the terms and conditions specified in these documents and specifications.
Contract security deposit shall be submitted strictly within twenty one days from
the date of LoI or work order, whichever is earlier.The guarantee shall be valid up
to retention period of three months from the contract completion date. The
Guarantee amount shall be payable to the Company in Bidder's home currency
without any condition whatsoever.
GIPCL reserves the right to forfeit Performance Bank Guarantee (PBG)/Contract
security deposit.
The Performance Bank Guarantee (initial security deposit) & retention money
(Cash Security deposit) will be returned to the Vendor/Contractor without any
interest at the end of the „Retention Period' after completion of contract and on
fulfilling contractual obligations throughout the retention period. However, any
delay in submission of initial SD will result in equivalent late release of entire SD
after guarantee period.
Bid security/EMD should be refunded to the successful bidder on receipt of
Performance Security.
2. PENALTY, RECOVERY & INCENTIVE CLAUSE
2.1 RECOVERY CLAUSE
• In case of any damage of equipment/machinery due to negligence of contractor or
any other reasons attributed to contractor the decision of Engineer-in-charge
regarding the amount of recovery shall be final and binding subject to a maximum
of 10% of contract value. Recovery will be affected from the monthly bills and/or
retention money/security deposit.
• If the contractor fails to execute the work as per directions of Engineer (I/c) within
the time frame given in work order and as per day to day instructions by Engineer-
in-charge, GIPCL shall get the work done by third party at the risk & cost of the
contractor with 10% additional overhead charges of GIPCL, plus applicable GST
as per extant GST laws & other taxes & duties as per applicable extant laws.
2.2 RPENALTY CLAUSE
Following penalty clause will be applicable.
Stone received at bunker grills of all
1 four units Measured on monthly basis Rs.1000/MT
Stone received after bunker grill of all
2 four units Rs.2500/incidence
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
3 Deployment of less Man-power than Additional 20% of item rate on pro rate
. required basis
4 Total penalty due to above all clauses Maximum 10 % of the total contract
. shall be value in annual bases.
Deployment of less Man-power than Pro-rata Deduction
required (Recovery) from item rate
2.3 INCENTIVE FOR REMOVING STONE
Incentive shall be given for stone removed from the system on monthly basis.
The quantum of stone removed shall be measured in metric ton and is done by
our civil department and their measured quantity is final for incentive. Previous
month stone quantity is considered for Incentive for removing stone in RA Bill
process. The Incentive shall be,
1) Up to 300MT NIL
4) Above 400 MT Rs.200/MT
3. DEDUCTIONS FROM CONTRACT PRICE
All costs, charges or expenses that GIPCL may have paid, for which, under the
contract the contractor is liable, shall be recovered by the GIPCL. The contractor
shall pay all such claims within 15 days of claim failing which the same shall be
deducted from the bills of contractor.
4. TERMINATION OF CONTRACT BY GIPCL
Contractor shall be responsible to complete the jobs within agreed time schedule
and in case contractor fail to complete the job, GIPCL shall recover from his bill,
Security Deposit and / or whatsoever for expenses incurred to complete the job
with additional 15% overhead charges.
In case if contractor‟s services are not found satisfactory with respect to
mobilization, time bound completion of work, workmanship & safety (OHSAS
policy of GIPCL) then GIPCL has right to terminate the contract at any time by
giving him 15 days advance notice without assigning any reason and will make
the alternate arrangement at the risk & cost of contractor.
GIPCL may terminate the contract after due recoveries of pending jobs/damages
after giving 15 days advance notice to the contractor if any of the following events
i. Contractor is adjudged as insolvent.
ii. Contractor has abandoned the contract.
iii. Contractor fails to proceed with the work with due diligence as per
requirements of the contract.
iv. Contractor has neglected or failed persistently to observe or perform any of
the acts, matters or things, which as per the contract are to be observed and
performed by the contractor.
v. Contractor repetitively violating the safety norms for more than three incidents.
vi. Any major contradiction of applicable labour laws.
vii. Any major deviations from contractual terms and conditions including quality of
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
FAILURE & TERMINATION
IfVthe CONTRACTOR after receipt of written notice from the GIPCL/ENGINEER
requiring compliance, with such further drawings and / or the GIPCL
/ENGINEER instructions fails within seven days to comply with the
same, the GIPCL/ENGINEER may employ and pay other agencies to
execute any such work whatsoever as may be necessary to give effect
thereto and all costs incurred in connection therewith shall be recoverable from
the CONTRACTOR by the GIPCL on a certificate by the GIPCL/ENGINEER
as a debt or may be deducted by him from any money due or to become due
to the CONTRACTOR.
If the contractor fails to execute the work or fails to mobilize the resources
and equipments as per directions of GIPCL / ENGINEER within the time frame
given and/or violating the GIPCL‟s safety rules & regulations, ENGINEER/
GIPCL shall get the work done by third party at the risk & cost of the
CONTRACTOR with additional 15% overhead charges of GIPCL and all costs
incurred in connection therewith shall be recoverable from the
CONTRACTOR by the GIPCL/ENGINEER as a debt or may be deducted
by him from any money due or to become due to the CONTRACTOR
In case if contractor‟s services are not found satisfactory with respect to
mobilization, time bound material evacuation, workmanship & safety (OHSAS
policy of GIPCL) then GIPCL has rights to terminate the contract at any time
by giving you 15 days advance notice without assigning any reason and will
make the alternate arrangement at cost and risk of the Contractor.
SETTLEMENT OF DISPUTES
a Any disputes or difference of opinion between parties arising out of the contract
. to the extent possible shall be settled amicably between the parties. If
amicable settlement cannot be reached all the disputed issues shall be
resolved through arbitration before a Sole Arbitrator appointed by Managing
Director, GIPCL according to the provisions of The Arbitration & Conciliation
Act, 1996. The place of arbitration shall be at Surat/Vadodara or any other
place within state of Gujarat as may be mutually agreed by the parties in
consultation with the tribunal.
b In appointment of the Sole Arbitrator, if the dispute claim is up to a sum of Rs.
. 25/- Lac, a person having a position equivalent to a Retired District Judge
shall be appointed; for the claim higher than Rs. 25/- Lac and up to Rs.
100/- Lac, the same shall be referred to a Retired High Court Judge and for a
claim exceeding Rs. 100/- Lac, the same shall be referred to a Retired Supreme
c Work under the contract shall be continued by the contractor during
. arbitration proceedings unless GIPCL shall order suspension thereof or any
part thereof in writing or unless the matter in such work cannot possibly be
continued unless the decision of the Arbitration proceedings is obtained.
INTERPRETATION OF CLAUSE
In case of disputes as regards interpretation of any of the clauses or
specification, the decision of C h i e f General Manager (THERMAL) - GIPCL
will be final and binding on the contractor.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
EMPLOYEE’S COMPENSATION INSURANCE
Contractor shall take all risk Insurance Policy to cover all his
workmen/employees, staff applicable under the Employee Compensation Act
or any amendment thereof as also insurance cover for third party liability. The
contractor shall keep the GIPCL indemnified from all liabilities arising out of his
action in pursuance of this contract. The E. C. Policy should be obtained from
Surat Jurisdiction and shall be assigned to GIPCL. EC policy should cover the
specified contract period.
Contractor shall also obtain additional off-duty coverage insurance policy for all his
workers as per clause no. 35 herein under.
9. STATUTORY REQUIREMENTS
A. COMPLIANCE OF LABOUR LAWS
The contractor shall at his own cost comply with the provision of labor laws, rules, orders
and notifications whether central or state or local as applicable to him or to this contract
from time to time. These Acts/Rules include without limitation of the followings.
1. Contractor shall be solely responsible and shall fully comply with all the provisions of
all the labor laws applicable such as the Minimum Wages Act, 1948, Contract Labor
(Regulation & Abolition) Act 1970, Factories Act, 1948, Payment of Bonus Act
Employees Provident Fund and Miscellaneous Provision Act 1952, Industrial Dispute
Act 1947, Workmen Compensation Act 1923, Payment of Gratuity 1972, Interstate
Migrant Workmen Act 1979, Equal Remuneration Act with Rules, Order and
Notifications issued/made there under from time to time.
2. All other Acts, Rules/Bye-Laws, Orders, Notifications etc. present of future
applicable to the contractor from time to time for performing the contract job.
2.1 The Contractor shall provide and be responsible for payment of Wages, Salaries,
Bonus, Social charges, Insurance, Food, Accommodation, Transport, Medical and
Canteen facilities and other statutory privileges and facilities to his personnel as per
law/rules/regulations and orders of the Central Government, State Government,
Local Authorities or other authorities as are in force from time to time. All
employees of the Contractor shall be employee of the Contractor.
2.2 The contractor shall have a valid license obtained from Licensing Authority under
the Contract Labor (Regulation & Abolition) Act-1970 at the time of execution of the
contract covering all his employees working at SLPP site and furnish the same
failing which GIPCL may terminate the contract at its sole discretion.
2.3 The Contractor shall at the time of execution of the contract have a EPF Code
Number obtained from the Authorities concerned under the Employees Provident &
Miscellaneous Provisions Act, 1972 and remit contributions in respect of the
employees employed by him at SLPP Site to the P.F office concerned every month
failing which GIPCL will recover from the outstanding payment to the contractor
from GIPCL.PF code of Gujarat region should be taken.
2.4 The Contractor shall maintain all records/registers required to be maintained by him
under various labor laws mentioned above and produce the same before the
Statutory Authorities whenever required.
2.5 The Contractor shall also submit periodical reports / returns to the various statutory
authorities such as the Contract Labour (Regulation & Abolition) Act-1970,
Employees Provident Fund Act etc. Under intimation to HR&Admn.Dept.
2.6 The Contractor shall not pay less than the Minimum Wages notified by the
Government from time to time to his employees of corresponding categories.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
2.7 The Contractor shall be responsible for payment of overtime wages to his workmen,
if any, in case they are required to work beyond the prescribed hours under law as
per applicable rates.
2.8 The contractor shall take Workmen Compensation Insurance Policy for all his
employees working at SLPP. The contractor shall indemnify the company against
any liability due to any work injury or accident to any of its employees.
2.9 The Contractor shall in the event any of his workmen / employee sustains any injury
or disablement due to an accident arising out of and in the course of his
employment, provide necessary medical treatment and pay compensation as
applicable, required under the Workmen’s Compensation Act,
2.10If any of the persons engaged by the Contractor misbehave with any of the officials
or the Company or commit any misconduct with regard to the property of the
Company or suffer from any serious communicable disease, the Contractor shall
replace them immediately.
2.11The Contractor shall not engage / employ persons below the age of 18 years.
Employment of women shall be strictly according to applicable laws.
2.12GIPCL will have right to deduct and disburse the claims of the individual / parties
being a principal employer on any account whatsoever in relation to their
employment with the contractor. The Security deposit will be released to the
contractor at the end of the contractual tenure subject to an undertaking by the
contractor that in the event any of his workmen or the heirs of workmen puts up a
claim for recovery of money due to him from the contractor before the appropriate
authority under the I.D.Act 1947 or under any other labor laws or for compensation
under the Workmen’s Compensation Act, 1923 and the appropriate authority has
given a direction for making payment the contractor will meet the same or indemnify
GIPCL if in the event GIPCL pays it as Principal Employer.
2.13The contractor shall make payment of wages to his employees on fixed date within
the period specified under the applicable Law, in presence of representative of the
company. He will submit a true copy of wage sheet, attendance register and P.F.
remitted challans on monthly basis to HR&A dept. for verification and record.
2.14The Contractor shall provide Safety items / kits to his employees such as safety
shoes, goggles, ear plugs, hand gloves, safety belts etc., if any, required under the
2.15The contractor shall conduct pre-induction and periodic medical checkup of his
workmen as per applicable laws.
2.16.The contractor shall be solely responsible for any accident caused to his workers
and should adhere to all rules / regulations as per labour laws of Government and
other statutory laws as applicable.
2.17The contractor should register himself under the Contract Labour Act, Employee
Compensation Act and PF Act (Code no. to be mentioned) and submit the copy of
registration certificate and should possess the same from the date of
commencement of work, failing which the contract is liable to be cancelled. The
E.C. Policy copy should be submitted to the GIPCL before commencement of the
work and Labour License should be obtained within one week from the date of issue
of Form-V. Contractor should apply for Form-V immediately after receipt of LOI. A
copy of Labour License shall be submitted to GIPCL, HR&A department.
2.18Contractor shall have to insure his workmen / supervisors etc. under Group
Insurance scheme.
2.19The Contractor shall be responsible for compliance of all statutory rules, regulation,
act enforced from time framed by the government such as Factory Act, Employee
Compensation Act, payment of 'Wages Act', Minimum Wages Act', Provident Fund
Act, All Labour Laws Act in respect of employees engaged by him for the work and
shall have to maintain necessary records. In case any amount becomes due to be
payable by him to his employees or to the Government under the above rules,
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
regulation, Acts, GIPCL reserves the right to recover the same from the running bill
of the contract.
2.20Documentary evidence of deposit of PF paid shall have to be produced by the
contractor along with the next bill.
2.21Records as per the provisions of various statutory Acts will have to be maintained
by the contractor and submitted as and when required.
2.22All employees of contractor should maintain due discipline and respect local
sentiments. GIPCL reserves the right to direct the contractor to remove any such
person who does not comply with it.
2.23The list is indicative in nature and not an exhaustive one. Any amendment/
alteration/notifications or addition to the existing law or a new statute shall
automatically and immediately become applicable.
2.24Annual Health Check Up: As per statutory requirement, Contractor has to inform
workmen deployed at site for annual health check up as per schedule prepared by
HR&A department.
B.LEGAL ASPECTS
1. Contractor shall maintain all register required under the Labour Laws and make the
payment as per the Minimum Wages Act to the workers employed by him.
2. Contractor shall obtain requisite license to carry out this contract under the provisions of
Contract Labour Act, 1970 and maintain necessary records and registers under the said
3. Contractor shall submit a copy of each of the registration certificates with respect to
Employees Provident Fund and Employee Compensation Act within one week time, from
the date of award of this contract.
4. Contractor’s employees, agent or sub-agent shall not smoke or light anything within the
premises of the GIPCL and carry match box / lighter or any other explosive and /or
inflammable material inside the plant.
5. Contractor shall abide by all the statutory rules and regulations like P.F, Labour Laws
6. Contractor shall issue an appointment order to each casual labourer stating therein the
nature of job to be performed by him and fix time for which the concerned labourers are
likely to be deployed. Contractor shall also issue a temporary identity card specifying the
period for which the laboure has been deployed.
7. Contractor is fully liable for the persons engaged by him for above work; however,
GIPCL reserves the right to deduct any amount legally justified towards any liability not
8. Contractor shall indemnify GIPCL from any liabilities arising out of the employment of the
9. If the contractor fails to complete the allocated job within specified time frame, GIPCL
shall get the work done by third party at the risk and cost of contractor.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
10. PAYMENT OF WAGES
Contractor shall be responsible for compliance of all statutory rules, regulation, act
enforced from time framed by the government such as Factory Act, Employee
Compensation Act, payment of „Wages Act‟, Minimum Wages Act‟, Provident
Fund Act, Payment of Bonus Act, Labor Law Act, maternity benefit act in respect of
employees engaged by him for the work and shall have to maintain necessary
records. In case any amount becomes due to be payable by him to his employees or
to the Government under the above rules, regulation, Acts.
11. ACCIDENT TO WORKMEN
Contractor shall be fully responsible for injury or death of any of your or third party
workmen due to any act omission / indiscretion on your part while undertaking the
work and contractor shall fully abide by the statutory requirements of the
employee's compensation act. GIPCL shall not be liable for any compensation
due to accident, death or injury to any of contractor‟s workmen or any third party
due to negligence, act or omission on your part.
General area lighting will be provided by GIPCL. However work area specific lighting
should be arranged by contractor
13. NIGHT/SUNDAY/HOLIDAY SHIFT
The contractor shall depute qualified and adequate resources in night
shift/Sunday/holidays for any emergency job, which may come up at
night/Sunday/holiday.
14. SAFETY ASPECT
Contractor shall observe all the safety and security rules and regulation of the
GIPCL which are at present in force and which may come into force during the
pendency of the contract. Any violation of any rules and regulations will entail
immediate termination of the contract.
When contractor moves his lifting tools and tackles to the plant area, required test
certificates as per the Factory Act 1948 and the state factories rules has to be
submitted to safety Deptt. Safety Deptt. will check the certificates and if found
okay, then only materials will be allowed to enter inside the plant. Material inward
gate pass will be made only after certification from Safety Deptt. Security Deptt. will
inform to Safety Deptt., as & when such tools and tackles brought at the gate for
making entry in the maintenance site.
The contractor has to submit the list of required safety gears along with safety
equipments available with him to safety Deptt. Safety Deptt will check for quantity
and quality of the safety gears and then allowed permission of work. Poor quality
material will not be allowed to take inside the Plant. If quantity of required safety
equipments is not satisfactory, contractor will not be allowed to carry out the work
using such safety gears inside the Plant for the work.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
15. GENERAL SAFETY CLAUSES:
1. The Contractor shall observe and comply, with regard to his workmen working at the
SLPP site, the safety norms as per the safety operating standards.
2. The Contractor shall ensure that his workmen are informed and trained regarding the
safety standards to be adopted while operating within the SLPP Plant & Mines
premises and the Contractor shall brief them regarding the same and use of the
Personal Protective Equipment (‘PPE’).
3. The Contractor shall issue safety shoes and safety helmet of IS standard to all his
workmen immediately on execution of the work and the contractor shall ensure that his
workmen wears the protective equipments at all times during the work operation.
Following brand of the safety shoes and helmet shall be issued to contract workmen.
Contractor shall issue safety shoes every year.
Sr Model Company Specifications
01. Tough Hat, HP-TH Sure Safety IS : 2925 – 1984, ANSI / ISEA Z89.1-2009
03. PN 521 –Shelmet Karam
Sr Model Company Specifications
SSTEELE (Strom) – Double Density
01. Acme Fabrikplast Co.
TRIMAX(Adjacent) – Double Density
02. Acme Fabrikplast Co.
03. Worktoes Warren Worktoes - Warren Plus
4. Other safety gears like ear plug, dust mask, hand gloves, safety goggles, gum boots, full
body safety uniform and belts, safety net etc. shall be issued and used as per the job
requirements. Safety helmet shall be of YELLOW COLOUR ONLY. Contractor will procure
safety shoes & safety helmet from a reputed company with at least 12 months‟ guarantee
and shall produce the guarantee certificate and IS standard certificate to the safety
department. Contractor should purchase safety shoes of reputed brands. Safety shoes
will be issued every year. IS certificate and guarantee certificate must be obtained from
the vendor and submitted to the Safety department. Safety shoes should be heat, water,
oil and chemical resistant, having an anti-slippery sole of 15298- 2002 make.
5. It is the duty of contractor to ensure that his workmen are wearing required PPEs as per
work requirement. Contractor should ensure that their workers are wearing Safety helmet,
safety shoes, dust mask, goggles, ear plug etc. at all times when they are at work
throughout the contract period. The contractor has to maintain the PPE issue register with
signature of workmen.
6. Contractor will reissue these PPEs in case of damage or misplacement of the same.
Replacement shall be made immediately.
7. The contractor shall be responsible for providing first aid or emergency medical help and
treatment to his workmen in the event of any accident or injury.
8. If it is observed that contractor is not issuing required PPEs timely and that of required
quality, GIPCL will issue the required PPEs to contract workers and back charge the same
with 25% overhead charges of GIPCL.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
9. All lifting tools and tackles shall be duly certified by competent person in conformity with
the statutory requirements and certificate in form no. 10 as per rule 60 of Gujarat
Factories Rules, 1963 and section 29 of the Factories Act, 1948 shall be submitted every
year before using such tools and tackles. In case of purchase of new lifting tools and
tackles, form no. 10 as per the said rules shall be submitted before they are taken into
use. All lifting tools and tackles shall be of reputed make having International
manufacturing standard and shall be maintained in proper and workable condition. All
lifting tools & tackles and equipment shall be tested as per statutory requirements and
valid test certificates are available. Winches, hoists and cranes shall be operated by
experienced persons only
10. The Contractor shall nominate one Safety Officer for supervising the daily job/ shutdown
jobs for observing and maintaining the safety aspects at site. He is solely responsible for
any safety measures during work. He has to ensure that all the workmen working at site
are equipped with essential PPE‟s and proper safety arrangement is made at the SLPP
11. After mobilization of any tools & tackles to site, which includes chain pulley blocks, D-
shackles, wire ropes, winch machines, Mobile crane, Hydra etc. shall be offered for
inspection with all above statutory test certificate before using at site for any work. They
should use all tools and tackles only after certification by GIPCL representative/safety
12. When working at height, working on ceiling or roof covered with fragile materials, full body
harness safety belt, ladders and crawling boards shall be used to prevent accident.
Further, during working on height, contractor should arrange proper scaffolding of still
pipes, safety net, full body safety belt, fall arrestor system etc. Advice and instructions of
engineer in charge/ safety in charge shall be strictly complied with in this regard. All
necessary safety precautions shall be taken by the contractor to prevent accident and
personnel injuries while working on height.
13. Flash back arrestors made of reputed manufacturer shall be provided on cutting torch, on
DA cylinders and on O2 cylinder. Cylinder caps also required for handling the cylinders at
the work at height area. Gas cylinders shall be transferred through gas cylinder trolley
only with cylinder cap and stored up right (vertical) position only. All gas cylinders shall be
hydro tested / certified as per gas cylinder rules 2004. Gas cylinders shall be stored,
handled as per gas cylinder rules
14. All vehicles shall be operated by licensed drivers only. All vehicles‟ PUC to be tested as
per Government approved RTO guidelines. All Vehicles must be parked in Parking space
designated by GIPCL. If any vehicle is found inside the plant premises other than the
parking area such vehicles shall be handed over to Security dept. and their entry shall be
cancelled for movement inside the plant premises with immediate effect.
15. All electrical equipment shall be in good condition and free from any defect. Electrical
tools & equipments i.e. welding machine, grinding and drill machine etc. may be checked
by the electrical engineer of the contractors regularly, every six month at least and report
to be submitted to concerned HOD and safety depts.
16. During hot work, contractor will use fire curtains like asbestos sheets or fire blankets to
prevent falling and spreading of sparks and hot material on and around the work area.
Contractor will procure and use such items. ELCB / RCCB shall be provided with rating of
9-30 milli ampere on welding machine and all portable power tools.
17. 24V AC lighting to be used for portable lighting / hand lamp.
18. Extension boards shall be standard industrial boards with male / female sockets.
19. All cables, wires shall be in good conditions and without joints and cut marks and shall be
terminated with plugs and applicable insert pins.
20. Electrical related work shall be carried out through qualified & experienced electrician only
21. During hot work, contractor will use fire curtains like asbestos sheets or fire blankets to
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
prevent falling and spreading of sparks and hot material on and around the work area.
Contractor will procure and use such items
22. The contractor shall fill – up Incident notification form (S-I), Incident Investigation form (S-
II) and near miss report within time limit as specified in forms, if any accident, Incident,
near miss occurred while working at SLPP site.
23. Major AMC / ARC contractor (Where the man power strength is more than 50 and
above) should appoint / nominate one qualified safety officer and he shall be
responsible for addressing all the safety related aspects of execution of contract jobs
and he will in close co ordination with safety officer of SLPP and attend all safety
related meeting such as safety committee, on job safety training etc. Where the
contractual man power is less than 50, the site in-charge of the contractor will act as a
safety officer and he will perform all the duties of safety officer as mentioned above.
19. No loose connection / joints allowed in electrical cables during performance of any kind of
20. Safety shoes to be issued to female employees also.
21. All the vehicles shall be fit as per RTO guidelines and valid fitness certificate is
required as per RTO guidelines.
22. The Contractor‟s nominated safety officer shall be imparted regular on-job safety
training like tool-box talk etc. and submit a record of such training in safety dept,
respective dept and HR&A dept.
23. Qualified and experienced safety supervisor and electricians, as applicable, shall be
available round the clock.
24. The Contractor shall comply all the new requirements related with safety as informed
by the HOD / Safety department from time to time.
25. Electrical Safety:
➢ All the electrical apparatus including welding machine (either 3-phase or single
phase) should be provided with Earth Leakage Circuit Breaker (ELCB/RCCB/RCBO)
of 30mA rating.
➢ Bidder should ensure periodic checking of ELCB provided in their electrical
➢ Bidder should ensure that there should not be any joint in the power supply cable of
any machine. All cables should be in good condition with no bare insulation or frayed
➢ Any power supply switchboard/extension boards brought by Bidder should have
ELCB of 30mA rating and it should have sockets along with 3-pin plug
➢ Any type of cable brought by Bidder should not have any joint and should be of
sufficient capacity for the respective job.
➢ Bidder to bring their own 24V rating portable hand lamps along with cable of
(apparatus should be having 230V / 24V transformer) for the temporary lighting
arrangement required at site for the respective jobs.
➢ Bidder should bring sufficient qty no. of temporary light fixtures (230V or 24 V as per
requirement of job/contract) , extension boards, cables to draw supply from nearest
➢ Hand-held and portable machines shall be equipped with a built-in switch to switch
off power in case of emergency
➢ Bidder to ensure healthiness of their electrical equipment whenever brought to
GIPCL site and get them tested / verified by GIPCL Electrical Department
representatives before start using.
➢ Bidder to ensure - All portable electric apparatus shall be regularly examined, tested
and maintained to ensure that the apparatus and leads are in good order.
➢ Only three-core cable shall be used for single phase operated tools with the third
core connected to earth.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
➢ Ensure that all metallic portable appliances are provided with 3 pin plug and socket
connections with third pin be connected to the ground terminal where ever possible.
Also, the metal work of the apparatus is effectively earthed.
➢ All cables and connections should be sound and of adequate capacity and properly
insulated while using any welding machine and other power connections.
➢ The earthing arrangements should be properly made with earthing clamps or a
bolted terminal while using any welding machine
➢ Electric holders when not in use, should be placed on an insulated hook or the
holders should be fully insulated while using any welding machine
➢ Whenever the welder stops or leaves work for any appreciable time, the power
supply to welding machine shall be effectively disconnected while using any welding
➢ GIPCL will provide either single phase OR 3-phase 3 wire power supply from the
nearby point at job site. Bidder to supply the required cable between GIPCL power
supply point to equipment brought by Bidder for the specified job. Further, if Bidder’s
equipment requires 3-ph 4 wire supply then they should derive 3-ph 4 wire supply
from GIPCL 3-ph 3 wire supply system by incorporating sufficient capacity
transformer. Like for hydro jet cleaning system, mixer machine, induction heating
machine, SR machine etc., GIPCL will provide 3-ph 3 wire power supply.
➢ Cable between welding machine to GIPCL power supply point should have cable
TOP plug towards GIPCL power supply point of Make BALS having rating as 63Amp.
Contractors not following above electrical safety points at any point of time are liable to
penalty and their machine / apparatus shall be seized by GIPCL.
26. Penalty to be imposed for Violation of safety norms is proposed as follows:-
The Contractor & Contract workmen shall strictly adhere to Safety standards / Guidelines as
per practices. The list provided below is an indicative list to explain the principles behind
safety practice. If the contract workmen fail to comply with safety standards as per category A,
B & C below, penalty shall be levied on the contractor as per the table mentioned below:
Category Classificatio Examples / Cases Penalty
A n PPEs Working without Rs. 100 /-
Related helmet, shoes, safety per instant.
belt, gloves etc.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
Failure to adhere to HSE
guidelines/plans, careless • Rs. 500 /-
attitude in material per instant.
Machine being used with
damaged machine guard, • After three
unsafe electrical work - incidence, Per
workout plug top/improper incidence Rs.
electrical joints/cables lying 2500/-
on ground, electrical
equipment working without
proper earthing, machine
being used without
will disqualify
machine guard, Welding
machine without ELCB /
RCCB of proper rating,
participation in
Gas cylinder without test
certificate, Cylinder cap,
B NRV / Flash back arrester,
WI Related with
Cylinder trolley etc.
Unsafe working practices
at height more than
Working without permit or
th permit conditions like
hot work, height work etc.
as applicable, lifting tools
and tackles being used
without third party
inspection certificates in
form no. 9/10 as per
Factory Act – 1948 etc..
entry gate pass
Breach of safe practices by
C a particular person After two
repeatedly for three times. suspensions his
Penalty so levied against the contractors and company employees will be used during
the observation of National Safety Day.
The contractor, workmen following good safety practices in
their work area continuously will be rewarded / honored on
National safety day.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
16. REJECTION OF WORK:
If, as a result of inspection, examination or testing, the GIPCL‟s
Representative/Engineer decides that any materials, work or workmanship is
defective or otherwise not in accordance with the Contract, the
GIPCL/Engineer/ GIPCL‟s Representative may reject such plant, materials,
work or workmanship and shall notify the CONTRACTOR promptly, stating his
reasons. The CONTRACTOR shall then promptly make good the defect and
ensure that the rejected item complies with the Contract. If Contractor failed to
rectify the rejected work or workmanship, GIPCL/Engineer reserves the right
to deduct or withhold amount against rejected work or Workmanship.
CONTRACTOR shall not entitle for any claim or release of hold payment until
rectify the defect up to satisfactory of GIPCL. If Contractor failed to rectify any
such defective work or workmanship, GIPCL reserve the right to rectify at risk
and cost of the CONTRACTOR and deducted by the GIPCL from any
amount due, or to become due, to the CONTRACTOR‟s dues.
If the GIPCL/Engineer/GIPCL‟s Representative requires such materials, work or
workmanship to be retested, the tests shall be repeated under the same terms
and conditions. If such rejection and retesting cause the GIPCL additional costs for
the traveling and lodging costs of GIPCL/Engineer‟s personal for attending the
retest, such costs shall be recoverable from the CONTRACTOR by the GIPCL
and may be deducted by the GIPCL from any amount due, or to become due, to
the CONTRACTOR.
17. GENERAL TERMS AND CONDITIONS:
a. All tools & tackles, labours, equipments, vehicles, tractors, etc… to execute the
contract are in the scope of the contractor. The contractor should ensure that
tools& equipments are in healthy condition.
b. The decision of the Engineer-in-charge shall be final and binding on the contractor for
defining the terms and condition included in this contract.
c. If the work is not found satisfactory, Engineer-in-charge reserves the right to take
suitable action.
d. Contractor shall depute full time independent experienced site-in-charge
/independent site supervisor / s at site. They shall co-ordinate with GIPCL engineer
and shall bear overall responsibility of contract including joint certification, billing etc.
Such person shall function from site office of contractor at SLPP.
e. Contractor shall also nominate one safety supervisor at site and shall submit
nomination of safety supervisor in writing before commencement of contract. Safety
supervisor shall arrange small safety talk on every day morning or whenever required
with all workers working under this contract. He shall coordinate with concern
department‟s Engineer-in-charge on daily basis and report daily observations, tool-box
talk records etc. The work shall not be allowed without deploying safety supervisor and
a penalty equal to Rs.1,000/- per day absent of safety supervisor shall be levied from
f. Contractor shall strictly follow the existing work permit system of the GIPCL and
any future revisions.
g. The contractor has to take EC insurance policy for their workmen. The contractor
has to submit labour license(if applicable) and PF account number to the
Engineer-in-charge before start the work.
h. The contractor has to do the job timely. GIPCL shall not compromise in delay. In
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
case of delay of work without any valid reason, the GIPCL reserves the rights to
carry out the work by deploying other agencies at the risk & cost of contractor with
additional 10% overhead charges plus applicable GST as per GST laws & other taxes
& duties as per applicable extant laws.
i. Contractor shall mobilize the resources as per need within the period of Twenty
four hours. If the contractor fails to mobilize sufficient resources to complete the job
in time, GIPCL will execute the job through other agency at the risk and cost of the
contractor with additional 10% overhead charges plus applicable GST as per GST
laws & other taxes & duties as per applicable extant laws.
j. Contractor should mobilize all resources for efficient & smooth execution of contract
within fifteen days from the date of issue of Letter of Intent/Work Order.
k. The prices / item rates quoted shall remain firm till completion of the contract and
any agreed extensions thereafter and shall not be subject to any escalation except
statutory variation in Minimum wages, idle charges for labor, machinery, overhead
expenses etc… due to any reason whatsoever. No price escalation / idle charges
shall be entertained due to delay in work on unavailability of work front, non-issue
of work permit, holding of work permit for any reason, unavailability of contractor’s
supervisor, unavailability of contractor’s safety supervisor, violation of safety rules,
unsafe act by any of contractor’s worker, negligence & ignorance of safety &
quality instructions of GIPCL Engineer-in-charge or any other reason whatsoever.
l. Contractor must fulfill all the safety regulations and to take safety measures to
avoid hazards. Contractor shall arrange all standard adequate healthy safety PPEs
like but not limited to approved quality safety shoes& safety helmets, standard dust
masks, safety goggles, etc… as required and shall use exclusively under this
contract for all the time during working at specified locations failing which, the
Engineer-in-charge may hold the work and will take necessary action including
penalty as decided. If the contractor repeatedly violates safety rules/regulations
(more than three successive incidents), Engineer-in-charge may take necessary
action against the contractor, including appropriate financial penalty (Maximum of
Rs.2500/- per incident per man-day and as per clause no.15) and/or termination of
m. One or more jobs may be required to be done simultaneously and contractor shall
mobilize additional resources accordingly.
n. Timely completion of all jobs and works shall be the essence of this Contract.
Contractor should closely monitor each activities and complete the jobs as per the
time given by and under the supervision of the Engineer-In-charge and shall
ensure that sufficient manpower is deployed for the same.
o. The contractor has to complete the works as per the planning schedule and their
respective supervisor has to interact with Engineer in charge for PTW (Permit to
work)work instruction, Return of permit.
p. The contractor has to submit daily reports showing work carried out with details of
available manpower, tractors etc.
q. Any job other than the listed jobs in work order shall be executed by the contractor on
instruction from GIPCL and payment shall be made to the contractor on respective
item rate only.
r. The Government of India has enacted the Micro, Small and Medium Enterprises
Development Act, 2006 (the “Act”) and the Act has come into force from October
2006. The Bidder shall confirm whether your organization is registered under the
Micro, Small and Medium Enterprises Development Act, 2006. If your organization
is registered under the Act, please specify the category i.e., Micro Enterprise,
Small Enterprise or Medium Enterprise under which it is registered and kindly attach a
copy of your registration certificate.
s. The Bidder shall provide details of registration along with copy of the registration
certificate issued by the District Industries Centre/Department of Industries, etc of
the respective State Government. It is to be noted that large scale industries and
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
trading firms have been excluded from the purview of the Act.
t. GIPCL is an ISO 9001, ISO 14001, OHSAS 18001 & ISO 50001:2018 (EnMS)
certified company, and GIPCL gives extreme importance to maintain these global
standards. Contractor shall be required to observe these standards while working
with GIPCL. Contractor should ensure that his workmen/labour work in accordance
u. GIPCL shall impart safety training to the stone picking workmen in phased manner,
considering their working and relevant safety aspects / use of safety PPEs pertaining
to it. Contractor shall instruct the workman for attending these training sessions, as
and when informed by GIPCL’s Engineer In-charge.
v. All laws, rules, regulations, notifications, etc. stated in this tender document, as
amended from time to time shall be applicable. Where applicable self-certified
true copies of the required documents to be furnished, unless stated otherwise
18. CONTRACTOR’S SUPERVISION
The contractor shall, during the whole time the work is in progress, employ a
qualified experienced site-in-charges of the works with adequate experience jobs of
this nature and with the prior approval of the GIPCL / ENGINEER. Such in-
charge shall be constantly in attendance at the site during working hours. During
CONTRACTOR‟S supervisory engineer absence during working hours, if
unavoidable, and also beyond working hours, when it may be necessary to give
directions, orders may be given by the ENGINEER / GIPCL and shall be received
and obeyed by the CONTRACTOR‟S superintendent or Foreman who may have
charge of the particular part of the work in reference to which orders are given. If
requested to do so, the ENGINEER /GIPCL shall confirm such orders in writing.
Any directions, instructions or notices given by the ENGINEER / GIPCL to him,
shall be deemed to have been given to the CONTRACTOR. The representative of
the CONTRACTOR shall have all necessary powers to receive materials from the
GIPCL, issue valid receipts for the same, engage labour or purchase materials
and proceed with the work as required for speedy execution.
None of the CONTRACTOR‟S Superintendents, engineers, supervisors or labour
should be withdrawn from the work without due notice being given to the GIPCL /
ENGINEER; further no such withdrawals shall be made if in the opinion of the
GIPCL / ENGINEER such withdrawals will jeopardize the required pace of progress /
successful completion of the work.
The CONTRACTOR shall employ in or about execution of the work only such
persons as area careful, skilled and experienced in their respective trades, and
the GIPCL shall be at liberty to object to and require the CONTRACTOR to
remove any person employed by the CONTRACTOR in or about execution of
works who in the opinion of the ENGINEER misconducts himself or is incompetent or
negligent in the proper performance of his duties and all such persons shall not again
be employed upon the works without the prior permission of the GIPCL.
Neither the CONTRACTOR and the PURCHASER nor the ENGINEER shall hire or
employ any employee of the other party except by mutual consent.
19. CONTRACTOR TO REMOVE ALL OFFENSIVE MATTER IMMEDIATELY
All loose materials, wastage, packing materials, empty paint drums, cut pieces or other
matter of an offensive nature shall not be deposited on the surface ,but shall at once be
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
carted away by the CONTRACTOR to some pit or place provided by him away from the
site of work and approved by local authorities.
As a part of the work included I this contract ,the CONTRACTOR shall completely
remove and satisfactorily dispose of all temporary works & remove scaffolding material
to the extent directed .He shall tear down and dispose of all temporary works, shall
remove or grade, to the extent directed. all plant ,equipment, shall satisfactorily dispose
of all rubbish resulting from the operation under this contract and shall do all work
necessary to restore the territory embraced within the site of his operations to at least as
good order and conditions as at the beginning of the work under this contract.
20. FACILITIES TO BE PROVIDED BY GIPCL
A. The Company shall provide the following facilities to the Contractor at the
a.Electricity & water at nearest available one point. Further distribution to
be done by contractor at their cost.
b. Quarter(s) for supervisor/ Site in charge on chargeable basis in GIPCL’s
Township at discretion of GIPCL if available. Food on chargeable basis at
GIPCL ‘s Industrial Canteen as available. If not available ,contractor to make
his own arrangement for lodging and boarding locally or as appropriate at his
c. Workshop facility as available at site only. However contractor may visit the
workshop to ensure the existing facility .For the facility other than available
,Contractor has to carry out job outside at their own cost Place for site office.
d. First aid facilities as available on chargeable basis. if not available contractor to
make his own arrangement for the same locally or appropriate at his cost.
Apart from the above, no other facilities shall be provided by GIPCL.
B. GIPCL shall also conduct an orientation program appraising the workmen
regarding the safety norms and measures to be observed during work
operations at the plant site.
21. WORK MEASUREMENT/CERTIFICATION
a. The work to be performed on daily basis, the contractor shall take the
certification form GIPCL engineer regarding daily work carried out in line
with the tender and as per GIPCL engineer instructions, this daily
certification of measurement of work shall be the basis of processing your
b. Contractor should maintain one computer with printer for keeping daily
records and maintain the data.
c. Inspection of work will be done by Engineer in Charge or his authorized
representative. If the work is not found satisfactory engineer in charge
reserves the right to take suitable action.
22. PUBLIC HOLIDAYS
The Contractor shall be responsible for giving benefit to all his employees, employed
in whatsoever capacity, 09 Public/Paid holidays and the same shall be notified in
advance and due communication thereof shall be made to the Management.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
23. BENEFIT PAYABLE IN CASE OF ACCIDENT OCCURRING OUTSIDE
PREMISES OR BEYOND THE COURSE OF EMPLOYMENT
The Contractor shall provide an insurance coverage (Medical + Death Benefit) for
sum of Rs. 01/-Lakh to all his workmen/labour deployed at GIPCL-SLPP site for
the accident taking place anywhere outside the Company premises or at any
place when outside the Company premises anywhere in any capacity and in
whatsoever may be the manner.
24. FORCE MAJEURE
The performance of the obligations herein contemplated may be suspended without
incurring the penalty in the event of the subsistence of Force Majeure conditions.
If a Force Majeure situation arises, the affected Party shall promptly notify the
other Party in writing of such conditions and the performance shall be suspended as
per mutual agreement.
For the purposes of this clause, „Force Majeure‟ means an event beyond the
control of the Party and not foreseeable by the Party and shall include events of
floods, explosions, riots, wars, hurricane, epidemics, any other Act of God,
quarantine restrictions, terrorism, government actions and provided always that
such acts result in the impossibility of the further performance of the contract.
The Contractor shall indemnify and keep harmless GIPCL from and against all
actions, proceedings, claims, demands, losses, costs, damages and expenses
whatsoever which may be brought against or suffered by GIPCL which it may
sustain, pay or incur as a result of or in connection with the performance/ purported
performance/ non-performance of the contract by the Contractor.
In case, in any litigation pertaining to labour employed through contractor if any
direction or order is issued by court at any point of time the contractor shall
comply with and implement such direction or order whether passed at the time of
award of contract or during the pendency of contract. Further, the Contractor shall
indemnify the GIPCL against all consequences arising and affecting GIPCL owing to
the compliance of the orders by the Contractor.
26. GOVERNING LAW AND JURISDICTION
This tender document and contract shall be governed by the laws of India and the
Courts at Surat shall have jurisdiction regarding the same. Where any portion of the
General Condition of Contract is repugnant to or at variance with any provisions of the
Special Condition of Contract, then unless a different intention appears, the provision
of the Special Conditions of Contract shall prevail to the extent of such repugnancy of
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
SPECIAL CONDITIONS OF CONTRACT
1. DETAIL SCOPE OF WORK
Followings will be in the detail scope of work of the contractor:
1) Deployment of manpower for removal of stones, boulders, foreign materials, very
large size of lignite and tramp metal from running conveyor belts at different
locations i.e. BCN-M1A, S/R out plant machine boom conveyor, BCN-M2A, BCN-
M3A, BCN M7, BCN M4, ELHS S/R machine boom conveyor, BCN 2C, BCN
6A & BCN 6B as requirement of plant operation (deployed manpower shall be
allowed to trip the belt o n l y to remove large size of stones/lignite and
foreign materials from the system).
2) Stones, boulders, foreign materials removed from both conveyor and bunker grill
to be cleared from gallery and bunker grill on daily basis or as directed by engineer-
3) Contractor should deploy Supervisor / safety sergeant in all three shifts, which
shall be responsible for availability of adequate manpower and their safe
execution of the job during shift, including proper use of personal protective
equipment by all the personnel being deployed.
4) Contractor to designate a person as a site supervisor to look after and coordinate
the daily activities. The supervisor shall report to concerned engineer of GIPCL
and get the job certified on daily/shift basis. The daily reports duly certified by
GIPCL engineer shall be submitted along with the monthly bill and the payment
shall be made on the basis of the same.
5) Stone pickers can be deployed in other areas if felt necessary at the direction of
engineer-in-charge.
6) Work shall be executed strictly as per the instructions of engineer-in-charge
and as per the requirement of GIPCL.
General scope of work:-
1. All tools and plants and consumables shall be in the scope of contractor.
2. During monsoon period if manpower is idle than, all the manpower shall be
utilized for chute chock up removal at LHS.
3. Contractor shall make their own arrangement for transportation of manpower
1.1 SPECIFIC REQUIREMENT
a. Contractor should deploy sufficient manpower for the work.
b. The Government of India has enacted the Micro, Small and Medium
Enterprises Development Act, 2006 (the “Act”) and the Act has come into
force from October 2, 2006. The Bidder shall confirm whether your
organization is registered under the Micro, Small and Medium Enterprises
Development Act, 2006. If your organization is registered under the Act,
please specify the category i.e., Micro Enterprise, Small Enterprise or Medium
Enterprise under which it is registered and kindly attach a copy of your
registration certificate.
c. The Bidder shall provide details of registration along with copy of the
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
registration certificate issued by the District Industries Centre/Department of
Industries, etc of the respective State Government. It is to be noted that
large scale industries and trading firms have been excluded from the purview
d. Communication equipment like mobile phone is to be provided to all
responsible persons like site in charge, supervisors. Any change in
communication mode/number is to be intimated in writing to engineer in
e. One nos. s vehicle is to be kept separately for s t o n e p i c k e r s
m o v e m e n t as per tender guideline.
f. Contractor should mobilize all resources for efficient & smooth execution of
contract within 15 days from the date of issue of Letter of Intent.
g. GIPCL is an ISO 9001, ISO 14001, ISO 45001 & ISO 50001certified
company, and GIPCL gives extreme importance to maintain these global standards.
Contractor shall be required to observe these standards while working with GIPCL.
Contractor should ensure that his workmen work in accordance with them.
1.2 FAILURE DURING EMERGENCY
During any emergencies, contractor shall have to carry out the work by deploying
additional force within four hour notice period failing which GIPCL reserves the
right to carry out this work by engaging other party. The expenditure occurred due to
such situations, the Contractor will be held responsible & the same will be
recovered from the Contractor‟s monthly bill / any other pending bills along with
15% overhead charges. For repetitive failure of such work for more than two
incidents, GIPCL reserve the right to terminate the entire contract by forfeiting all
pending dues, Security Deposit & other retention money, if any, after giving
days notice to the contractor & this will be binding to the contractor.
1.3 MOBILIZATION AND EXECUTION
After issue of LOI/ Work order, contractor has to mobilize all resources within 15 days
1.4 TERMS OF PAYMENT
A. Conditions of Payment:
The contractor shall raise the separate running invoices in duplicate every month for
Rate Contract for Picking of Stones & foreign materials from running belt
conveyors of Lignite Handling System in respect of the work performed or completed
during the month along with the documents as hereinafter provided. On receipt of the
invoice complete in all respects and with all the said documents, the payment in
respect of the same shall be made within 21 days of such receipt of a complete
invoice as per the following terms of payment:
(i) 100% of monthly RA bill along with 100% taxes shall be released against the
work executed duly certified by GIPCL Income Tax (IT) will be deducted at
source from monthly RA bills as per the rules in force.
(ii) GST shall be paid along with bills after fulfillment of following terms.
(a) Submission of copy of registration certificate issued by GST Authority
(to be furnished only once).
(b) Citing the GST Registration no. And the date of issue of
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
registration certificate on invoices.
(c) Claim of GST amount with percentage (%) separately shown on the
(d) The contractor shall be required to submit the proof of payment of
GST of previous month/quarter, as may be applicable as & when
demanded by GIPCL/Owner/company.
(e) The Bidder shall inform the Owner in the event of its registration
certificate is cancelled or discontinued for whatsoever reason.
(iii) At the time of submission of the first monthly RA Bill, the Contractor shall
submit a certificate from Engineer-in-charge regarding availability of tools
& tackles, equipments, vehicles etc at site. The Contractor shall also furnish
the checklist as per ANNEXURE-E enclosed with the Section-F of tender
document along with the RA bill of respective month.
(iv) The contractor along with monthly RA Bill shall submit copy of P.F. Challan,
Xerox copies of wages register of previous month, Xerox copies of
attendance sheet of respective month & copy of ECR statement indicating
the employee and employer's P.F contribution of previous month with respect
of employees employed by him for the contract at GIPCL site.
(v) The Contractor shall submit his Final Bill within a period of three months of the
expiration or earlier termination of the contract or any extensions that may be
granted by GIPCL to the Contractor. GIPCL shall not entertain any bill for any
work item after expiration of period of three months.
(vi) The Contractor shall include all his claims in the Final Bill submitted by him
and accordingly the final bill submitted by the Contractor shall be deemed to
be inclusive of all and whatsoever the claims that the Contractor may have
from GIPCL. The Contractor shall not be entitled to claim any amounts which
are not mentioned in the Final Bill and the Contractor shall be deemed to
have waived any claims not mentioned in the Final Bill and shall not be
entitled to recover the same from GIPCL subsequent to the submission of
the Final Bill on any account and GIPCL shall stand absolved of all its
liabilities in respect of any such claims not raised by the Contractor in his Final
B. Payment Terms: -
➢ The rates shall be valid for a period of two years of the Contract Period The
contractor shall raise the RA BILL invoices in duplicate every month in respect of
the work performed or completed during the month along with the documents as
hereinafter provided. On receipt of the invoice complete in all respects and with all
the said documents, the payment in respect of the same shall be made within
days of such receipt of a complete invoice as per the following terms of payment:
➢ 100% of monthly RA bill along with 100% taxes shall be released against the
work executed duly certified by GIPCL Income Tax (IT) will be deducted at
source from monthly RA bills as per the rules in force.
➢ In case, Vendor/Supplier require payment earlier than stipulated time limit, then
GIPCL may levy early payment charges at prevailing standard lending rate of
SBI (1-year MCLR) + 2% for remaining period of agreed credit time limit.
However, GIPCL reserves the right to accept/reject early payment request. This
will not be applicable for any retention charges as per contractual condition.
C. Validity and Uniformity of Rates: -
Rates will remain firm throughout the contract period or any extension thereof. There
will not be any escalation/compensation to the contractor against any revision in
MWR (Minimum Wage Rate).
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
1.5 SUBMISSION OF TECHNICAL DOCUMENTS TO THE ENGR-IN-CHARGE
Contractor shall submit following documents to the Engineer-in-charge for
verification purpose of the bill:-
Shift certification sheet along with joint record of work done in the form of joint
inspection report duly signed by authorized representative of contractor and
GIPCL Engineer.
The bill will not be entertained without submission of above documents.
1.6 SUBMISSION OF STATUTORY COMPLIANCES WITH EACH BILL
Contractor shall submit each RA bill of work carried out along with following
(i) Copy of statutory compliance like labour license, wages payment register, EC
Policy, PF paid Challan with ECR, etc… along wage certificate pertaining to
respective bill period.
(ii) Notarized Indemnity Bond as per Performa, in case of Final bill.
(iii) No claim - No arbitration certificate as per Performa, after releasing final bill
Bill submitted without any of the above documents shall not be processed for
1.7 MEASUREMENT& DAILY REPORTS
The Contractor shall be required to furnish satisfactory job completion report to
GIPCL. The submission of report should be on daily basis, the monthly bill payment
shall be released based on the certified reports of the works.
1.8 GENERAL CONDITIONS OF CONTRACT
General Conditions of Contract (Section-C) and detail specification prepared by the
company will be applicable for this contract. The same is enclosed herewith. Bidders
are advised to go through the same.
Where any portion of the general conditions of contract is repugnant to or at
variance with any provisions of the special conditions of contract, then unless a
different intention appears, the provision of the special conditions of contract shall
prevail to the extent of such repugnancy of variance.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
SCHEDULE OF QUANTITIES & SoR
Sr.No. Location Quantity SoR Rate Amount (Rs.)
for Two without GST
1 BCN M1A TAILEND 2193 2766.4132
3 BCN M2A TAILEND 2193 2074.8099
5 BCN M7 TAILEND 2193 2766.4132
6 BCN M4 GALLERY 2193 2074.8099
Gross amount with GST
TOTAL contract value for two year without GST in Rs. 3,64,00,464 /-
Total contract value for two year with GST@18% is Rs. 4,29,52,548 /-
(Rupees Four Crore Twenty-nine Lakhs Fifty Two Thousand Five
Hundred Forty Eight Only)
My rates are as under at estimated value
_______ %age above the estimated value
_______ %age below the estimated value
Note: The rates shall include all labour cost, equipments, supervision, consumables, tools, tackles, all taxes &
duties (including GST).The applicable GST (Currently 18 %) shall be paid at actual Subject to submission of
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
LIST OF ANNEXURES & FORMS
CHECKLIST FOR PASSING THE BILLS
For the month of :
1) Work Order / P.O. No. & :
2) Nature of work :
3) Duration of Work Order : From to
4) Maxi. No. of manpower per day : M F Total
deployed in the month.
5) Details of Labour License : Valid up to for
6) Details of E.C Policy : Valid up to for
7) Documents attached for verification : Wage & Attendance Sheets.
for the previous month. Yes/No
P.F Challan Yes/No
8) Documents attached for verification : Bonus Payment Register
(in case of Final Bill) Yes/No
: Leave wage register Yes/No
9) Security Deposit / Retention Money : Yes / No if yes, Rs.
Date : Signature of Contractor
with official stamp
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
PROFORMA FOR CONTRACT SECURITY-CUM-PERFORMANCE GUARANTEE BY
SELLER / CONTRACTOR
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS Gujarat Industries Power Company Limited having its office at PO:
RANOLI, Dist. Vadodara – 391 350, Gujarat State, India (hereinafter referred to as
“The Company / Owner” which expressions shall unless repugnant to the subject
or context includes its legal representatives, successors and assigns) has entered
into a contract with M/s. ………………………………../ has placed a purchase
order on M/s………………………….(hereinafter referred to as “Contractor(s) /
Seller(s)” which expression shall unless repugnant to the subject or context
includes their legal representatives, successors and assigns )
for…………………………….on the terms and conditions as set out inter alia, in
the Company‟s contract No./ P.O.No.…………..date …………and various
documents forming part thereof hereinafter referred to as the
“said contract” which expression include all amendments, modifications
and / or variations thereto and whereas the Contractor(s) / Seller(s) has
agreed for due execution of the entire contract and guarantees its performance
including any parts executed through any other agencies / subcontractors
AND WHEREAS one of the conditions of the “said contract” is that
“contractor(s)/seller(s) shall furnish to the owner a Bank Guarantee from a bank
for ….% (……….percent) of the total value of the “said contract” against due and
faithful performance of the “said contract” including performance
guarantee obligations of the contractor(s) / seller(s) for execution / supplies made
under the “said contract.”
2. We …………………………….Bank having its branch office at ……….……..do
hereby agree and undertake to pay the amount due and payable under this
guarantee without any demur merely on a demand from the Company stating that
in the opinion of the Company, which is final & binding, the amount claimed
is due by reason of default made by the Contractor(s)/ Seller(s) in performing any
of the terms & conditions of the said Contract including defect liability obligations,
in fulfilling the performance guarantee obligation or loss or damage caused to or
would be caused to or suffered by the Company by reason of any breach by the
said Contractor (s)/ Seller(s) of any of the terms & conditions of the contract. Any
such demand made on the Bank by the owner shall be conclusive as regards the
amount due and payable by the Bank under this guarantee. However, our liability
under this guarantee shall be restricted to
Rs……..(Rupees………………………only).
3. We undertake to pay to the Company any money so demanded not withstanding
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
any dispute or disputes raised by the contractor(s) / Seller(s) in any suit or
proceeding pending before any office, court or tribunal relating thereto our liability
under this present guarantee being absolute and unequivocal. The payment so
made by us under this bond shall be a valid discharge of our liability for
payment there under. Our liability to pay is not dependent or conditional on the
owner proceeding against the Contractor(s)/ Seller (s).
4. The guarantee herein contained shall n o t be determined or affected or
suspended by the liquidation or winding up, dissolution orchange of
constitution or insolvency of the said Contractor(s)/ Seller(s) but shall in all respect
and for all purposes be binding and operative until payment of all money due or
liabilities under the said contract(s)/ Order(s) are fulfilled.
5. The Bank further unconditionally agrees with Gujarat Industries Power Company
Limited (GIPCL) that Gujarat Industries Power Company Limited (GIPCL) shall be at
liberty, without the Bank’s consent and without affecting in any manner the Bank’s
obligation under this Guarantee, from time to time, to:
a. Vary and / or modify any of the terms and conditions of the Agreement.
b. Extend and / or postpone the time for performance of the obligations of the Contractor
under the Agreement.
c. Forbear or enforce any of the rights exercisable by Gujarat Industries Power Company
Limited (GIPCL) against the Contractor under the terms and conditions of the Agreement.
6. This guarantee shall be in addition to and not in substitution or in derogation of any
other security held by Gujarat Industries Power Company Limited (GIPCL) to secure
the performance of the obligations of the Contractor under the Agreement.
7. No action, event or condition, which by any Applicable Law should operate to
discharge the Bank from liability hereunder, shall have any effect and the Bank
hereby waives any right it may have to apply such law, so that in all respects its liability
hereunder shall be irrevocable and, except as stated herein, unconditional in all
8. This guarantee will remain valid up ____________________ days or
______________ whichever is earlier. The Bank undertakes not to revoke this
guarantee during its currency without previous consent of the OWNER/PURCHASER
and further agrees that if this guarantee is extended for a period as mutually agreed
between bidder & owner/purchaser, the guarantee shall be valid for a period so
extended provided that a written request for such extension is received before the
expiry of validity of guarantee.
9. We ……………Bank further agree with the Company that the company shall have
the fullest liberty without our consent and without affecting in any manner our
obligations hereunder to vary any of the terms and conditions of the said
Contract(s)/ Order(s) or to extend the time of performance by the said Contractor(s)
Seller(s) from time to time or to postpone for any time or from time to time any of
the powers exercisable by the Company against the said Contractor(s)/ Seller(s)
and to forbear or enforce any of the terms and conditions relating to the said
Contract(s)/ Order(s) and we shall not be relieved from our liability by reason of
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
any such variation, or extension being granted to the said Contractor (s) /
Seller(s) or for any forbearance, act or omission on the part of the Company
or any indulgence by the Company to the said Contractor(s)/ Seller(s) or by any
such matter or thing whatsoever which under the law relating to sureties would, but
for this provision, have affect of so relieving us.
10. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………….(Rupees…………only) and shall remain in force till..……..Unless
a demand or claim under this Guarantee is made on us within three months from
the date of expiry we shall be discharged from all the liabilities under this
Corporate Seal of the Bank By its constitutional Attorney
Signature of duly Authorized
person on behalf of the Bank
With Seal & Signature code
Bidder shall submit BG from below mentioned banks only. Banks other than below mentioned list
are not Allowed.
• All Nationalized Banks • Axis Bank • ICICI Bank • HDFC Bank • Kotak Mahindra Bank •
IndusInd Bank • RBL Bank • DCB Bank • Federal Bank • Bandhan Bank • Standard Chartered
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
PROFORMA FOR BANK GUARANTEE FOR EARNEST MONEY DEPOSIT
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS M/s. Gujarat Industries Power Company Limited having its Corporate
Office at PO: RANOLI, Dist. Vadodara – 391 350, Gujarat State, India (hereinafter
called “The Company Owner” which expression shall unless repugnant to the subject
or context includes its legal representatives, successors and assigns) has issued
tender paper vide its Tender No……………………………………………for ----------------
-----------------(hereinafter called “the said tender”) to M/s.
…………………………… (hereinafter called the said Tenderer(s)” which expression
shall unless repugnant to the subject or context includes their legal representatives,
successors and assigns and as per terms and conditions of the said tender, the
tenderer shall submit a Bank guarantee for Rs.…………. (Rupees…. only)
towards earnest money in lieu of cash.
2. We…………………………………………………………Bank having its branch office at
do hereby undertake to pay the amount due and payable under this guarantee
without any demur, merely on a demand from the Company stating that in the opinion
of the company which is final and binding, the amount claimed is due because of any
withdrawal of the tender or any material alteration to the
tender after the opening of the tender by way of any loss or damage caused to or
would be caused or suffered by the Company by reason of any breach by the said
tenderer(s) of any of the terms and conditions contained in the said tender or failure
to accept the letter of Intent Agreement or thatthe amount covered under this
Guarantee is forfeited. Any such demand made on the Bank by the owner shall be
conclusive as regards the amount due and payable by the Bank under this guarantee,
However, our liability under this guarantee shall be restricted to an amount not
exceeding Rs………………. (Rupees………………. only).
3. We undertake to pay to the Company any money so demanded not withstanding any
dispute or disputes raised by the tenderer (s) in any suit or proceeding pending
before any office, court or tribunal relating thereto our liability under this present
guarantee being absolute and unequivocal. The payment so made by us under this
bond shall be a valid discharge of our liability for payment there under. Our liability to
pay is not dependent or conditional on the owner proceeding against the tenderer.
4. The guarantee herein contained shall not be determined or affected or suspended by
the liquidation or winding up, dissolution or change of constitution or insolvency of the
said tenderer(s) but shall in all respect and for all purposes be binding and operative
until payment of all money due or liabilities under the said contract(s) / Order(s) are
5. The Bank further unconditionally agrees with Gujarat Industries Power Company
Limited (GIPCL) that Gujarat Industries Power Company Limited (GIPCL) shall be at
liberty, without the Bank’s consent and without affecting in any manner the Bank’s
obligation under this Guarantee, from time to time, to:
a. Vary and / or modify any of the terms and conditions of the Agreement.agrik
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
b. Extend and / or postpone the time for performance of the obligations of the Contractor
under the Agreement.
c. Forbear or enforce any of the rights exercisable by Gujarat Industries Power
Company Limited (GIPCL) against the Contractor under the terms and conditions of the
6. This guarantee shall be in addition to and not in substitution or in derogation of any
other security held by Gujarat Industries Power Company Limited (GIPCL) to secure
the performance of the obligations of the Contractor under the Agreement.
7. No action, event or condition, which by any Applicable Law should operate to
discharge the Bank from liability hereunder, shall have any effect and the Bank
hereby waives any right it may have to apply such law, so that in all respects its
liability hereunder shall be irrevocable and, except as stated herein, unconditional in
8. We ……………..Bank Ltd. further agree that the guarantee herein contained shall
remain in full force and effect during the period that would be taken for the
finalization of the said tender and that it shall continue to be enforceable till the said
tender is finally decided and order placed on the successful tenderer(s) and or till
all the dues of the company under or by virtue of the said tender have been fully paid
and its claims satisfied or discharged or till a duly authorized officer of the company
certifies that the terms and conditions of the said tender have been fully and properly
carried out by the said tenderer (s) and accordingly discharges the guarantee.
9. That the Owner Company will have full liberty without reference to us and without
affecting this guarantee to postpone for any time or from time to time the exercise of
any of the power of the owner under the tender.
10. Notwithstanding anything contained herein before, our liability shall not exceed
Rs……… (Rupees…………only) and shall remain in force till……… (Date to be filled
up shall be 180 days from the date of submission of Bid).
Date………. ………………………… Bank
Corporate Seal of the Bank
By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
Bidder shall submit BG from below mentioned banks only. Banks other than below mentioned list
are not Allowed.
• All Nationalized Banks • Axis Bank • ICICI Bank • HDFC Bank • Kotak Mahindra Bank •
IndusInd Bank • RBL Bank • DCB Bank • Federal Bank • Bandhan Bank • Standard Chartered
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
PERFORMA CERTIFICATE
(No claim, No arbitration)
Chief General Manager (SLPP)
Gujarat Industries Power Company Limited,
Surat Lignite Power Plant,
Village: Nani Naroli, Ta. Mangrol,
Dist. Surat – 394110 (Gujarat).
We hereby confirm with free consent as under:-
1. The measurements certified in final bill is full and final. We accept all the certified
measurements and no claim related to the measurement is left.
2. The payment certified in that or above referred LoI / contract is full and final. We accept this,
and no claim related to payment is left.
3. The rates of the LoI / contract and its amendments are firm till completion of contract and
extension period. We shall not claim any escalation against these rates.
4. Along with the contract referred, the ARBITRATION CLAUSE also perishes i.e. we will not
resort to arbitration.
5. No extra items are left to be settled.
6. We do not have any claims against any item related to the LoI than those items certified in
7. We are accepting the recoveries or hold amount from our bills, if any, made by GIPCL
against non compliance or as decided by GIPCL within terms & conditions of contract.
8. We have paid royalties, taxes for all the materials procured by us, for carrying out the works
for above LoI and we indemnify GIPCL from any liability arising thereof.
9. In case of any disputes arising in future related to payment of royalties, all liabilities of
settlement of dispute and its payment if any, will be borne by us.
10. We have paid wages to all the workmen who were deployed by us for carrying out above
referred work as per prevailing Minimum wages act. We have also fulfilled all requirements
of the P.F. Act. We have maintained all records necessary as per the statutory
requirements. We hereby indemnify GIPCL from any disputes arising in future related to
payment of labours, Provident Fund, etc.. and confirm that all liabilities of settlements of
disputes and their payment is our responsibility.
The above confirmation will come into effect as soon as payment from final bill after due
recoveries will be received by us.
Signature, Stamp and date.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
TOOLS AND TACKLES TO BE PROVIDED BY CONTRACTOR
All tools and tackles required to execute the contract are in the scope of the
contractor. The contractor should ensure that tools and tackles are in healthy &
working condition. All consumable items would be in the scope of the contractor.
Sr.No. Description Nos.
2 Plastic bags for stone As per requirements
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
GUJARAT INDUSTRIES POWER COMPANY LIMITED
(Surat Lignite Power Plant)
SCHEDULE OF DEVIATION
All the deviations from the general and special conditions of contract shall be filled by
BIDDER clause by clause in this schedule.
Sr. SECTION CLAUSE NO AS PER TENDER DEVIATION
The bidder here by certifies that the above mentioned are the only deviations from
GIPCL’s General/ Special Conditions of this enquiry. The bidder further confirms that in
the events any other data and information presented in the BIDDER’s proposal and
accompanying documents are at variance with specific requirements laid out in the
GIPCL’s General /Special Conditions, then the latter shall govern and will be binding on
the BIDDER for quoted price.
COMPANY SEAL SIGNATURE …………………
DESIGNATION ……………..
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
(To be submitted on Company’s Letter Head)
Declaration cum Undertaking for Safety Laws and Regulations Compliance
(To be submitted on Company’s Letter Head)
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm,
agree and undertake that all the Statutory and Safety Laws and Regulations of the applicable
Authority/ies shall be strictly followed for all types of works at the site during the period of the
Contract, if awarded to me.
Signed and Stamped by the
Authorized Signatory of the Bidder
Declaration for Contractual Litigations
(To be submitted on Company’s Letter Head)
Please Tick (√) whichever is correct option
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm
that I /We have
a. Not invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings /
Depts. / Authorities and Govt. of Gujarat supported companies / undertakings /
organizations for the last three ( 03) years. There are no ongoing/pending legal matter(s)
with any of the Govt. of Gujarat Undertakings / GoG supported Companies, including
Please Tick ( )
b. Invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings /Depts. /
Authorities and Govt. of Gujarat supported companies / undertakings /organizations for the
last three (03) years.
Please Tick ( )
If “b” is applicable, please submit the details for the same.
The above is true, as on date, to the best of my knowledge. Any breach/ false statement
in this regard shall amount to disqualification of the Bid being submitted herein.
Signed and Stamped by the
Authorized Signatory of the Bidder
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
Authorized Signatory of the Bidder
PROCEDURE FOR MAKING ONLINE PAYMENT OF EMD/SD/TENDER FEE
1. For making online payment, first go to the website: www.gipcl.com
2. Then, click on the caption/link as can see like:
“Click here for Making Online Payment of EMD/SD, Advance for Ash, DM water etc.”
(The link is visible as horizontal highlighted below Tenders - News & Update Section. Can be
seen in below screenshot)
3. After clicking the link the new page will open. On this page, No need to enter User Name and
Password. Directly click on “Payment Form” given below the sign in option.
4. After clicking the “Payment Form”, the vendor has to enter the details asked which will be self
explanatory. It is desired that all the information may be filled correctly so that the payment
made can be tracked.
If the some required fields are not known/available, vendor may write “Not Available” and then
proceed. E.g. some information like Party code is not available to vendor or GST No. not
available with vendor.
Optional Note: Although mentioned as above can be proceeded with “Not available”, It will be
appreciated that regular vendors may obtain the party code from Materials Deptt. or Concerned
Person, so that the vendor can be identified. The same party code may be used for future
transactions also.
After entering the details, click on SUBMIT Button.
5. The vendor/Party will be redirected to Payment Gateway.
By selecting the desired payment mode, payment can be made:
6. After making the payment, the receipt will be generated which has to be shared with
Concerned Person of GIPCL.
Important Note: Please note that for making online payment through the above gateway, the
charges* as below will be applicable, which has to be borne by Vendor/Party making the
Payment Mode Charges
Net Banking Rs.9 + GST
Credit Card 0.75% + GST
International Card 3.00% + GST
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
PARTICULARS OF THE BIDDER
Sr. Particulars Please provide information
1. Name of Bidder
2. a. Registered Office Address:
b. Address for Correspondence:
3. Contact Details:
Contact Person Name
Telephone No. :
Year of establishment
COMPANY SEAL SIGNATURE …………………
DESIGNATION ……………..
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
CERTIFICATE OF COMPLIANCE BY CONTRACTOR
(To be submitted with each monthly bill on letter head along with labour compliance records)
of.........................to.......................... at Gujarat Industries Power Company Limited – Surat
Lignite Power Plant, Nani Naroli. I undertake to be bound by all the provisions of the
Contract Labour (Regulation & Abolition) Act 1970 and the Contract Labour (Regulation &
Abolition) Rules 1972, The Employees’ Provident Funds and Miscellaneous Provisions
Act 1952, Minimum Wages Act 1948, Payment of Wages Act 1936 and Payment of Bonus
Act 1965 and all other applicable labour laws in so far as the provisions are applicable to
me in respect of the employment of contract labour by me for the month of
Authorized Signature with Stamp
Place: Nani Naroli
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
GUJARAT INDUSTRIES POWER COMPANY LIMITED
PO: RANOLI, DIST: BARODA –
Reference PO No. Date:
Integrity Pact No.: Contract Period:
To create an environment where Business Confidence is built through best business
practices and is fostered in an atmosphere of trust and respect between providers of
goods and services and their users for the benefit of stakeholder, society and the nation.
GIPCL’S COMMITMENT PARTY’S COMMITMENT
Not to bring pressure / recommendation
To maintain the highest ethical standards in
from outside GIPCL to influence its
business and professions
Not to use intimidation, threat, inducement
To ensure maximum transparency to the
or pressure of any kind on GIPCL or any of
satisfaction of all stakeholders.
it's employees.
To fulfill the terms of agreement / contract and to
To be prompt and reasonable in fulfilling the
consider objectively the viewpoints of other
contract, agreement and legal obligations.
To ensure regular and timely release of To provide goods and / or services timely
payments for works done/services provided as per agreed quality and specifications.
To ensure that no improper demand is made by To maintain the general discipline in our
employees or by anyone on our behalf. dealings and transactions.
To give maximum possible assistance to all the
To be truthful and honest in furnishing
Vendors / Suppliers / Service Provider and others
to enable them to complete the works in time.
Not to divulge to others any information,
To provide all necessary information to suppliers
business details about GIPCL made
/contractors relating to contract / job to facilitate
available during the course of business
them to complete the contract / job successfully
relationship without the written consent of
To ensure that no hurdles are caused to vendors Not to enter into cartel / understanding
/ suppliers / contractors in execution of whether formal or informal so as to
agreement / contract / work. influence the price.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
Document submitted for Pre-Qualification
Sr. Qualification Document Remarks
No. criteria No. Reference no.
Surat Lignite Power Plant – 4X125 MW, Unit # I to IV: Tender for “Biennial Rate Contract for Picking of Stones
& foreign materials from running belt conveyors of Lignite Handling System for two years of contract period
CERTIFICATE OF COMPLIANCE BY CONTRACTOR
(To be submitted with each monthly bill on letter head along with labour compliance records)
of.........................to.......................... at Gujarat Industries Power Company Limited – Surat
Lignite Power Plant, Nani Naroli. I undertake to be bound by all the provisions of the
Contract Labour (Regulation & Abolition) Act 1970 and the Contract Labour (Regulation &
Abolition) Rules 1972, The Employees’ Provident Funds and Miscellaneous Provisions
Act 1952, Minimum Wages Act 1948, Payment of Wages Act 1936 and Payment of Bonus
Act 1965 and all other applicable labour laws in so far as the provisions are applicable to
me in respect of the employment of contract labour by me for the month of
Authorized Signature with Stamp
Place: Nani Naroli
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
PBG.pdf
Tender Document SP.pdf
Tender Document SP NIT.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .