| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | ₹3.2 L | L1 | Accepted-AOC l1 |
| 2 | L2₹3.3 L+₹13,504 (4.28%)Rejected-AOC | ₹3.3 L+₹13,504 (4.28%) | L2 | Rejected-AOC l2 |
Tender Value
₹3.0 L
EMD Value
₹7,504
Closing Date
28 Jan 2025, 6:00 pmClosed
AJITH ANTO P
O/o Office of the Assistant Executive Engineer, Electrical Irrigation Sub Division Chalakudy
GENERAL-AMC 24 - 25 Kolappuram, Kooriyad , Mullankuzhi and Thrikkulam LIS Malappuram Dt.-Fully Comprehensive Annual Maintenance contract-General Electrical Work- Retender
2025_Irrig_722571_27
C-ETN-JAN/EL/24-25
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
CHALAKUDY
Please refer Tender documents.
10 documents required · 10 mandatory
₹665
₹7,504
22 Apr 2025
20 Jan 2025
30 Jan 2025
20 Jan 2025
28 Jan 2025
20 Jan 2025
Amount
Kolappuram LIS
OD207671/2024-2025:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, including scrapping, cleaning and painting with enamel paint.
OD132268/2024-2025: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD132260/2024-2025:Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD207672/2024-2025:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD207673/2024-2025: Fully Comprehensive Annual Maintenance contract of above31-60 HP squirrel cage induction motor with split case / End suction pump set controlling electrical accessories , panel board ,etc, including attending all repairs ,overhauling & , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump and motor through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc and starter AMC ) and maintain the motor pump sets , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD132261/2024-2025: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD132262/2024-2025:Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD164855/2024-2025:Lifting the 31-60 HP pump after disconnecting the base frame, decoupling the motor, using chain block, rope, chain etc. and placing them conveniently on the platform.
OD164856/2024-2025:Lowering down and erecting 31-60 HP pump and other accessories,( Accessories when necessary ) and erecting the pump on the pump base frame coupling with motor, in position checking correct alignment and trial run on full load
OD168768/2024-2025:Replacing old bearing and supply new bearing bearing no 6313SKF/FAG OR equivalent
OD168770/2024-2025:Supply, and filling of good quality LT grade transformer oil
Kooriyad LIS
OD207663/2024-2025:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, including scrapping, cleaning and painting with enamel paint.
OD132286/2024-2025: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD132281/2024-2025:Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD207664/2024-2025:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD207665/2024-2025: Fully Comprehensive Annual Maintenance contract of 31-60 HP slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc ,including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD207666/2024-2025: Fully Comprehensive Annual Maintenance contract of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD132282/2024-2025: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD132283/2024-2025:Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
Mullankuzhi LIS
OD132297/2024-2025: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD132292/2024-2025:Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD207679/2024-2025:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD207680/2024-2025: Fully Comprehensive Annual Maintenance contract of 31-60 HP slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc ,including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD207681/2024-2025: Fully Comprehensive Annual Maintenance contract of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD132293/2024-2025: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD132294/2024-2025:Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
Thrikkulam LIS
OD132298/2024-2025:Lowering down and erecting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD207683/2024-2025:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD207684/2024-2025: Fully Comprehensive Annual Maintenance contract of 61-110 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc, including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD132300/2024-2025:Lifting the 61-110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
AJITHKUMAR S. (BID ID -2079387)
Bidder Name
AJITHKUMAR S.
SAJEESH P
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1159195.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .