Loading…
Loading…
Tender Value
Refer Docs
Closing Date
2 Jun 2023, 3:00 pmClosed
Block Development Officer(B.P)
Block Development Office, Thanthoni Block
Repairs to the Kitchen shed building at Sukkaliyur P.U.M. School H/O Karuppampalayam Panchayat
2023_RDTN_319541_6
Thanthoni Block - 15th Finance (B.P)-2023-24
Open Tender
Civil Works
Item Rate
90 days
Thanthoni Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Yes
5 Jun 2023
26 May 2023
2 Jun 2023
26 May 2023
2 Jun 2023
26 May 2023
Amount
Name of the Work : Repairs to the Kitchen shed building at Sukkaliyur P.U.M. School H/O Karuppampalayam Panchayat
Dismantling the existing plaster surface in CM incl. Clean, removal of dirt etc., complete
Dismantling the Plain Cement Concrete incl. clean, removal of dirt etc., complete
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specification.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Plastering with Cement Mortor 1:5 mix to 12mm tk incl. cost, conveyance of materials and all labour charges etc., complete
Plastering with Cement Mortor 1:3 mix to 10mm tk incl. cost, conveyance of materials and all labour charges etc., complete
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Distembering two coats with best approved Oil bound distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete
Painting with ready mixed enemal paint over Old iron works including cost andconveyance and all labour charges etc complete
Service connection Mains (SD 64)
Light Point (SD 17)
Power Plug point (SD 39)
Tube light Fitting (SD 87)
Bulk head Fitting (SD 83)
Rain Water down fall Pipe 110mm dia
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K.RADHA
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .