Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | ₹9.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.7 LRejected-AOC | ₹11.7 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | venu L2 | SHAJAN A K L1 |
|---|---|---|---|---|---|
| 1.00Working charges | |||||
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 275 | cum | 660 ₹1.8 L | 521 ₹1.4 L |
| 1.00 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 495 | metre | 32.23 ₹15,953.85 | 25 ₹12,375 |
| 1.00 | 100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. | 550 | metre | 104.31 ₹57,370.50 | 80 ₹44,000 |
| 1.00 | 100.98.1008:Engaging Coolie. | 3 | no | 1,082.18 ₹3,246.54 | 832 ₹2,496 |
| 1.00 | OD333192/2025-2026:Interconnection of newly laid 90mm PVC pipe X existing 90mm PVC Pipe including excavation, charges of cost of materials, all labour charges etc. complete as per the direction of departmental officers. | 1 | no | 1,475.78 ₹1,475.78 | 1,134 ₹1,134 |
| 1.01 | OD333193/2025-2026:Interconnection of newly laid 90mm PVC pipe X existing 150mm AC pipe including excavation, all labour charges and cost of materials etc. complete as per the direction of departmental officers. | 1 | no | 1,864.8 ₹1,864.80 | 1,433 ₹1,433 |
| 2.00Cost of materials | |||||
| 2.00 | 100.98.213:Supply of PVC Pipe, 6kg/cm2, 90mm Dia. | 550 | metre | 143.45 ₹78,897.50 | 110 ₹60,500 |
| 3.00Road restoration charges | |||||
Tender Value
Refer Docs
EMD Value
₹29,612
Closing Date
18 May 2026, 3:00 pmClosed
AEE W S Subdivision N Paravur
AEE W S Subdivison N Paravur
DEPOSIT-Pallippuram Panchayath-Extension of laying 90mm PVC Pipe at Pulimuttu in ward 1 of Pallippuram Panchayath-Pipeline Work
2026_KWA_850201_1
WRD/KWA-CE(CR)/TR/6601/2026
Open Tender
Civil Works - Others
Pallippuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹29,612
Yes
18 Jun 2026
12 May 2026
21 May 2026
12 May 2026
18 May 2026
12 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Working charges | ||||||
| 1.001 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | - | cum | - | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | - | metre | - | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | 100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. | - | metre | - | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | 100.98.1008:Engaging Coolie. | - | no | - | - | BI01010001010000000000000515BI0100001117 |
| 1.005 | OD333192/2025-2026:Interconnection of newly laid 90mm PVC pipe X existing 90mm PVC Pipe including excavation, charges of cost of materials, all labour charges etc. complete as per the direction of departmental officers. | - | no | - | - | BI01010001010000000000000515BI0100001118 |
| 1.006 | OD333193/2025-2026:Interconnection of newly laid 90mm PVC pipe X existing 150mm AC pipe including excavation, all labour charges and cost of materials etc. complete as per the direction of departmental officers. | - | no | - | - | BI01010001010000000000000515BI0100001119 |
| 2Cost of materials | ||||||
| 2.001 | 100.98.213:Supply of PVC Pipe, 6kg/cm2, 90mm Dia. | - | metre | - | - | BI01010001010000000000000515BI0100001121 |
| 3Road restoration charges | ||||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1436603.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 1.65 MB
BOQ_1436603.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid