| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC 431 9 INDIRA UDHYAN MARG VIKASNAGAR DEHRADUN | ₹1.9 Cr Quoted ₹1.6 Cr | L1 | Accepted-AOC Accepted. |
| 2 | L2₹1.6 Cr+₹1.4 L (0.90%)Rejected-AOC 5 A WEST REST CAMP DEHRADUN | ₹1.6 Cr+₹1.4 L (0.90%) | L2 | Rejected-AOC Rejected. |
| 3 | Rejected-Technical 8 RAMBAGH KANWALI ROAD DEHRADUN | - | - | Rejected-Technical As per attached letter. |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Bidder did not submitted required documents. |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Bidder did not submitted required documents. |
Tender Value
₹1.9 Cr
EMD Value
₹3.3 L
Closing Date
8 Jun 2023, 3:00 pmClosed
Superintending Engineer, 9th Circle, PWD, Dehradun
Superintending Engineer, 9th Circle, PWD, Yamuna Colony, Dehradun
Renewal work by SDBC of following Roads in Mussoorie constituency, under AR2023-24. (1) Masonic lodge to Kingkraig motor road, km 1. (2) Cart Mekenji motor road, km 1 to 6.
2023_pwd_58916_1
3338/1C-9/2023, Dated 16.05.2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Mussoorie
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer, Pro. Division, PWD, Dehradun
₹3.3 L
Superintending Engineer, 9th Circle, PWD, Dehradun
14 Sept 2023
22 May 2023
8 Jun 2023
22 May 2023
8 Jun 2023
30 May 2023
29 May 2023
Amount
Masonic lodge to Kingkreg (Picture place) road
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD)
Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Grading II - 10mm using VG - 30 bitumen (bituminous binder @ 5 % of mix)
Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level,uniform and free from streaks and holes.
Cart Makengi road
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD)
Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Grading II - 10mm using VG - 30 bitumen (bituminous binder @ 5 % of mix)
Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level,uniform and free from streaks and holes.
M/S DOON INFRASTRUCTURE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .