Loading…
Loading…
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
17 Jul 2026, 6:00 pmClosed
Dy.Minicipal Commissioner - West Zone
Requried Repairing And Renivoation work of Diff.Muncipal Buidling Work Under Of Ahmedabad Muncipal Corporation At Nava Vadaj Ward in West Zone.(ARC)
322800
1/26-27 (T.N.31)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹25,000
10 Jul 2026
10 Jul 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
Name of Work:- Repair And Maintance And Revnovation Work
of Diff.Building Under Of Ahmedabad Muncipal Coporation In
Nava Vadaj Ward.(ARC)
AHMEDABAD MUNICIPAL CORPORATION
WEST ZONE - ENGINEERING DEPARTMENT
TENDER ABSTRACT SHEET
Name of Work:- Requried Repairing And Renivoation work of Diff.Muncipal Buidling Work
Under Of Ahmedabad Muncipal Corporation At Nava Vadaj Ward in West Zone
Sr. Qty Items Rate Per Amount Rs.
Excavation for foundation up to1.5 m depth including sorting
out and stacking of useful materials and disposing of
theexcavated stuff upto 50 Meter lead.(A) Loose or soft
A 10.00 1.5 to 3.0 mt.depth 128.52 Cmt
Excavation for foundation for depth from 1.5 m to 3.0 m
including sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter lead.(C) Hard
Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers not
exceeding 20 cm. in depth consolidation each deposited
layer by ramming and watering.
Filling in plinth with sand underfloors including
watering ramming, consolidating and dressing etc. complete.
Filling in foundation and plinth with murrum or selected soil in
layers of 20 cm. thickness including watering,
ramming and consolidating etc.
Providing and laying cement concrete1:5:10 (1-
Cement: 5- coarses sand and:10-hand broken stone
aggregates 40mm nominal size) and curing
complete excluding cost of formworkin (A) Foundation and
Plinth (upto 10 ton).
Providing and laying cement concrete1:4:8 (1-
Cement: 4- coarses and:8-hand broken stone
aggregates 40mm nominal size) and curing complete
excluding cost of formworkin (A) Foundation and Plinth
Providing and laying cement concrete 1:3:6 (1-Cement : 3-
coarse sand : 6- hand broken stone aggregates
mmnominal size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth..
Providing and laying cement concrete 1:3:6 (1-
Cement:3-coarse sand:6-hand broken stone
aggregates 20mm nominal size) and curing complete
including cost of formwork in (A) wall caps/coping (upto
Providing and laying cement concrete work 1:2:4 ((1-
Cement:2- coarse sand:4-graded aggregates 20mm
nominal size) curing complete excluding cost
of formwork and reinforcement.
a 1.00 Foundations, footings, base or columns and mass 3661.30 Cmt
b 10.00 Slabs, landing, shelves, balconies, lintels, beams, 4012.47 Cmt
girders and cantilivers upto floor two level
Independent piers, columns, and pillars, upto floor two level
Provdg. & laying cement concrete 1:2:4 (1 cement :
coarse sand : 4 graded stone aggregates 20 mm nominal
size) for reinforced concrete chhajjas not exceeding
10 cm. thickness upto floors two level including
finishing the exposed surfaces with cement mortar
1:3 (1 cement : 3 find sand) to give a smooth and even
surface centering and form work and curing complete
excluding cost of reinforcement.
Providing and laying in position Ready Mixed M-
150 grade concrete for reinforced cement conctere
work, using cement content as per approved Design
Mix manufactured in fully automatic batching
plant and transported to site of work intransit mixer for a
lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of
R.M.C. from transit mixer to site of laying, excluding the
cost of centering shuttering finishing and
reinforcement including cost of admixtures
inrecommended proportions as per IS:9103 to
accelerate/ retard setting of concrete, improve work
ability without impairing strength and durability as per
direction of theEngineer-in-charge. Without Fly Ash (Min
cement level as per latest IS456 shall be
maintained) (Cement level 320 kg )
Providing and laying in position Ready Mixed M-
200 grade concrete for reinforced cement conctere
work, using cement content as per approved Design
Mix manufactured in fully automatic batching
plant and transported to site of work intransit mixer for a
lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of
R.M.C. from transit mixer to site of laying, excluding the
cost of centering shuttering finishing and
reinforcement including cost of admixtures in
recommended proportions as per IS:9103 to
accelerate/ retard setting of concrete, improve work
ability without impairing strength and durability as per
direction of theEngineer-in-charge. Without Fly Ash (Min
cement level as per latest IS456 shall be
maintained) (Cement level 400 kg )
Providing and laying in position Ready Mixed M-
250 grade concrete for reinforced cement conctere
work, using cement content as per approved Design
Mix manufactured in fully automatic batching
plant and transported to site of work intransit mixer for a
lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of
R.M.C. from transit mixer to site of laying, excluding the
cost of centering shuttering finishing and
reinforcement including cost of admixtures in
recommended proportions as per IS:9103 to
accelerate/ retard setting of concrete, improve work
ability without impairing strength and durability as per
direction of theEngineer-in-charge. Without Fly Ash (Min
cement level as per latest IS456 shall be
maintained) (Cement level 450 kg )
Providing and laying in position Ready Mixed M-300 grade
concrete for reinforced cement conctere work , using cement
content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in
transit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as per mix
design of specified grade for reinforced cement concrete work
including pumping of R.M.C. from transit mixer to site of
laying, excluding the cost of centering shuttering finishing and
reinforcement including
cost of admixtures in recommended proportions as per IS:
9103 to accelerate/ retard setting of concrete, improve
workability without impairing strength and durability as per
direction of the Engineer - in - charge. Without Fly Ash (Min
cement level as per latest IS 456 shall be maintained)
(Cement level 475 kg )
Providing and laying in position Ready Mixed M-350 grade
concrete for reinforced cement conctere work , using cement
content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in
transit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as per mix
design of specified grade for reinforced cement concrete work
including pumping of R.M.C. from transit mixer to site of
laying, excluding the cost of centering shuttering finishing and
reinforcement including
cost of admixtures in recommended proportions as per IS:
9103 to accelerate/ retard setting of concrete, improve
workability without impairing strength and durability as per
direction of the Engineer - in - charge. Without Fly Ash(Min
cement level as per latest IS 456 shall be maintained)
(Cement level 500 kg )
Providing and laying controlled cement concrete /
Ready Mix Concrete of M-200 and curing complete,
excluding the cost of form work and reinforcement for
reinforced concrete work in:
(A) 5.00 Foundations, footings, base of columns, and mass 3874.20 Cu.M.
(B) 1.00 Walls from top of foundations /level up to floor Four level. 4199.80 Cu.M.
Slabs,landing,shelves,Balconies Lintels, Beams, Girders and
Cantilever upto floor
(D) 1.00 Columns, pillars, posts, and struts, up to floor Four level. 4255.90 Cu.M.
(E) 1.00 Staircase up to floor four level. (excluding landing) 4115.10 Cu.M.
(K) 1.00 Vertical and horizontal fins up to floor four level. 4338.40 Cu.M.
Providing and Laying ordinary cement concrete 1:2:4
(1-Cement 2-coarsesand: 4-graded stone aggregates
20 mm nominal size) and finishing smooth with curing
etc. complete including the cost of form work but excluding
the cost of reinforsement for R.C.C work in (iv) Slabs
having more than 13 cm and upto 15 cm.thickness
Providing and Laying ordinary cement concrete 1:2:4
(1-Cement 2-coarsesand: 4-graded stone aggregates
20 mm nominal size) and finishing smooth with curing
etc. complete including the cost of form work but excluding
the cost of reinforsement for R.C.C work in (iv) Slabs
having more than 8 cm and upto 10 cm.thickness
Brick work using common burnt clay building
bricks having crushing strength not less than
35kg./Sq.Cm.in foundation and plinth in Cement
Mortar1:6 (1-Cement :6 - fine sand)
50.00 (A) Conventional (upto 10 ton) 3981.21 Cmt
50.00 B) Modular 3981.21 Cmt
Extra Rate for brickwork in Above Item for super
structure above plinth level upto floor two level (B)
a 50.00 (A) Conventional (upto 10 ton) 40.09 Cmt
b 50.00 B) Modular 42.66 Cmt
c 1.00 39.79 Per Floor
C) above floor two level Item No. 2(6.13) (A) Modular Per Cum
d 1.00 38.56 Per Floor
D) above floor two level Item No. 2(6.13) (B) Conventional
Half brick masonry in common brunt clay building
bricks having crushing strength not less than 35 Kg/Sq.Cm.
in Cement mortar 1:5 ( 1-Cement : 5 coarse sand ) in
foundation and Plinth conventional brickwork
Extra for half brick masonry in super structure above
plinth level upto floor two level (B) conventional
Providing and laying Pre cast Light weight concrete hollow
core wall with hollow core concrete unit of approved
make & size of 92 mm thick, 600 mm wide and 2400 mm/
2600 mm/ 2850 mm/ 3000 mm/ 3300 mm in legth made
from of controlled cement concrete M20 having cube
compressive strength not less than 20 MP a jointing with high
strength & tensile adhesion non-shrink cementitious
joint compound /P.U. Foam. (Plaster not required)
Providing and laying Pre cast Light weight concrete hollow
core wall with hollow core concrete unit of approved make
& size of 120 mm thick, 600 mm wide and 2400 mm/
mm/ 2850 mm/ 3000 mm/ 3300 mm in legth made from
of controlled cement concrete M20 having cube
compressive strength not less than 20MP a jointing with high
strength & tensile adhesion non-shrink cementitious
joint compound/ P.U.Foam. (Plaster not required)
Providing and laying Pre cast Regular concrete hollow
core wall with hollow core concrete unit of approved
make & size of 92 mm thick, 600 mm wide and 2400 mm/
2600 mm/ 2850 mm/ 3000 mm/ 3300 mm in legth made
from of controlled cement concrete M35 having cube
compressive strength not less than 35 MP a jointing with high
strength & tensile adhesion non-shrink cementitious
joint compound/ P.U.Foam. (Plaster not required)
Providing and laying Precast Regular concrete
hollow core wall with hollow core concrete unit of
approved make & size of 120 mm thick, 600 mm wide and
legth made from of controlled cement concrete M35
having cube compressive strength not less than 35 MP a
jointing with high strength & tensile adhesion non-shrink
cementitious joint compound /P.U.Foam. (Plaster not
Providing form work in ordinary timber planking so as
to give a rough finish including centering, shuttering,
strutting and propping etc. height of propping and
centering below supporting floor to celling not exceeding
4 M & removal of the same for in situ reinforced or
plain concrete work upto floor four level
a 5.00 Foundation, footings, bases of columns etc. and mass 114.45 Smt
b 5.00 (B) Flat surfaces such as soffits of supspened floors slabs 168.00 Smt
Landings and the like. (1) Floors etc. upto 200 mm in
c 5.00 (B) Flat surfaces such as soffits of suspended floor roof slabs 270.90 Smt
Landings and the like. (2) Floors etc. above 200mm in
d 5.00 Vertical surface such as walls (any thickness) partitions and 229.95 Smt
the like including attached buttresses & string course & the
e 5.00 (ii) Sides And Soffits Of Beam, Haunchings 192.10 Smt
Cantilevers, Girders, Bressumers And Lintels Not
Exceeding 1 M In Depth.
f 5.00 (G) Columns PillarsPosts and struts. (1) Square Rectangular 297.68 Smt
Polygonal in plan.
g 1.00 (2) Circular or curved in plan. 422.10 Smt
h 1.00 (H) (2) Sides and soffits of Beams Beam Haunchings canti- 192.15 Smt
levers Girders Bressumers and Lintels exceeding 1M.in
Providing and fixing 35 mm thick shutters for Doors,
windows and clear story windows including anodised
alluminium butt hinges with necessary screws.
a 4.00 (A) Indian Teak Wood (ii) Fully Glazed. 3211.96 Smt
b 4.00 (B) Indian Teak Wood (ii) Fully Panelled 3902.15 Smt
c 4.00 (C) Indian Teak Wood (iii) Partly panelled and partly 3557.15 Smt
Providing and fixing 35 mm thick shutters for Doors,
windows and clear story windows including black enamelled
M.S.butt hinges with necessary screws.
a 5.00 (A) Indian teak wood. (i) Fully Panelled.(upto 10 ton) 3620.47 Smt
b 5.00 (A) Indian teak wood. (ii) Fully Glazed.(upto 10 ton) 2930.08 Smt
c 5.00 (A) Indian teak wood. (iii) Partly panelled and partly 3275.28 Smt
glazed. (upto 10 ton)
Providing and fixing 35 mm thick panelled, glazed or
panelled and glazed shutters for Doors windows and clear
story windows including anodised alluminium But hinges
with necessary screws and indian teak wood shutters with.
a 5.00 (A) Plywood sheet panels. 3459.09 Smt
b 10.00 (B) Particle board panels 3464.51 Smt
c 10.00 (C)Hard board panels. 3433.66 Smt
d 9.00 (D) Asbestos sheet panels. 3406.53 Smt
Providing and fixing 25 mm thick shutters for cup
boards etc. including black enamelled M.S. butt hinges
with necessary screws.(A) Indian teak wood. (i) Fully
Panelled. (upto 10 ton)
a 1.00 Providing and fixing 25 mm thick shutters for cupboards etc. 2594.74 Smt
including anodised alluminium butt hinges with necessary
screws. (A) Indian teak wood. (ii) Fully Glazed.
Providing and fixing 25 mm thick shutters for cupboards etc.
including anodised alluminium butt hinges with necessary
screws. (A) Indian teak wood. (ii) Partly panelled and partly
Providing and fixing plain asbestos cement sheet 6 mm
thick in partitions including fixing to fames with screws
etc, complete with 50 mm x 12 mm Deodar wood
beading (Frames to be paid separately) (upto 10 ton)
Providing and fixing in partitions 4 mm thick medium hard
board of approved quality including fixing to fames with
screws etc complete with 50 mm x 12 mm teak wood
beading (Frames to be paid separately) (upto 10 ton)
25 mm thick wooden shelves supported on 40 x
mm x 6 mm T or L iron brackets fixed at suitable
distances but not exceeding 75 cm. apart with
Mango wood or equivalent quality. (upto 10 ton)
40 mm thick wooden shelves supported on 40 x
40mm x 6 mm T or L iron brackets fixed at suitable distances
not exceeding 75cm. Apart with Mango wood or
equivalent quality. (upto 10 ton)
33 100.00 Providing and fixing M.S. round or square bars with M.S. 68.53 kg
flats at required spacing in wooden frames of windows
and clerestory windows.(upto10 ton)
Providing and fixing M.S. grills of required pattern to
wooden frames of windows etc. with M.S. flats at required
spacings and frame alround, square or round bars with
round headed bolts and nuts or by screws (A) Plain Grill.
Providing and fixing M.S. grills of required pattern to
wooden frames of windows etc. with M.S. flats at required
spacings and frame alround, square or round bars with
round headed bolts and nuts or by screws (A) Ornamental
Grill. (upto 10 ton)
Providing and fixing glazed louvered glass
windows and ventilators with teak wood frame 10 cm. x
7 cm. size including 3 coats of oil painting to wood work
etc.complete. (upto 10 ton)
Providing and fixing glazed louvered glass
windows and ventilators with teak wood frame 10 cm.x7
cm. size including 3 coats of oil painting to wood work
etc.complete.with wooden louvers plank 12mm thick (upto
Providing and fixing 35 mm thick shutters for Doors,
windows and clere story windows including Indian teak
wood frames 10 cm x 7 cm. size including anodized
alluminium fixtures and fastenings including primer coat of
approved quality and two coats of oil painting etc,
complete.(ii) Fully Glazed.
Providing and fixing 35 mm thick shutters for Doors,
windows and clere story windows including Indian teak
wood frames 10 cm x 7 cm. size including black enamelled
iron oxidixed fixtures and fastenings including
primer coat of approved quality and two coats of oil painting
etc, complete.(ii) Fully Panelled.
Providing and fixing 35 mm thick shutters for Doors, windows
and clerestory windows including Indian teak wood frames
cm x 7 cm. size including anodized alluminium fixtures and
fastenings including primer coat of approved quality and two
coats of oil painting etc, complete. (iii) Partly panelled and
Providing and fixing 30 mm thick FACTORY MADE
SOLID PANEL PVC DOOR SHUTTER consisting of frame
made out of M.S.tubes of 19 gauge thickness and size of
mm x 19 mm for stiles and 15 mm x 15 mm for to p and
bottom rails.M.S. frames hall have a coat of steel primers
of approved make and manufacture, M.S. frames hall be
covered with 5 mm thick heat moulded PVC ‘C’ channel
of size 30 x 50 mm formings tiles, and 5 mm thick 75 mm
wide PVC sheets for to prail, lock rail and bottom rail on either
side, and 10 mm (5 mm x 2) thick, 20 mm wide cross PVC
sheet as gap insert for to p rail and bottom rail, Panelling of
5 stiles and rails with 30 mm wide x 5 mm thick PVC
sheet beading on eighter side, and joined together with
solventcement adhesive,. An additional 5 mm thick PVC
strip of 20 mm width is to be stculkon the interiors ide of
the ‘c’ channel using PVC solventcement
adhesive etc. complete as per direction of Engineer
incharge, manufacture’s specification and drawing.
Providing and fixing in position collapsible steel
shutters with vertical channels 20 x 10 x 2 mm braced
with flat iron diagonal 20 x6 mm size with top and bottom
rails T iron 40 x 40 x 6 mm with 38 mm dia steel pulleys
complete with bolts, units, locking arrangements, stoppers,
handles, including a priming coat of red lead paint &
Providing and fixing 1 mm thick M.S. sheet sliding
shutters with frame and diagonal braces of 40x40x6
mm angle iron, 3.15 mm M.S.gusset plates at Junctions and
corners 25 mm dia. pulley, 40x40x6 mm angle
and T-iron huide rail at top and bottom respactively
with handles, stoppers and locking agangement etc,
including applying a priming coat of red lead paint. (upto
Providing and fixing rolling shutters of approved make made
of 80 mm wide M.S.laths inter-locked together
through their entire length and jointed together at theends by
end locks mounted on specially designed pipe shaft
with bracket plates, guide channels and
arragements for inside and out side locking with
push-pull operation including the cost of hood cover
and spring etc. complete. (A) Shutters having width
Providing and fixing rolling shutters of approved make made
of 80 mm wide M.S.laths inter-locked together
through their entire length and jointed together at theends by
end locks mounted on specially designed pipe shaft
with bracket plates, guide channels and
arragements for inside and out side locking with
push-pull operation including the cost of hood cover
and spring etc. complete. (A) Shutters having
Providing & Fixing in position Alluminium doors with
frame using approved quality anodised extruded
alluminium section as approved by Engg.in
charge(Jindal alluminium) (a) Frame sections 101.6x44.45
mm (b) Shutter bottom vertical & top section 83.5x44.45
(wt.1.31 kg/mt.)(at 1.31 kg/mt) (c) Shutter bottom
section at 114.3x44.45 mm at (1.37kg/mt) Shutter
middle section at 100x44.3 wt.(1.37 kg/mt) incl.providing &
installing 5 mm thick approved color Acrylic sheet
of standard quality fixed with glazing chips on upper pannel
& Laminated sheet on lower pannel (wtt.0.13 kg/Rmt)
etc.comp.as direction of engg.in charge.(N.S.)
Providing and fixing extruded aluminum window having
extruded aluminum Colour Powder Coated section frame
main outer size 127mm x 38.10mm x 1.35mm ,@ Wt.1.384
Kg/mt,horizontal Four track member size 122.20mm x
31.75mm x 1.10mm @ Wt. 1.205 Kg/mt,vertical member of
size 122.20mm x 31.75mm x 1.50mm ,@ Wt. 1.398 Kg/mt
with sliding shutters of horizontal member size 40mm x 18mm
0.456Kg/mt,vertical member of size 40mm x 18mm x 1.29mm
@ wt.of 0.456Kg/mt,@ with 5 mm thick transparent bronze
colour tinted float glass with powder coated aluminum fittings
and fixtures and transparent silicon sealant glass fixing to
frame as per details etc complete for window.
Providing & Fixing in position Alluminium vents with
frame using approved anodised extruded alluminium
section as approved by Engg. In charge.(Jindal
alluminium) units equivalent Approved Rate)Frame section
of 63.50 x 38.50 mm. (wt. 0.68Kg/Rmt) incl. Providing &
Installing 5 mmthick approved color Acrylic sheet of
standard quality etc. comp.
Providing and fixing standared extruded of alluminium
section of size 63 mmx38.10 mmx1.2 mm (Jindal
Section:2434, @ Wt.0.643 Kg/mt) with colour
anodized alluminium frame for ventilation with 5 mm
thick frosted glass as details etc complete for Ventilation
Providing and fixing standared extruded of alluminium section
of size 63.50 x 38.10 x 1.95 mm,@ Wt 1.094Kg / Rmt with
colour Powder Coated alluminium frame with 5 mm thick
transparent bronze colour tinted float glass as details etc
complete for Fix Partition
Providing and laying 40 mm thick marble chips flooring
rubbed and polished (I.E.terrazo) to granolithic finish with
under layer 30 mm thick cement concrete1:2:4 (1-Cement:
2-coarse sand: 4-graded stone aggregate 10 mm
and down gauge) and to player 10 mm thick with white,
black or white and blak marble cihps of required sizes from
mm to 4 mm nominal size laid in cement marble powder mix
3:1 (3- Cement:1-Marble powder by weight) in
proportion of 4:7 (4- Cement: 7-marble chips by
volume) (C) Medium Shade pigment with approx
50% white cement and 50% ordinary cement (In top layer
only) (upto 10 ton)
Providing and laying marble chips skirting (Terrazo) or
dedo rubbed, and polished to Granolithic finish to player
mm white, black or white and black marble chips of
size from smallest to 4 mm nominal size laid in cement
marble powder mix 3:1 (3-Cement: 1 marble powder
by weight) in proportion of 4:7 (4-cement marble powder mix:
7-marble chips by volume) (B) Light shade pigment with white
cement (In top layer only)
Providing and laying white glazed tiles 6mm thick in flooring
treads of steps and landing laid on a bed of 12mm thick
cement mortar 1:3 (1-cement : 3-coarse sand ) finishing with
flush pointing in white cement.
Providing and laying Ceramic tiles 6 mm thick in flooring
treads of steps and landing laid on a bed of 12 mm thick
cement mortar 1:3 (1- cement :3-coarses and) finishing with
flush pointing in white cement. (upto 10 ton)
Providing & Fixing 20 mm thick Mirror Polished Decorative
Granite Board with Computerised Golden Letters
Discription as per instructions of engg. in charge to
M.S. frame structure for Inaugaration & Public
Handover Function (N.S.)
Providing and laying Vitrified tiles 8 to 10 mm thick, 36''x36'' in
flooring treads of steps and landing laid on a bed of
mm thick cement mortar 1:3 (1-cement:3-coarses and)
finishing with flush pointing inwhite cement. (upto 10 ton)
Providing and laying Vitrified tiles 8 to 10 mm thick, 24''x24'' in
skrting risers of steps and dedo on 10 mm thick cement
plaster 1:3 (1- cement: 3-coarse sand) and jointed
with white cement slurry (upto 10 ton)
Providing and laying Vitrified tiles 8 to 10 mm thick, in skrting
risers of steps and dedo on 10 mm thick cement plaster
1:3 (1-cement:3- coarse sand) and jointed with white
cement slurry (upto 10 ton)
Providing and laying 24" x 24" vitrified Tiles 8 to
mm th. Double Charged gloosy/ Matt of Approved make
as approved by Adl.C.E. / consultants in flooring over
mm thick cement mortar 1:6 (1 cement : 6 coarse
sand)on new surface& jointed with colour cement slurry
incl with flush pointing & cleaning the surface etc. comp.
Providing and laying 24" x 24" vitrified 8 to 10 mm
th.Double Charged Gloosy / Matt tiles of Approved
make as Approved by Adl.C.E. / Consultants for upto
cm high skirting as approved by Engineer in charge over
10 mm thick cement mortar 1:6 (1 cement : 6 coarse
sand)on new surface& jointed with colour cement slurry
incl with flush pointing & cleaning the surface etc. comp.
Providing and laying polished Kota stone slab flooring over
20 mm (Average) thick base of cement mortar 1:6
(1-cement:6-coarses and) or L.M.1.1.5 (1-Lime
putty:1.5-coarses and) laid over and jointed with grey
cement slurry mixed with pigment to match the shade of
slab including rubbing and polishing etc. complete. (A)
mm thick (upto 10 ton)
Providing and laying marble stone slab flooring over 20mm
(average)base of cement mortar 1:6 (1-cement : 6 coarse
sand) or L.M. 1:1.5(1- lime putty : 1.5 - coarse sand) laid and
jointed with gray cement slurry including rubbing and
polishing complete. (A) Marble slab 25mm
Providing and laying polished Kota stone slab flooring over
20 mm (Average) thick base of cement mortar 1:6
(1-cement:6-coarses and) or L.M.1.1.5 laid over and
jointed with grey cement slurry including rubbing and
polishing etc.complete. (B) 30 mm thick (upto 10 ton)
Providing and laying polished kota stone slab 25 mm thick in
risers of steps, skirting Dedo and pillars laid on 10 mm thick
cement mortar 1:3 (1-Cement :3 coarses and) and
jointed with gray cement slury mixed with pigment to
match the shade of slab including rubbing and polishing
etc.complete. (upto 10 ton)
Providing and laying cement concrete flooring 1:2:4
(1-cement: 2-coarses and:4-graded stone aggregate
20mm nominal size) laid in one layer and finished with a
floating coat of neat cement. (A) 40mm thick. (upto 10 ton)
Providing and laying cement concrete flooring 1:2:4
(1-cement: 2-coarse sand:4-graded stone aggregate
20mm nominal size) laid in one layer and finished with a
floating coat of neat cement. (B) 50mm thick. (upto 10 ton)
Providing and fixing pre-cast concrete kerb stone
of gray cement based concrete block 30 cm length,
cm height and 15 cm thick of M250 grade concret as per
approved design and including excavation for fixing in
proper line and level, filling the joint with C:M 1:3 (1 cement
:3 fine sand) etc complete. (upto 10 ton)
Providing and fixing pre-cast Rubber Dye / steel Dye inter
locking concrete block 60mm thick with grade of concrete
M300 pnumatic compressed / vibrated mechanically and as
approved design Confirming to IS 15658 : 2006 including
mm Sand layer for levelling and filling the joint with sand in
proper line and level as per guidlines of IRC : SP 63-2018 etc.
Providing and laying broken china mosaic flooring for
terrace using 12 mm to 20 mm broken pieces of glazed tiles
to be laid over cement mortar 1:3 to plain or slope and to be
tempered to bring mortar creme out upto surface using
white cement including rounding off junctions and
extending them up to15 cm along the wall, clearing with
water and oxalic acid etc.asdirected.
Providing and laying coloured glazed tiles of the
size 300 mmx200 mmx8 mm/300 mmx450 mmx8 mm
in skirting, risers of steps and dedo on 10 mm. thick
cement plaster 1:3 (1cement: 3 coarse sand) & jointed
with white cement slurry.
Providing corrugated G.I. sheet of class-3 roofing
fixed with glavanished iron J or L Hooks, Bolts and
nuts 8 mm diameter with bitumen and G.I. limpet washer or
G.I. limpet washer. filled with white lead complete excluding
the cost of purlins, Rafters and Trusses. (1) 0.80 mm thick
sheet.(up to10 ton)
Providing ridges or hips 600 mm over allin plain G.I.
sheet class-3 fixed with G.I. J or L Hooks and nuts
mm dia G.I. Limpet and bitumen washer complete. (1)
Providing and fixing 150 mm wide 450 mm over all semi
circular plain G.I.sheet class-3 gutter with Iron brackets
mmx3 mm size Bolts, Nuts, washers etc. including
making necessary connection with rain water pipes. (i)
Providing and fixing five courses water profing
treatment with bitumen felt consisting of second and
fourth course of blown/ bitumen or/and residual
bitumen applied hot at 1.2 kg.per Sq.M.of area for each
course and first course with fibre base bitunen
saturated under lay type land third course with fibre base self
finished felt type 2 grade 1 and fifth and final course of
stone grit 6 mm and down size or pea sizes gravel
spread at 0.008 Cu.Metre/Sq.metre
preparation of surface excluding grading complete. (upto
10 ton) including
Providing and fixing on wall face C.I. Rain water pipe
including filling the joints with spun yarn soaked in neat
cement slurry and cement mortar 1:2(1- Cement :
2-fine sand) (A) 75 mm dia.
Providing 15 mm thick cement plaster in single coat
on Rough (Similar) side of single or half brick walls for
interior plastering up to floor two level and finished even
and smooth in (i) Cement mortar 1:3 (1-cement :3-sand)
Providing 20mm thick sand faced cement plaster on walls
upto height 10 metres above ground level consisting of 12mm
thick backing coat of C.M. 1:3 (1-cement : 3-sand) and 8mm
thick finishing coat of C.M. 1:1 (1-cement : 1-sand) etc.
Colour washing with lime on wall surface (two coats)
over and including a primary coat of white washing to
give an even shade after through brooming the surface to
remove all dirt, dust, mortar drops and other foreigh
Removing dry or oil bound distemper by a
washing and scraping and sand papering the wall
surface smooth including necessary repairs to
scratches complete.
Distempering with dry distemper of approved brand and
manufacture (two coats) and of required shade on wall
surfaces of given an even shade, over and including
a priming coat of whiting after thoroughly brooming
the surface free from mortar dropping and other foreign
Distempeing (Two coats) with oil bound distemper of
approved brand and manufacture and of required shade
on wall surfaces to give an even shade, over and
including a priming coat with distemper primer of
approved brand and manufacture after thoroughly
brushing the surface free from mortar dropping and
other foreign matter and also including preparing
the surface even and sand papered smooth.
Extra Coat for Above Item over above for every
subsequent coat of approved brand and manufacture.
Wall painting (two coats) with plastic emulsion paint of
approved brand and manufacture on undecorated
wall surface to give an even shade including throughly
brushing the surface free from mortar droppings and
other foreign matter and sand papered smooth.
81 1.00 Extra over item for every sub sequent coat of wall 33.39 Sqm
painting with plastic emulsion paint of approved brand
81 1.00 Extra over item for painting with plastic emulsion paint of 5.36 smt
a approved brand on ceilings and sloping roofs.
Applying priming coat over new steel and other metel
surface after and including preparing the surface by
throughly cleaning, oil, grease, dirt and other foreign
matter and scoured with brushes fine steel wood, scrapers
and sand paper with ready mixed priming paint brushing
Painting two coats (excluding priming coat) on new
steel and other metal surface with enamel paint, brushing,
interior to give an even shade including cleaning the
surface an even shade including cleaning the surface of all
dirt, dust and other foreign matter.
Painting one coats (excluding priming coat) on
previously painted steel and other metal surface with enamel
paint, brushing to give an even shade including cleaning
the surface of all dirt, dust and other foreign matter.
85 1.00 Extra over item for every sub sequent coat of paint. 50.40 Sqm
Painting two coats (excluding priming coat) on new
steel and other metal surface with synthetic enamel paint,
brushing to give an even shade including cleaning the
surfaceofalldirt,dust and other foreign matter.
Painting one coats (excluding priming coat) on
previously printed steel and other metal surface with synthetic
enamel paint, brushing to give an even shade including
cleaning the surface of all dirt, dust and other foreign matter.
88 1.00 Extra over Above item for every sub sequent coat of 43.47 Sqm
Painting two coats (excluding priming coat) on
external surface of new rain water, soil, waste and vent
pipes and fittings with ready mixed bituminous brushing,
black, anti corrosive to give an even shade including
cleaning of all dirt, dustand other foreign matter.(75 mm dia)
Painting two coats (excluding priming coat) on
external surface of new rain water, soil, waste and vent
pipes and fittings with ready mixed bituminous brushing,
black, anti corrosive to give an even shade including
cleaning of all dirt, dust and other foreign matter.(100 mm dia)
Painting two coats (excluding priming coat) on new
wood and wood based surface with enamel paint, interior
to give an even shade including cleaning the
surface of all dirt, dust and other foreign matter sand
papering and stopping. (a) Ready mixed paint
brushing wood primier pink.
Painting one coats (excluding priming coat) on
previously painted wood and wood based surface with
enamel paint, to give an even shade including cleaning the of
all dirt, dust and other foreign matter.(b) Ready mixed
paintbrushing priming for enamel
Extra over Above item for every sub sequent coat of paint.
Painting two coats (excluding priming coat) on new
wood and wood based surface with ready mixed paint,
brushing, oil, gloss, semi gloss to give and even shade
including cleaning of all dust, dirt and other foreign
matters and papering and stopping.
Finishing wall with weather proof exterior emulsion paint
on wall surface (two coats) to give an required shape
even shade after thoroughly brushing the surface to remove
all dirt, and remains of loose powdered
materials.etc complete
Applying two coats of Birla (white cement based) or
Asian (acryliclapy-putty) or equivalent & two coats of
primer of approved brand and manufacture on new wall
surface to give an even shade including thoroughly brushing
the surface free from mortar dropping and other foreign
matter and sand papered smooth.
Painting two coats (excluding priming coat) on new
wood and wood based surface with enamel paint, interior
to give an even shade including cleaning the
surface of all dirt, dust and other foreign matter sand
papering and stopping.
98 0.00 3.15 per letter
Writing letter or figures on any surface with black per
japan paint (stops, comas, hyphens and the like not to Cm/Ht
be measured and paid for separately) (i) Block
(Letters/Figures) (Per 10 Letter pet CM.HT)
99 0.00 0.07 per letter
Extra over items for using thick white paint instead of per
black japan paint. (i)Block (Letters/Figures) Cm/Ht
100 0.00 3.47 per letter
Writing letter or figures on any surface with black per
japan paint (stops, comas, hyphens and the like not to Cm/Ht
be measured and paid for separately) (ii)
Indian(Letters/Figures)
101 0.00 Extra over items for using thick white paint instead of 0.07 per letter
black japan paint. (ii) Indian (Letters/Figures) perCm/Ht
Painting lines, deashes, arrows, letters etc on roads, Air
fields and like in two coats with road marking paint, brushing
including cleaning the surface of all dirt, dust and other
foreign matter. (i)Over 10cmi n width
Painting lines, deashes, arrows, letters etc on roads, Air
fields and like in two coats with road marking paint, brushing
including cleaning the surface of all dirt, dust and other
foreign matter.(ii) Upto 10 cm in width
Painting lines, deashes, arrows, letters etc on roads, Air
fields and like in one coats with road marking paint, brushing
including cleaning the surface of all dirt, dust and other
foreign matter. (i)Over 10cm in width
Painting lines, deashes, arrows, letters etc on roads, Air
fields and like in one coats with road marking paint, brushing
including cleaning the surface of all dirt, dust and other
foreign matter. (ii) Upto 10cm in width
106 0.00 Demolition including stacking of serviceable materilas and 1047.38 Cu.M.
disposal of unserviceable materials with all lead and lift. (i)
Demolition of Brick work and stone masonry including
stacking of serviceable materil as and disposalof
unserviceable materials with all lead and lift.(ii) In Cement
108 0.00 Dismentaling tiled of stone floors laid in mortar including 47.25 Sqm
stacking of serviceable materil as and disposal of
unserviceable materials with all lead and lift.
Dismentaling of sheet roofing including ridges, Hips,
Valleys, Gutters etc. stacking of serviceable materil as
and disposal of unserviceable materials with all lead
and lift.(i) G.I.sheet roofing.
110 0.00 Dismentling steel work including distempering and 3.63 Kg.
stacking the materials with all lead and lift.
Dismentling doors, windows, ventilators etc. (wood
or steel) shutters including chowkhats architraves,
hold fasts and other attachment etc. complete and
stacking the material within all lead and lift.(i) Not exceeding
Dismentling doors, windows, ventilators etc. (wood
or steel) shutters including chowkhats architraves,hold
fasts and other attachment etc. complete and
stacking the material with in all lead and lift.(ii) Exceeding
3 Sq.M.in area.
Dismentling barbed wire in fencing including making rolls
and also including dismentling fencing posts including all
earth work concrete in base and making good the
disturbed ground stacking useful materials as
directed and disposing as directed and disposing
of the unserviceable materials with all lead and lift.
114 0.00 Dismentling C.I. pipes G.S.W. pipes abd A.C. rain 74.03 Rmt
water pipes with fittings and clamps including stacking the
materials with all lead and lift (for any dia, of pipe)
115 0.00 Dismantling santtary fittings like wash basin . W.C. pan 401.63 Each
Indian and Europe an type, flushing tank etc. including
stacking the materials with all lead and lift
Scraping oil paint from steel and other metal surface and
making the surface even (with Hand Scraping.)
Removing and scraping of old deteriorated plaster
of any thickness from wall / R.C.C member
including stacking of serviceable material and disposal
of unserviceable from site of work with all lead and lift
118 0.00 Providing and fixing M.S. fan clamps of shape and 168.53 Each
size as specified in existing R.C.C. slab including cutting
chase and making good.
119 0.00 Cutting out cracks of roof terrace to V-section, cleaning 64.58 Rmt
out, wetting, grouting with cement and sand slurry 1:3 (1-
cement 3-sand ) (upto 10 ton)
Cutting out cracks roof terrace to V-Section cleaning out
and filling solidly with a hot mixture of bitumen and
clean dry sand (1:1 by weight) (up to 10 ton)
Providing & Fixing in position Alluminium doors with
frame using approved quality anodised extruded
alluminium section as approved by Engg.in charge(Jindal
alluminium)(a) Frame sections 101.6x44.45 mm (b)
Shutter bottom vertical & top section 83.5x44.45
(wt.1.31 kg/mt.)(at 1.31 kg/mt) (c) Shutter bottom section at
114.3x44.45 mm at (1.37 kg/mt) Shutter middle section at
100x44.3 wt.(1.37 kg/mt) incl.providing & installing
mm thick approved color Acrylic sheet of standard
quality fixed with glazing chips on upper pannel &
Laminated sheet on lower pannel (wtt.0.13 kg/Rmt)
etc.comp.as direction of engg.in charge.(N.S.)
Providing & Fixing in position Fully Panelled / Partly
Panelled Partly Glazed / Fully Glazed Alluminium doors
with frame using approved quality anodised
extruded alluminium section as approved by Engg. In
charge.(Jindal alluminium )(a) Frame sections 101.6x44.45
mm b) Shutter vertical & top section 83.5x44.45
(wt. 1.31 kg/mt.)( at 1.31 kg/mt) © Shutter bottom
section at 114.3 x44.45mm at ( 1.37 kg/mt ) Shutter
middle section at 100x44.3 wt. (1.37 kg/mt ) incl. providing
& installing 5 mm thick Glass of standaed quality fixed
/ 12 mm thick Laminated sheet with glazing chips (wt.
0.13 kg/ Rmt) in panels etc. comp. as per Detail Given
& direction of engg.in charge.
Providing & Fixing in position Alluminium window
2/3/4 track sliding / fix type with frame using approved
anodised extruded alluminium section as approved by
Engg. In charge.(Jindal alluminium) units
equivalent. including P/F installing 5 mm thick clear/tinted
Glass of standard quality etc.comp.
Providing & Fixing in position Alluminium vents with
frame using approved anodised extruded alluminium
section as approved by Engg. In charge.(Jindal
alluminium) units equivalent Frame section of 63.50 x
mm. (wt.0.68 Kg/Rmt) incl. Providing & Installing
mm thick Glass of standard quality etc. comp.
Providing and fixing of Ridge flashing for roof
panel shall be made out of 0.5 mm thick pre coated
GI sheet. The Pre coatedsheet shall be of minimum
240 mpa steel grade confirming to IS 14246:1995 and
shall have zinc coating of minimum 120 gsm as per
IS:277:1992, 5-7 microns epoxy primer on both side of
the sheet and polyester top coat 15-18 micron. The PP GI
Sheet shall have plastic protective guard film of minimum
25 microns to avoid scratches during transportation. The
ridge shall be fixed to the steel members by poprivetor
self drilling/self stitching fastners @ maximum 450mm c/c
along length of capping/flashing etc complete .
126 5.00 Supplying and fixing vinyl flooring over the surface having 963.00 Smt
1-2 mm thickness as per directed by engineer
incharge etc as completed (N.S.)
Providing and laying 15mm bamboza wooden
flooring as per architect's drawing with all
necessary details as directed by the project
consultants. Use underlay for better result as per Detail
specifications and directed by the project consultants. (N.S.)
Approved Rate )
Providing and fixing 1.20 Metre high fencing with
Metre long M.S. Angle posts 40 mm x 40 mm x 6 mm and
oil painting 3 coats fixed at 2.5 Mt, C/c. with five
Horizontan lines and two diagonals of galvanised steel
barbed wire weighting 9.38 Kg. per 100 Metre, strained and
fixed to posts with G.I, staples including fixing the
posts in ground with 0.5 M x 0.5.M x 0.5 M. block in C.C
1:5:10 etc complete.
Renovation and Repairing work in Chainlink fencing any
size and also refixing work incl. febrication work with all
materails to be painted one coat of primer and
twocoats of paint as directed inline and level. (N.S.)
Constructing a sink (chowkedi) with C.C. 1:2:4, 12 cm.
thick over B.B. masonry in C.M, (1:6) in front and dwarf wall
1.0 Mt. high and 23 cm. thick cement plaster to
masonry / in C.M.1:3) and cement concrete flooring in 1:2:4:
mix 5cm.dia.drain pipe etc.complete.
Constructing a cooking platform 60 cm. width and 70 cm
high resting on B.B. Masonry walls 23 cm. thick in C.M.
(1:6) with (i) Fixing or precast R.C.C. 1:2:4) 8 cm.
thick slab with marble chips set in C.M. (1:6) (6 mm thick
terrazo) with plastering on exposed faces walls in C.M.
(1:4) etc complete.
Extra rate for using Ready Mix Concrete of any grade
for below ground level to vertical upto any floor with
delivery & suction Pipe & Pump etc. The rate includes fule,
pump operator, skilled labor, driver etc completed and as per
direction of engineer in charge
P/A Tremix with dewartering machine and floater
machine on constructed CC work for finishing the surface
as per requirement. The rate including all machinaries,
labor, loading, unloading, transportaion etc
complete as per direction given by engineer incharge.
Carring out timber treatment to all wood work including
drilling holes and spraying oil based chemical solution on
surface of timber work for termite control including labour and
material etc. complete. Using Chlordene 20 EC. As
Per 6113_part III Consentration Weight1.00 percent is
recommended one litre chemical emulsion dillute with
liter of kerosene precent concentration. Total
dillute concrentration will be 10 litre inclusive of the
litre chemical emulsion appication 0.75 / Litre chemical
per one Sqmt printed two coat wood surface.
Applying general insecticide pest control treatment to
floors, cup boards etc including labour material etc.
complete. Using Heptachloride 20 EC. As Per
6113_pests Consentration Weight 0.50 percentis
recommended one litre chemical emulsion dillute with
liter of water will give. Total dillute concrentration will be
litre inclusive of one litre chemical emulsion appication
0.5 Litre chemical / Sqm of surface is recommended
Carring out plinth treatment to post construction / existing
structure by spraying chemical solution for termite
control treatment including labour and material consist
ment with I.S. specification. Using Chlordene and
Chior purfiles 20 EC. As Per 6131_paret-II
Consentration Weight on percentis recommended i.e one
litre 20 EC chemical emulsion with 19 liter give 1%
concrentration inclusive of one litre chemical emulsion
appication attherate of 5 Litre chemical / Sqm of
surface is recommended as per I.S
Carrying out wall treatment for termite control including
spraying with chemical solution in oil base (0.5 Lit./Sq.M.)
including labour and material Using Hepachlor
concentration 20 EC. As Per IS.6316_paret-II
Consentration by Weight 0.50 percentis
recommended i.e one litre chemical emulsion
dillute with 39 liter go fIS concrentration total dillite
concentration will be 40 litre inclusive of one litre
chemical emulsion appication at the rate of 7.5 Litre
chemical / Sqm of surface is recommended as per I.S
Providing erecting and fixing double coated ISI water tank of
required capacity each with all necessary fittings and
connection etc. complete on terrace
Providing and fixing to wall, ceiling and floor galvanised
Mild steel tubes (Medium grade) of the following
nominal bore, tube fitting and clamps including making good
the wall ceiling and floor.
10.00 (A) 15mm (upto 10 ton) 244.33 Rmt
10.00 (B) 20mm (upto 10 ton) 297.25 Rmt
10.00 (C) 25mm (upto 10 ton) 393.93 Rmt
10.00 (D) 32mm (upto 10 ton) 491.51 Rmt
1.00 (E) 40mm (upto 10 ton) 596.73 Rmt
1.00 (F) 50mm (upto 10 ton) 779.60 Rmt
Providing and laying in trenches galvanised mild steel
tubes (Midium grade) of the following nominal bore,
and tube fitting (Earth work in trenches to be
measured and paid for separately)
8.00 (A) 15mm (upto 10 ton) 150.91 Rmt
10.00 (B) 20mm (upto 10 ton) 190.97 Rmt
10.00 (C) 25mm (upto 10 ton) 279.39 Rmt
10.00 (D) 40mm (upto 10 ton) 421.12 Rmt
1.00 (E) 65mm (upto 10 ton) 716.66 Rmt
1.00 (H) 80mm (upto 10 ton) 910.69 Rmt
Making connection of galvanised Mild steel distribution
branch with galvanised mild steel main 50 mm to 80 mm
nominal bore by providing and fixing tee including
cutting and threading the pipes complete.
Providing and fixing to wall ceiling and floor 6.0 Kg.F/Cm2
working pressure poluthene pipes of the following out
side Dia. Low densidy, complete with special falnge
compression type fittings,wall clips etc.including
making good the wall ceiling and floor.
Providing and fixing to wall ceiling and floor 10.0Kg.F/Cm2
working pressure polythene pipes of the following out
side Dia. Low densidy, complete with special falnge
compression type fittings, wall clips etc. including
making good the wall ceiling and floor.
Providing and fixing cast iron (Spun) Nahni trap of
the following nominal diameter of self cleaning design with
C.I. screaed down or higned grating including cost of
cutting and making good the walls and floor 100 mm inlet and
50 mm outlet.(C)100mm dia.
Providing and fixing water closet squatting Pan
(Indian type W.C.Pan) size 580 mm (Earth work, bed
concrete, foot rest and trap to be measured and paid for
separately) (A) Vitreous China. (I)Long pattern = White
Provdg. & fixing wall mounted White / Color
Vitreous China European water closet with integral
P trap of "Cera" - Clair Series or equivalent incl. seat
cover , Chair Bracket etc. complete as per direction of engg.
In charge.(N.S.)
Providing and fixing wsh down water closet (Europe
an type, W.C.Pan) with integral P or S trap including jointing
the trap with soil pipe in Cement Mortar1:1 (1-
Cement:1-fine sand) (Seal and cover to be measured and
paid forseparately) (A) vitreous China Pattern :(i) in
Provdg. & Fixing Flat Back Large Urinal of White/ colour of
"Cera" or " Hindware" incl. C.P. Brass waste coupline
waste pipe, pvcconnection etc. Complete.( size
149 5.00 Providing & Fixing Angle cock of " Ess Ess" - Trend 675.00 No.
series or equivalent standard make as approved by
engg. in charge all complete. (N.S.)
Providing and fixing 100 mm size P or S trap for
water closet squatting pan including jointing the trap with
the pan and soil pipe in cement Mortar1:1 (1-Cement :
1-Fine sand)(A) Vitreous China.Pattern in white colour
Providing and fixing wash basin with single hole for pillar
tap with C.I.or M.S. brackets painted white including
sutting holes and making good the same but excluding
fittings. (A) Vitreous China: (ii) Flat Back wash basin 550 mm
x v 400 mm size.(i) In white colour.
Providing and fixing Kitchen sink with C.I. or M.S. brackets,
painted white including cutting holes in walls and
making good the same but excluding fittings. © Vitreous
China Sink. (i) 600 mm x 450 mmx 150 mm size
Providing and fixing 600 mm x 450 mm bevelled edge
mirrror of superior glass mounted on 6 mm thick A.C.
sheet or ply wood sheet and fixing to wooden pluge with
C.P. brass screws and washers.
Providing and fixing chromium plated brass halftrun flush cock
of approved quality including fixing in pipe line etc.
complete.(ii) 25mm dia.
Provdg. & fixing White / Color Vitreous china Counter
wash basin with signle hole for pillar tap of "Cera " -
Concord series of 550 x425 mm size to be fiited in stone
counter with necessary brackets painted white incl.
cutting holes and making good the same .Cost Includes
P/F C.P. brass waste coupline, 32 mm dia fisher union
mm dia. Pillar cock & Angle cock of " Ess Ess"- Trend
series ,32 mm dia. Waste pipe etc. complete as per
dir. of engg. in charge.
Providing and fixing washbasin with single holefor pillar tap
with C.I. or M.S. brackets painted white including sutting holes
and making goodthe same but excluding fittings.(A) Vitreous
China:(ii) Flat Back washbasin 550 mm x v400mm size. (i) In
157 5.00 Providing & Fixing S.S.304 Grade Sink of Nirali / 1525.42 No.
Krishna or Equivalent Make for Kitchen Platform of
size : 24":x18" as per Direction of engg. In charge
Providing and fixing C.P. brass towel rail comlete with
C.P.brass brackets fixed to wooden plugs with C.P.
brass scews.(B) 600mm x 20mm size.
Providing and fixing 600 mmx120 mm glass shelf with
C.P. brass bracket and guard rail complete mixed to
wooden plug with C.P.brass screws.
160 5.00 Providing and fixing toilet paper holder. (A) C.P.Brass 414.53 Each
Providing and fixing screw down bib taps of following size.
(A) Brass screw down bib tap polished bright.
5.00 (i) 15mm dia. 184.98 Each
5.00 (ii) 20mm dia. 212.68 Each
162 0.00 Providing and fixing screw down bib taps of following size.
(B) Brass chromium plated screws down Bib Tap.
5.00 (i) 15mm dia. 184.98 Each
5.00 (ii) 20mm dia. 212.68 Each
163 Providing and fixing screw down bib taps of following
size. © Gun metal screw down bib tap.
5.00 (i) 15mm dia. 157.29 Each
5.00 (ii) 20mm dia. 176.09 Each
164 0.00 Providing and fixing pillar tap, capstan head, screw
down high pressure with screws, shanks and back nuts.
5.00 (i) 15mm dia. 305.67 Each
5.00 (ii) 20mm dia. 351.18 Each
165 0.00 Providing and fixing Gun metal check or non-return
fullway wheel valve.
5.00 (i) 15mm dia. 184.98 Each
5.00 (ii) 20mm dia. 201.80 Each
5.00 (III) 25 MM DIA 416.47 Each
5.00 (E) 40mm dia 656.86 Each
Providing and fixing chromium plated brass half trun
flush cock of approved quality including fixing in pipe line etc.
5.00 (i) 20mm dia. 216.10 Each
5.00 (ii) 25mm dia. 223.73 Each
5.00 (iii) 32mm dia. 233.90 Each
Providing and fixing Urinal or approved quality
including conecting the Urinal with waste pipe , tap
etc.complete. (A) White earthen ware flat back or corner
type size 430mm x 260mm x 350mm.
Providing and fixing Urinal of approved quality
including connection with trap and with integral
longitudinal flush pipe. (A) Squating plate pattern
white earthen ware 550mm x 300mm.
Providing and fixing chromium plated, bottle trap with
necessary couplings of approved quality for wash basin.
170 5.00 Providing and fixing ball cock ofapproved quality as 131.57 Each
directed. (A) Copper Metal (i) 25mm dia.
171 5.00 Providing and fixing ball cock of approved quality as 101.89 Each
directed. (B)Abonite (i) 25mm dia.
Filling with good Quality thor as and where directed
by the Architect / Engineer-in-charge, in sunk in layers of
15 cm. thickness, including watering, ramming well etc.
complete, as directed by the Architect / Engineer-in-charge
Providing laying and jointing in true line and level 15 mm dia.
U.P.V.C. Pipe (SCH-40) for cold water including
fittings make PRINCE/ SUPREME/ ASTRAL/ FINOLEX or
equivalent as approved by Engineer In Charge. Pipe
shall be fixed on the wall with the help of clamp at every
two metre C/C or shall be concelled as directed
including necessary fittings etc. including testing of pipe
and joints and fixing the same with solvent, including cost
of all materials.adhesive
Providing laying and jointing in true line and level 25 mm dia.
U.P.V.C. Pipe (SCH-40) for cold water including
fittings make PRINCE/ SUPREME/ ASTRAL/ FINOLEX
orequivalent as approved by Engineer In Charge.
Pipe shall be fixed on the wall with the help of clamp at
every two metre C/C or shall be concelled as directed
including necessary fittings etc. including testing of pipe
and joints and fixing the same with adhesive solvent,
including cost of all materials.
Providing laying and jointing in true line and level 32 mm dia.
U.P.V.C. Pipe (SCH-40) for cold water including
fittings make PRINCE/ SUPREME/ ASTRAL/ FINOLEX or
equivalent as approved by Engineer In Charge. Pipe
shall be fixed on the wall with the help of clamp at every
two metre C/C or shall be concelled as directed
including necessary fittings etc. including testing of pipe
and joints and fixing the same with adhesive solvent,
including cost of all materials.
Providing laying and jointing in true line and level 40 mm dia.
U.P.V.C. Pipe (SCH-40) for cold water including
fittings make PRINCE/ SUPREME/ ASTRAL/ FINOLEX or
equivalent as approved by Engineer In Charge. Pipe
shall be fixed on the wall with the help of clamp at every
two metre C/C or shall be concelled as directed
including necessary fittings etc. including testing of pipe
and joints and fixing the same with adhesive solvent,
including cost of all materials.
Providing laying and jointing in true line and level 50 mm dia.
U.P.V.C. Pipe (SCH-40) for cold water including
fittings make PRINCE/ SUPREME/ ASTRAL/ FINOLEX or
equivalent as approved by Engineer In Charge. Pipe
shall be fixed on the wall with the help of clamp at every
two metre C/C or shall be concelled as directed
including necessary fittings etc. including testing of pipe
and joints and fixing the same with adhesive solvent,
including cost of all materials.
Providing in line level plumb, fabricating and fixing
three row horizontal barbed wire fencing and punched tape
concertina coil of 9 turns per meter of 610 mm dia fixed
with clips on top of the angle iron posts. The punched
tape concertina coil having sharp barbs at every 25 mm
spacing shall be 0.5 mm thick and 19 mm width and
weighting 13 kg/100 mt. (Average) as per manufacture's
specification. The rate shall also include providing
and fixing 1.20 mt.total long MS angle 40 x 40 x 6 mm
@3.00 mt.c/c spacing embaded in RCC column, angle
posts shall be painted with one coats of red oxide and two
coats of enamel paint of approved quality at top compound
178 3.00 Fixing sun film for protection sunlight in black or any colour as 850.00 Smt
as directd by engineer In Charge.(Market rate)
Providing & Fixing 3 mm thick F.R.P.sheet of Approved
Quality & Color / Pattern as per Consultant's design also
includes required fabrication structure in the grid of 2'-
0x2'-0 size using hollow pipe of16 gauge & size 2"x1" &
1"x1" ,G.I. & Bitumen Washers, Silicon paste application
for fixing the sheet . Rate also includesnecessary bending,
cutting, labor charges , Zinc Primer coat & Two coats of oil
painting of color as approved by consultants & making
good the wall. (N.S.)
180 40.00 Providing 2 mm thick F.R.P. Gutter with necessary M.S. 400.00 Rmt
Supporting Brackets. (N.S.)
Hiring charges for J.C.B.machine inclduing cost of fuel,
operator, dirver etc.. ( 8 hours sift day/night)
To provide tractor with hydraulic trolley, driver, 4 Nos. of
Labor with all tools like bucket drum, showels, trikam,
pavadas, etc,, to carryout different works during
monsoon for 12 Hrs. Shift. Work shall be carried out as
per the instrucitons of Engineer In-Charge.No extra charged
shall be paid for night shift.
Roller Blind Providing and fixing Roller Blind curtain
fixed on window level on wooden batten and curtain
lift with cotton thin rope, make of aerolax or
equivalent design and colour as per instruction by
engineer – in – Charge with necessary hardware fitting,
material and labour etc complete.
Providing & Fixing Door closer - complete of Approved make
to wooden / Aluminium Doors as per direction of engg. In
Providing and fixiing M.S. Fan clamps type 1 of 16 mm dia
M.S. bar bent to shape with hooked ends of R.C.C. slabs
during laying incl. painting the exposed protion of loops, all as
per standard design complete.
Providing cement vata (10cm. x 10 cm. size) quarter round in
cement mortar 1:1 including neat cement finishing, watering
187 1.00 Making Water connection from exi.Muni. Water line (N.S.) 250.00 No.
Providing and applying fibere reinforced cementitious
micro concrete work in cellings and beams
incl.mixture of CEMSCREED HM (F) fair mate
company material, FBR bonding agent material with
water in suItable proportion anti corrosive treatment on
exposed beam,celling steel bars with safeCore R incl.all
kind of labour etc.comp.including three coat of white
wash.(Approved Rate)
Providing and Fixing 1 H.P. Electrical monoblock or
submarcible water pumps withmotor and required cable and
switch board of approved brand and make etc.comp.as
.Providing TMT Bar FE 415 reinforcement for R.C.C. work
a including bending, binding and placing in position complete up
to floor two level (up to 10 ton)
ProvidingTMTBarFE500/500Dreinforcement for
R.C.C.workincluding bending,binding and placing in position
complete upto floor two level placing in position complete upto
floor two level placing in position complete upto floor two
level(upto 10 ton)
Providing and fixing 30mm thick solid both side prelam PVC
door shutter (sintex door-equivalent) with necessary
alluminium fitting with EL-7 section frame
Conveyance charge of Earth,Lime, Murrum, building rubbish
earch manure or sludge and excavated rock and fly
ash,aggregate of any kind etc.comp.upto 5 km lead.(L.S.)
Providing and laying polished granite stone slab 18 mm thick
in risers of steps, dedo and pllars laid on 10 mm thick cement
mortar 1:3 (1 cement:3 coarse sand) and jointed with gray
cement slurry including rubbing & polishing etc.complete.
Wall panelling with 12 mm MDF fixed to existing
alluminium framing and making grove as per design and
finished with royal plastic paint as per instruction of
engineer incharge. (N.S.)
Providing and laying 15mm bamboza wooden
flooring as per architect's drawing with all
necessary details as directed by the project
consultants. Use underlay for better result as per Detail
specifications and directed by the project consultants. (N.S.)
(Approved Rate )
Applying two coats of Birla (whitecementbased)
or Asian (acryliclapy-putty) or equivalent & two coats of
primer of approved brand and manufacture on new wall
surface to give an even shade including thoroughly brushing
the surface free from mortar dropping
Finishing wall with weather proof exterior emulsion paint on
wall surface (two coats) to
give an required shape evenshade after thoroughly brushing
the surface to remove all dirt, and remains of loose powdered
materials.etc complete
198 0.00 High Back Chairs for vip Lounge 6750.00 Each
:Supplying and installation of “Revolving High Back”
chairs. The chairs must be robust, ergonomically
designed and comfortable. Seat & Back
Assembly -1.2 cm thick hot pressed plywood and
upholstered with Fabric and Molded Polyurethane
Foam with PVC lining all around. Back foam is
designed with contoured lumber support for extra
comfort. Chairs Dimension - Width 55 cm, Depth 60 cm
Height 103 – 115.5 cm, Seat Height(SH) 44 – 56.5 cm.
The Polyurethane foam should be molded with density
45+/-2 kg/m3 & Hardness = 16+/-2
kg/m3onHampden machine at 25% compression. Arm
Rest - One-piece Black integral skin polyurethane with
50-70 shore. `D’ Type Handle and reinforced with MS
insert. Centre Pivot Mechanism - 360o revolving type
17o maximum tilt on pivot at centre Tilt tension adjustment.
Upright locking. Telescopic Bellow Assembly - The
bellow should be 3 piece telescopic type and injection molded
in black Polypropylene. Hydraulic Height Adjustment - The
Hydraulic height adjustment should be provided with
adjustment stroke of at least 10cms. Pedestal
Assembly - The pedestal should be injection molded
in Black powder coated MS on and fitted with 5 nos.
twin wheel castors. Twin wheel castors - The twin
wheel castors should be injection molded in Black
Nylon The complete item as per architect /engineer
Providing and supplying Medium Back Chair for
Control room MODEL LIKE HOF OCT
Revolving synchro tilting mechanism based chair
with gas lift for adjustable height and medium curved
back with seat and back PU molded cushion with MS pipe
frame structure and white foam layer for seat and molded
PU foam. White foam layer for back covered with thick
cloth and draped with cloth of approved shade. (min.
of Rs.150/meter). 5 legged revolving molded nylon
chair base with good quality of PU castors with 2 years
replacement guarantee. The chair to have wide polyurethane
arm rest of approved shape. Complete chair should be in
suitable shape. Rates to be inclusive of all taxes
and free delivery at site. The complete item as per
architect /engineer in charge
Providing and fixing storage, entire unit to be made from
19 mm th. and 12mm Ply with 1.0mm &. 8 mm th.
Laminate. Shelves to be made from 19mm Ply with both
side laminate. Rate shall include necessary approved
mortise locking systems, S S Handle pair 2" to 4"
height and necessary hardware. Over all storage to be
completed with necessary hard ware and accessories
completed as per drawing and design as given by
Existing storage repairing and veneer on top Providing
and fixing of Louvers On Existing d.c panel Providing and
fixing 35mmthk. Louvers shutter made up from
Ghanateak frame with 135x75mm and shutter frame as per
detail and fixing aluminum louvers which is
specified readymade powder coated aluminum grill
panel louvers .and applying melamine spray polish all
exposed wood work. Overall door to be completed with
necessary hardware and accessories completed as
per drawing and design as given by Engineer In
charge/Architect.
Providing and fixing flush door shutters, solid core
construction with frame of first class hardwood with cross
board and face veneer or plywood face panels, with both
side 1 mm laminate finishing including anodized
aluminum butt hinges with necessary screws.
Decorative type and pine wood core anodized minimum
3 no 150 mm long aluminum butt hinges in flush door
shutters with 2 no of brass holdfast 325 mm long 1 no
brass tower bolt 250 mm long and two no of 150 mm long
brass door handle . Decorative both side laminated
Flush door 35 mm thick. with frame of 10 cm x 7 cmt
Indian teak wood frame including all necessary fitting
fixtures hardware screw and adhesive etc fixing up to all
lead and lift height up to 45 mtr from GL etc complete as
per direction of engineer in charge
P/M/F chainlink jali 8'x4' size as per details sketch &
instructionof engineer in charge same as lal darwaja garden
pattern consisting of 3'dia. M.S black pipe 'A' class 5'4" ht.
fixed at 8'9" c/c in C.C 1:2:4 block of 9"x9"x9" size chain link
jali of size 2"x2"x10 gauge fixed in 35x35x5 mm MS angle
frame 8'x4' size with MS flat of size 25x3 mm welded jali
etc.comp.The jali is to be welded to MS pipe with MS flat as
instruction given.The M.S pipe and the M.S angle frame are
to be painted one coat of primer and two coats of paint as
directed in line and level. (N.S)
Providing & Fixing masonary wall with porbandar lachiya
stone with well dressed grooveas per directed by engg.in
charge for foundation, plinth or super structure level (above
plinth level upto floor two level) in cement mortar 1:5 (1-
cement : 5-fine sand) incl.pointing the joint with white cement
and yellow oxide powder in proportion to match stone colour
the joints should be thread grooved as per exi. lake stone
pitching apperance
1.00 (A) stone masonary wall/stone dressed single faced (size 8990.00 Cmt
1.05 (B) stone coping (size 15"x8"x4") 510.00 Rmt
1.00 (C) stone coping (size 15"x8"x9") 790.00 Rmt
1.00 (D) stone column (size 15"x15") 10710.00 Cmt
1.00 (E) stone column top (size 20"x20"x9") 685.00 No.
Supplying and fixing of 300 mm-L x 15 mm-B x 380 mm-H
Kerb block for Footpath in M-20 grade using 20 mm
nominal size black trap aggregate of Sevaliya/Timbaor
equivalent quality for pre-cast blocks,
reasonablyexposed finish/ formwork , mould
with well equippedwith vibratory system for kerb stones
of approved design including curing, etc. complete,
including thecost of formwork etc. complete. The rate
shall also include necessary cutting of asphalt,
fixing the Kerbstones in line and level on 5 cm thick
sand bedding withnecessary equipments and
materials. The rate shall also include the flush pointing in
CM (1:3) for all joints of thekerbstones. Filling of zari alone the
sides of the kerbstone fixed with Bituminous
concrete Bituminousconcrete / C.C. mixed in proper
position to flush withthe road surface as directed by
Engineer in change to form a portable mixture.a) Laying
on 5 cm thick Sand Bedding
Providing and Laying of Rubber Moulded Paver Block
Grey/Coloured 60 mm thick, M-35 Grade of any size shape
(Usually Uni-Paver Blocks) using black trap good quality
aggragate of 20 mm nominal size for footpath,parking areas,
service lanes and other areas as mentioned in the drawing /
instruction of engineer in charge. Cost includes formworks
using rubber mould, Rate providing and laying paver blocks
as per required grading and specification. The paver block
shall be mechanically compacted. The work of paving blocks
shall be executed in line and level by skill mason of flooring
work only. It should be laid in such a way that the no cutting of
the paver block to be necessary. if cutting of paver block
necessary then it should be cut by machine only and carting.
The finished surface of the paver block shall have resonably
good, plain finished. Paver blocks shall be compacted and
shall be relaid if necessary. Gravel or such type of materials
shall not be allowed for production. Laying on 5 cms thick
Provoding and fixing flush door shutters, solid core
construction with frame of first class hard wood with cross
board and face veneer or ply wood face panels, including
anodised alluminium butt hinges with necessary screws. (B)
Non- decorative type and block board core anodised
alluminium butt hinges in flush door shutters (2) 35 mm thick.
Labour work for fixing any kind of paving with cement pointing
in CM 1:2, including watering, ramming etc comp. as dir.For
208 5.00 I) Laying on Sand bedding as per requirement to fix the 78.00 Smt
C.C.Block / Nibhada Stone in Line & Level
Box type metal letters forming composite box made from
1mm thick stainless steel plate of grade 304 having brush
finish of following font size to be fixed at Main Gate in english
and or Gujrati and including fixing charges approved before
fixing by clent / consultant.
A 0.00 400mm high 1000.00 Nos.
B 0.00 300 mm high 750.00 Nos.
C 0.00 230 mm high 565.00 Nos.
210 0.00 Providing and fixing false ceiling at all height including 850.00 Smt
providing and fixing of frame work made of special sections,
power pressed from M.S. sheets and galvanized with zinc
coating of 120 gms/sqm (both side inclusive) as per IS :
and consisting of angle cleats of size 25 mm wide x 1.6 mm
thick with flanges of 27 mm and 37mm, at 1200 mm centre to
centre, one flange fixed to the ceiling with dash fastener
mm dia x 50mm long with 6mm dia bolts, other flange of cleat
fixed to the angle hangers of 25x10x0.50 mm of required
length with nuts & bolts of required size and other end of
angle hanger fixed with intermediate G.I. channels 45x15x0.9
mm running at the spacing of 1200 mm centre to centre, to
which the ceiling section 0.5 mm thick bottom wedge of
mm with tapered flanges of 26 mm each having lips of
mm, at 450 mm centre to centre, shall be fixed in a direction
perpendicular to G.I. intermediate channel with connecting
clips made out of 2.64 mm dia x 230 mm long G.I. wire at
every junction, including fixing perimeter channels 0.5 mm
thick 27 mm high having flanges of 20 mm and 30 mm long,
the perimeter of ceiling fixed to wall/partition with the help of
rawl plugs at 450 mm centre, with 25mm long dry wall screws
@ 230 mm interval, including fixing of gypsum board to ceiling
section and perimeter channel with the help of dry wall screws
of size 3.5 x 25 mm at 230 mm c/c, including jointing and
finishing to a flush finish of tapered and square edges of the
board with recomme-nded jointing compound , jointing tapes
finishing with jointing compound in 3 layers covering upto
mm on both sides of joint and two coats of primer suitable for
board, all as per manufacturer’s specification and also
including the cost of making openings for light fittings, grills,
diffusers, cutouts made with frame of perimeter channels
suitably fixed, all complete as per drawings, specification and
direction of the Engineer in Charge but excluding the cost of
Providing and fixing wall acoustical paneling using ecotone
Slato/ Anutone slato or equivalent Acoustic Panel make Slats
L-16 of size 128mmx2430mmx16mm thick up to 2400mm
high as per the following specification :-Slats L-16- 2mm
@16mm, 32 x 128 x 2430 mm high grade Pine wood base
Medium Density Fiber acoustic boards with Tongue & Groove
Edge,2mm slot perforation @ 16mm centre, slates
perforations, The acoustic should be furnished with a Black
absorbent felt backing with an airflow resistance of 330-
Ns/m³ (DIN 53887),wood practical core,NRC : should be Up
to 0.75,should meet the safety requirements of EN
Fixing :- Sound Strut CC18 screw fixed horizontal/vertical to
wall at every 600mm c/c. Metal cleat can be fixed on top
edges of Sound Strut CS55 fixed directly by stamping to the
CS55 and IC91 which is screw fixed directly to the wall where
ever required with a backing black color fabric as approved by
Architect and as specified including all accessories, material
& labor complete as directed by Architect / Engineer.
Providing & Fixing SPEED BUMP - #2 No (1 black, 1 yellow)
350 x 500 x 50 mm, Size per color End Cape 350 MM x
MM x 50 MM TOP DESIGN - Lining Top flat ANTI SKID
PATTERN FOR GRIP COLOUR :- YELLOW & BLACK
BODY MATERIAL :- MODIFIED THERMOPLASTICS
(Polymer Rubberized ) • ECO FRIENDLY RECYCLE
RUBBER Packing :- 4 pcs/ woven Bag Load Capacity :-
MT Fitting ( Fixing on TRAKE) :-4 holes & END CAPE :-
HOLE HEX Bolts with Washer Epoxy for Bolt Fitting etc.
complete as directed by EIC .
Providing & Fixing in position 24 MM exposed grid
suspension system with “P “ Grid profile false ceiling system
using 600 MM X 600 MM ecotone/anutone or equivalent
make Glass Fiber Ceiling Tiles having tegular edges &
NRC value and approved surface design (with NRC of 0.90)
and edge profile Tegular placed in a suspended grid of size
600 MM X 600 MM made from hot dipped GI Steel sections,
rotary stitched, main tee of size 24 X 42 X 3000 MM X
MM thickness suspended at every 600 MM c/c along length of
ceiling with 4 MM dia, Pre-straightened G.I.Wire with
necessary level adjusters & intermediate cross tees of size
X 38 X 600 MM X 0.40 MM thickness shall be inserted in to
slots between the main tees at 600 MM centers in direction
vertical to the main tees, where in the main tees are resting
on the periphery on wall angles of size 24 MM X 24 MM X
3000 MM X 0.40 MM thickness including providing necessary
openings for light fixtures, diffusers etc.
Providing and fixing of Roller blind curtain/blackout. The fabric
shall be woven from formulated platisol extruded over a
polyaster yarn.The fabric shouldl be weaved to provide subtle
view of the side of the blind and should offer elimination of
glare and sunlight radiance upto a minimum of 80%.The
fabric shall be flame retardant.
Providing and applying Texture Paint (Rustic Finish) on
external plastered surfaces, pattern as per sample approved
by the Architect. including preparing surface, using roller to
get approved texturised surface. Job to include making
required surface preparation, to receive Texture paint finish
etc. All complete as per detail drawing, as specified and as
directed by Architect / Consultant / Project - In - Charge. The
rates shall be inclusive of Scaffolding, all material, labour etc.
complete. as directed by EIC.
Providing and fixing PVC/Gpsysum plain colour false ceiling
with grid type with aluminium frame from gypsteel,
fastners ,props, Finishing as per architectural drawing
allowing openings for A.C. Diffusers,
Light/Electrical Points etc –complete, Prior to fixing on
frame.(Brand : Anutone or equivalent ) (N.S.) or as
directd by engineer In Charge.
Provdg. & laying S.W. Gully trap with brick masonry chamber
& water tight G.T.Stone including fixing of covervSquare
mouth trap 100 mm x100 mm size P-Trap
Providing cement vata (10cmx10cmsize) quarter roundin
cement mortar 1:1 including neat cement finishing, waterin
getc. complete.
Providing and laying (to level or slopes) and jointing with stiff
mixture of Cement Mortar in proportion 1:1 Salt glazed
stoneware pipes including testing of pipes and joints
complete.(A) 100mm dia.
Providing and laying (to level or slopes) and jointing with stiff
mixture of Cement Mortar in proportion 1:1 Salt glazed
stoneware pipes including testing of pipes and joints
complete.(B) 150mm dia.
Constructing brick masonry chamber for underground C.I.
Inspection chamber and bends with bricks having crushing
strength not less than 35Kg/Cm2 in C.M. 1:5 C.I. cover with
frame (Light duty) 455mm x 610mm intenal dimensions total
weight of cover with frame to be not less than 38Kg. (Wt. of
cover 23 Kg.) and Wt. of frame 15Kg. ) (R.C.C. top slabe with
1:2:4 mix (1-cement :2- coarse sand :4-graded stone
aggregate 20mm size) foundation concrete 1:5:10 inside
plaster 15mm thick with cement mortar 1:3 finished smooth
with a floating coat of neat cement on walls and bed concrete
etc. complete.(i) Inside dimensions 455mmx 610mm and
450mm deep for single pipe line.
Constructing brick masonry chamber for underground C.I.
Inspection chamber and bends with bricks having crushing
strength not less than 35Kg/Cm2 in C.M. 1:5 C.I. cover with
frame (Light duty) 455mm x 610mm intenal dimensions total
weight of cover with frame to be not less than 38Kg. (Wt. of
cover 23 Kg.) and Wt. of frame 15Kg. ) (R.C.C. top slabe with
1:2:4 mix (1-cement :2- coarse sand :4-graded stone
aggregate 20mm size) foundation concrete 1:5:10 inside
plaster 15mm thick with cement mortar 1:3 finished smooth
with a floating coat of neat cement on walls and bed concrete
etc. complete.(i)Inside dimensions 500mm x 700 mm and
450mm deep for pipe line
with one or two inlets.
Providing, supplying and fixing precast C.C. blocks (M-20)
edge kerb having size of 75 x 300 x 300 mm depth and as
per design conveying it to the site, jointing into C:M 1:3 and
racking out the joints incl. necessary excavation of asphalt,
soil etc..completed.
Constructing a cooking Sandwich platform 60 cm. width and
70 cm high resting on B.B.Masonry walls
23 cm.thick in C.M.(1:6) with (ii) Fixing black Granitee 30mm
thick laid on precast R.C.C. (1:2:4) slab with plastering on
exposed faces of wall in C.M. (1:4) etc complete.
Providing and fixing hard drawn steel wire fabric 75mm x
25mm mesh or weight not less than 7.75 kg. per Sq.M. to
window frames etc. including60 x 20mm beading of teak
Providing & fixing 15 cm wide chicken mesh jali with nails &
then application of 15 mm plaster on R.C.C.& masonary joints
as per dir.of engg.in charge
Providing and laying cement concrete flooring 1:2:4 (1-
cement : 2-coarse sand : 4-graded stone aggregate 20mm
nominal size) laid in one layer and finished with a floating coat
of neat cement. (A) 50mm thick.
Providing and constructing, Underground (U/G) water tank of
specified capacity, on specified location, for all depths, in
controlled CC of M-200 grade with bottom slab, top slab and
RCC walls, including cost of form work and reinforcement,with
inside and outside plaster in CM 1 :3 and water proofing
treatment as per IWP specification,including injection,
grouting, etc. complete. The rate includes for providing and
fixing two nos. 0.6m. x 0.6 m. size medium duty CI manhole
cover/s at top, including wash out pipe line and inlet and
outlet connections etc. complete.
229 1.00 Providing & Fixing of Armstrong Mineral Fibre Acoustical 1307.00 Smt
Suspended Ceiling System with Dune (Bevelled Tegular)
Edge Tiles With Armstrong 15mm Exposed GRID. The tiles
should have Humidity Resistance (RH) of 99%, NRC 0.5,
Light Reflectance ≥85%, Thermal Conductivity k = 0.052 -
0.057 w/m K, Colour White, Fire Performance UK Class 0 /
Class 1 (BS 476 pt - 6 &7) in module size of 600 x 600 x
15mm , suitable for Green Building application, with Recycled
content of 32%. The tile shall be laid on Armstrong Silhouette
profile grid system with 15mm white flanges incorporating a
6mm central reveal in white/black colour and with a web
height of 45mm and a load carrying capacity of minimum
15.68 Kgs/M2 & minimum pull out strength of 100 Kgs..
Silhouette, Main Runners & Cross Tees to have mitred ends
& “birdsmouth” notches to provide mitred cruciform junctions.
The T Sections have a Galvanizing of 90 grams per M2 and
need to be installed with Suspension system of Armstrong
make. Warranty Certificate and Test Reports for NRC, CAC
and Fire rating shall be provided by Vendor. Mineral Fibre
Acoustic Modular Ceiling Tile should be GREENPRO certified
and qualifies as GREEN PRODUCT certified by CII Green
Products and Services Council.INSTALLATION: To comprise
main runner spaced at 1200mm centres securely fixed to the
structural soffit using Armstrong suspension system
(specifications below) at 1200mm maximum centre. The
First/Last Armstrong suspension system at the end of each
main runner should not be greater than 450mm from the
adjacent wall. Flush fitting 1200mm long cross tees to be
interlocked between main runners at 600mm centre to form
1200 x 600 mm module. Cut cross tees longer than 600mm
require independent support. 600 x 600mm module to be
formed by fitting 600mm long flush fitting cross tees centrally
between the 1200 mm cross tees.Perimeter trim to be
Armstrong wall angles of size 3000x19x19mm, secured to
walls at 450 mm maximum centres. Installation should be
carried out as per Armstrong recommended
procedure.ARMSTRONG SUSPENSION SYSTEM
accessories manufactured and supplied by Armstrong World
Industries consisting of M6 Anchor Fasteners with Vertical
Hangers made of Galvanised steel of size 26 x 26 x 25 x
1.2mm with a Galvanised Thickness of 80gsm, A pre
Straightened Hanger wire of dia – 2.5 mm of 1.8 m length.,
thickness of 80gsm and a tensile strength of 344-413 MPa,
along with Adjustable hook clips of 0.8mm thick, galvanised
spring steel for 2.68 mm with a minimum pull strength of
kg. The adjustable clip also consists of a 3.5 mm aquiline wire
to be used with the main runner.
Providing and fixing PVC Printed pain colour false ceiling with
grid type with alluminium frame consisting of 600mm x
600mm 3mm thick plain PVC sheet used as panel insert in a
frame work made using anodized alluminium T section of size
1 x 1 (235 x 25mm, 19 gauge or 1 mm thick) in square pattern
of grid sizes of 2 x 2 (600 x 600mm) The alluminium frame
work is supported from the cceiling with the help of G.I. hook
and G.I. wire/6mm M.S. rods of required sizes to maintain
proper level etc. The aluminium frame work is supported on
side wall with the use of alluminium L section of size 1 x1 (25
x 25mm) angles etc. complete as per direction of Engineer in
charge. Manufactures specification and drawing.
Providing and supplying of labour for necessary manual
excavation, cleaning, Shifting of Material Or any other, or for
any other work as directed by Engineer In charge. The Rate
includes Handcart with Mazdoor
A 5.00 Mukadam/supervisior/karigar 348.00 No
B 10.00 Fitter/Plumber/Mason 697.00 No
C 10.00 WELDER/ Gas cutter at Day /night 689.00 No
Supplting of welding machine / gas cutter including cost of
welding rods/gas, Transportation, including carting from site
E 10.00 Mazdoor at Day Male/Female 328.00 No's
Supplying electric breaker machine for RCC slab or asphalt
demolishing work on site by using operator, fuel, power
supply etc.complete as directed. (no payment should be
allowed for non working condition of machinery and for pipe
line excavation and M.H. work. Allowed only for break down
work) (Based on Previously approved rate by CE sir )
CatchPit Jali Fixing P/F FRC catch pit jali with frame 600mm x
600mm clear opening etc. comp. As directed by engineer in
charge. (Based on Central Store Rate)
Providing and fixing concealed center point to wall ceiling &
floor CPVC (SDR 13.5) PIPE having National Sanitation
Foundation (NSF) seal for potable water of following dia.
nominal bore tube fittings and clamps including making good
the wall, ceiling and floor etc. complete.
A 1.00 15 MM DIA 165.21 Rmt
B 1.00 20 MM DIA 202.97 Rmt
C 1.00 25 MM DIA 247.25 Rmt
D 1.00 32 MM DIA 330.36 Rmt
E 1.00 40 MM DIA 437.66 Rmt
F 1.00 50 MM DIA 647.30 Rmt
Providing and fixing cast iron steps of size 500mm x 150mm x
22.5mm and painting with two coats of Anti-corrosive paint
Supplying and fixing C.I. cover 300mm x 300mm without
frame for Gulley trap (Standard pattern) te weight of cover to
be not less 4.53 Kg.)
Providing and fixing to wall ceiling and floor 10.0Kg.F/Cm2
working pressure polythene pipes of the following out
side Dia. Low densidy, complete with special falnge
compression type fittings, wall clips etc. including
making good the wall ceiling and floor.
Providing and fixing sheet glass, selected quality (Type-C)
bedded in putty and fixed with wooden beading including the
cost of wooden beadings of first class teakwood and
necessary cutting of glass. (2) 6 mm thick.
Providing and fixing rough cast wired glass, 6mm thick
bedded in putty and fixed with
wooden beading including the cost of wooden beadings of
Indian teak wood and necessary cutting of glass. (C) Wired -
Providing and supplying ISI marked only standard length
Stonewate pipes in standard lengths of following class and
diameter including all taxes,insurance, transportiton, fright
charges, octroi,inspection charges, loading, unloading,
conveyance to departmental stores, stacking etc. complete
Lowering, laying and jointing stone ware pipes of following
diameters with cement joints in C.M.1:1 proportion in proper
position , grade and alignment at all level as directed by
Engineer-in- charge including conveyance from stone to site
of work, Jointing material etc.comp.(GWSSB SOR 2021-22)
Constructing Chamber of following size including excavation,
refilling, BBCC (1:5:10) for foundation, C.C.Channel (1:2:4),
finished 15 mm thick cement plaster inside in CM 1:3,
finishing with cement slurry, Brick masonary in CM 1:5 &
excluding the cost of chamber seat cover etc..completed.
(Based on Drainage SOR 2009-10)
1.00 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 2261.60 No
0.90meter for pipe dia <=150 mm.
1.00 0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 2874.10 No
0.90meter for pipe dia <=20 mm.
1.00 0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 3905.35 No
meter for pipe dia <=20 mm
244 0.00 Making connection to the ex. M.H.in running sewer incl.
Dewatering and other required machinery etc. of following dia
pipes at any convenient time. All damaged work shall be well
repaired as per instructions. etc..complete. (Based on
Drainage SOR 2009-10)
5.00 a. 150 mm to 300 mm dia. 1339.28 No
5.00 b. 400 mm to 600 mm dia. 2232.14 No
Cutting the pipes of following dia coming in the new M.H.in
running sewer including cutting bars, including removing
debris /silt from the M.H. and carting at a suitable distance
etc..complete as directed. No payment for M.H. work will be
made until pipe is not cut completely in all respect. (Based on
Drainage SOR 2009-10)
246 0.00 Repairing damaged M.H. and rasing M.H. up to road level
incl. removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I.
steps and existing MH sheet cover, removing the debris
from MH and carting the same as directed. (Based on
Drainage SOR 2009-10)
0.00 (A) up to 0.15 mt. (@ Two Coarse) 732.14 No
0.00 (B) up to 0.35mt. (@ Four Coarse) 1160.71 No
0.00 (C) up to 0.65 mt. (@ Seven Coarse) 1794.64 No
0.00 (D) up to 0.90 mt. (@ Ten Coarse ) 2160.71 No
Repairing damaged I.C./ Raising removing damaged
brick work and repairing by brick masonry in C.M. 1:5 and
plaster in C.M. 1:3 and fixing C.I. steps and existing
chamber sheet cover, removing the debris from chamber and
carting the same as directed. (Based on Drainage SOR
RCC Precast M.H.Frame & Cover Manufacture , supply &
Delivery at store or at side of work Precast RCC M200 Frame
& Cover Suitable to drainage M.H. and as per type design &
Drawing including cost of reinforcement M.S. Angles or Flat
cutting mold work etc.(GWSSB SOR 2021-22)
0.00 Heavy Duty
0.00 Frame Suitable for 50 Cm opening of MH 1255.00 No.
0.00 Cover Suitable for 50Cm Opening Of MH 1314.00 No
0.00 Light Duty
0.00 Frame Suitable for 50 Cm opening of MH 1120.00 No.
0.00 Cover Suitable for 50Cm Opening Of MH 1194.00 No
0.00 House connection Chamber Light Duty
0.00 Frame 911.00 No.
0.00 Cover 1030.00 No
249 0.00 Washing and cleaning tub or channel of T.C rate 100.00 No.
incl.Transport of silt ,soil and debries etc from the site to
approved location, including loading,unloading,stacking as
directed etc.comp
250 1.00 Painting the kids picture chart & letter writting of different size 2500.00 per wall
and shapes as per details/design etc.comp. as dire. face
Boring holes 3.5 m deep in ordinary soil (for cast in situ piles)
and getting out the soil and disposal of the surplus excavated
soil as directed within a lead of 50 Meter for following
diameter of pipes.(iii) 300 mm
Extra for under reaming inside the bore Holes for under
reamed piles of following Diameter.(iii) 300 mm
252 1.00 S.S. Railing pipe 50 mm x 16 G ASIS 304 Grade 1004.24 Rmt
253 1.00 S.S. Railing pipe 16 mm x 16G ASIS 304 Grade 366.10 Rmt
254 1.00 Health Fauset Heavy duty with hook with fitting 576.27 No
255 1.00 Glass 2 mm to 3 mm thick 105.93 Smt
Total Amount Rs.
Total Amount Rs.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPALCORPORATION
WestZone,ZonalOffice",2ndFloor,A.M.Office,Dr.RamanbhaiPatelBhavan,Usma
npura,AhmedabadMunicipalCorporation,W.Z.Office,Ahmedabad-
380013.MunicipalCommissionerinvitesPercentageRatesealedtendersfrominterested
MEMORANDUM OF WORKS IN BRIEF
Requried Repairing And
Renivoation work of
Diff.Muncipal Buidling Work
1. Name of Work :- Under Of Ahmedabad Muncipal
Corporation At Nava Vadaj
Ward in West Zone.(ARC)
2. Tender Estimated Cost :- Rs:-
1% of the Tender Cost in the form of
3. Earnest Money :- Rs.25,000.00 (D.D. / Pay Order / Local Micr
4 Tender Fee Rs : Demand Draft of Rs.
6. Time-Limit : 12 months
7. Validity Period : 120 Days
8. (i) Last Date of Submission :
(ii) Mode of Sending : a) In Sealed cover in duplicate copies by
Registered Post A.D, or by Courier.or
b) Tender sent by ordinary post will be
rejected out right.
(iii) Description essential to : a) Name of work, Tender Notice No. &
be made on sealed cover Tender No.
b) Date of receiving tender by
(iv) Mode of quoting rates in :
The Price bid shall be submitted online only.
Schedule of Quantities and It shall not be submitted Physically.
9. Date of Opening : Dt. 18-07-2026 , 15:00 PM
10 Place of Submission & : Submission of EMD. Tender fee and other
Opening of Tender Documents during office hours: On date. 18-
07-2026 & 12:00 pm West Zone, 2nd Floor,
A.M. Office, Dr. Ramanbhai Patel Bhavan,
Usmanpura.Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013.
11 Penalty Due to Delay of work (1) Rs.1000/- per day (for tenders amounting upto
10 Lakhs), (2) Rs.2500 per day (for tenders
amounting above 10 Lakhs and upto 30 Lakhs), (3)
Rs.5000 per day (for all tenders amounting above
30 Lakhs) but not more then 10% of bill
12 Defect Liability : As per Tender Condition
Whenever a work is allotted by Engineering staff,
whether minor or major of part thereof of any
amount, the contractor shall be bound to start the
works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via
Whatsapp and through letter / E-mail shall be
considered legal and binding for the same. Failure
of comply to start the works in 48 hours of
Time permitted to start parts of intimation as above by contractor the contractor
work shall be levied penalty of (1) Rs.1000/- per day (for
tenders amounting upto 10 Lakhs), (2) Rs.2500 per
day (for tenders amounting above 10 Lakhs and
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders
amounting above 30 Lakhs). Three times failures by
contractor shall make contractor responsible to be
black listed unless and otherwise justified properly
in writing / binding within 15 days of last notice of
14 GST ftuLx[t¾xhlu «J<obtl GST yjd&e åþfJJtbtk ytJNu
Seal and Signature of the Bidder Add.City Engineer
Finance dept. circular No-10 Dt.05-08-2024
(A) Guarantee issued by following banks will be accepted as SD/EMD on permanent basis.
All nationalized Banks
(B) Guarantees issued by following banks will be accepted as SD/EMD for
the period up to March- 31, 2025. The validity cut-off date in the GR is
with respect to the date of issue of Bank Guarantee irrespective of the
date of termination of Bank Guarantee.
(I) Commercial Banks :-
1. A U Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Equitas Small Finance Bank
9. Federal Bank
14. IDFC First Bank
15. IndusInd Bank
16. Jana Small Finance Bank
17. Karnataka Bank
18. Karur Vysya Bank
19. Kotak Mahindra Bank
20. South Indian Bank
21. Tamilnadu Mercantile Bank
22. Utkarsh Small Finance Bank
(II) Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Kalupur Commerical Co-operative Bank Limited
3. Nutan nagrik Sahakari Bank Limited
4. Rajkot Nagarik Sahakari Bank Limited
5. Saraswat Co-operative Bank
6. SVC Co-operative Bank
7. The Cosmos co-opretive Bank
8. Baroda Gujarat Gramin Bank
9. Saurashtra Gramin Bank
10. The Gujarat State Co-Operative Bank
11. The Mehsana Urban Co-operative Bank Limited
12. The Surat District Co-operative Bank
13. The Surat Peoples Co-operative Bank
seal and Signature of the Bidder Addl City Engineer
AHMEDABADMUNICIPALCORPORATION
InvitationforBid(IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (here in after called“the
Employer”) invites sealed Tender document from reputed and qualified bidders
for the construction of Works detailed in the Table below:-
Sr. NameofWorks Approximate Earnest Completion
No value of works Money Period
. (Rs.) Deposit
1 Requried Repairing And Rs.25,00,000.00 Rs.25,000/- 12 Months
Renivoation work of
Diff.Muncipal Buidling Work
Under Of Ahmedabad Muncipal
Corporation At Nava Vadaj
Ward in West Zone.(ARC)
2. Interested bidders shall download the tender documents from AMC’s website
www.amcnprocure.com/www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be Rs. 1500.00 in the form
of Demand Draft/Pay Orderfromany NationalisedBank in favour
ofMUNICIPALCOMMISSIONER,Ahmedabad,payableatAhmedabad,whichshall
benonrefundable.
4. AllbidsmustbeaccompaniedbyEarnestMoneyDepositoftheamountspecifiedforthe
WorksintheaboveTablepayableatAhmedabadanddrawninfavourofMUNICIPALC
OMMISSIONER,Ahmedabad,payableatAhmedabad,.EarnestMoneyDepositwill
havetobespecifiedinClause2ofFinancialCondition.
5. Physical submission must be delivered to Asst. Manager (Admin) West Zone,
2ndFloor,Dr.RamanbhaiPatelBhavan,Usmanpura,AhmedabadMunicipalCo
rporation,W.Z.Office,Ahmedabad-380013.
TheBidswillbeopenedattheofficeofAddl.CityEngineer(W/Z),AhmedabadMunicipalCorporation,2nd
Floor,Dr.RamanbhaiPatelBhavan,Usmanpura,Ahmedabad MunicipalCorporation, W.Z.Office,
Ahmedabad-380013. in thepresenceof bidders or their representatives who choose to attend.In the
event of thespecifieddateofbid submission/opening being declared aholiday
fortheEmployer,thebidsshallbereceived/openedonthenextworkingdayatthesameplaceandthesametime
SPECIFICATIONS OF MATERIALS – CIVIL
This section gives detail specifications for mainly used materials, for other materials refer Building Specifications.
For materials relevant specification of Building Specification shall apply.
STANDARD DETAILED TECHNICAL SPECIFICATION OF ITEMS
NAME OF THE WORK :- Requried
Repairing And Renivoation
work of Diff.Muncipal Buidling Work Under Of
Ahmedabad Muncipal Corporation At Nava Vadaj Ward in
West Zone.(ARC)
Excavation for foundation upto 1.5 M depth including sorting out and stacking useful materials
disposing of the excavated stuff upto 50 meter lead in loose or soft soil.
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any
such ordinary excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall
under this category.
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone,
materials and rubbish of all kind, bush, wood and trees shall be removed as directed. The
materials so obtained shall be property of the Government and be conveyed and stacked as
directed. within 50 M. lead. The roots of the trees coming in the sides shall be cut and coated
with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor
shall assume full responsibility for alignment, elevation and dimension of each and all parts of the
work. Contractor shall supply laborers, materials, etc. required for setting out the reference
marks and bench marks and shall maintain them as long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width
and depth as shown in the drawings or as directed. The contractor shall do the necessary
shoring and shutting or providing necessary slopes to a safe angle, at his own-cost. The
payment for such precautionary measures shall be paid separately if not specified. The bottom of
the excavated area shall be 1 evened both longitudinally and transversely. as directed by
removing and watering as required. No earth filling will be allowed for bringing it to level, if
mistake or any other reason excavation is made. deeper or wider that shown on the plan or
directed. The extra depth or width shall be made up with concrete of same proportion as
specified for the foundation concrete at the cost of the contractor. The excavation up to 1.5 m.
depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling
the ground in layer including ramming and watering etc.
The balance of the excavated quantity shall be removed by the contractor from the site of work to
a place as directed with lead upped 50 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the
sections of trenches shown on the drawing or as per sections given by the Engineer-in-charge.
No payment shall be made for surplus excavation made in excess of above requirements or due
to slopping and sloping back as found necessary on account of conditions of soil , and
requirements of safety.
The rate shall be for a unit of one cubic meter.
Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and
stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(C)
The rate shall be for a unit of one cubic meter.
Filling available excavated earth in trenches, plinth, sides of foundation etc. incl. watering and
The earth obtained from excavation shall be filled in layers not exceeding 20 cms. in depth and
water thoroughly after each layer and shall be properly consolidated with rammers so that no
hollow voids remain there. In general the work shall be carried out in the best manner so that no
hollow voids remain after work. Workmanship in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
filling in plinth with sand under floors including watering, ramming consolidated and
dressing etc. complete.
Sand shall conform to M.
The sand to be used for filling shall be free from salts, organic or other foreign matter, All clods of
earth shall be broken.
As soon as the work in foundation has been completed and measured, the site of foundation
shall be cleared of all debris, brick bats, mortar dropping etc; and filled with sand in layers not
exceeding 20 Cms. Each layer shall be adequately watered rammed and consolidated before the
succeeding layer is laid. The sand shall be rammed with iron rammers where feasible and with
the butt ends of crow-bars, where rammer cannot be used.
The plinth shall be similarly filled with sand in layers not exceeding 20 Cms adequately watered
and consolidated by ramming with iron or wooden rammers. When nfilling reaches finished level,
the surface shall be flooded with water for at least 24 hours and allowed to dry and then rammed
and consolidated.
The finished level of filling shall be kept to shape intended to be given to floor.
In case of large heavy duty flooring like factory flooring, the consolidation may be done by power
rollers, where so specified. The extent of consolidation required shall also be as specified.
Mode of measurement and payment :
The payment shall be made for filling in plinth and trenches, No deduction shall be made
for shrinkage or voids if consolidated as instructed above
The rate includes cost of collecting carting sand with all lead and labour for filling the same in
plinth under floors.
The rate shall be for a unit of one cubic meter.
Filling in foundation and plinth with murrum or selected soil in layers of 20 cm. thickness including
watering, ramming and consolidating etc. Complete
Filling in foundation and plinth with murrum or selected soil shall be filled in layers not exceeding 20 cms. in depth and
water thoroughly after each layer and shall be properly consolidated with rammers so that no hollow voids remain
there. In general the work shall be carried out in the best manner so that no hollow voids remain after work.
Workmanship in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
Providing and laying cement concrete1:5:10 (1-Cement: 5-coarses sand and:10-hand broken stone aggregates 40mm
nominal size) and curing complete excluding cost of formworkin (A) Foundation and Plinth (upto 10 ton)
Providing and laying cement concrete1:4:8 (1-Cement: 4-coarses and:8-hand broken stone aggregates 40mm nominal
size) and curing complete excluding cost of formworkin (A) Foundation and Plinth (upto 10 ton)
Providing and laying cement concrete1:3:6(1-Cement:3-coarse sand:6-hand broken stone aggregates 40mm
nominalsize) and curing complete excluding cost of formworkin(A)Foundation and Plinth (upto 10 ton)
Providing and laying cement concrete 1:3:6 (1-Cement:3-coarse sand:6-hand broken stone aggregates 20mm nominal
size) and curing complete including cost of formwork in (A) wall caps/ coping (upto 10 ton)
Providing and laying cement concrete work 1:2:4 ((1-Cement:2-coarse sand:4-graded aggregates 20mm
nominal size) curing complete excluding cost of formwork and reinforcement ( up to {(a) to (c)}
Provdg. & laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregates 20 mm
nominal size) for reinforced concrete chhajjas not exceeding 10 cm. thickness upto floors two level
including finishing the exposed surfaces with cement mortar 1:3 (1 cement : 3 find sand) to give a smooth
and even surface centering and form work and curing complete excluding cost of reinforcement.
1.0 Materials: Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6, Grit shall
conform to M-8 Graded stone aggregate 20 mm nominal size shall conform to M-12.
2.1 The concrete mix is not required to be designed by preliminary tests. The proportion of the concrete mix
shall be 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 10 mm nominal size) by volume.
Concrete work shall have exposed concrete surface or as specified in the item.
2.2 The designation ordinary M-100, M-150, M-200, M-250 specified as per I.S Correspond approximately to
1:3:6, 1:2:4, 1 1/2 :3 and 1:1:2 nominal mix of ordinary concrete by volume respectively.
2.3 The ingredients required for ordinary concrete containing one beg of cement of 50 Kg. by weight (0.0342
Cu. M) for different proportions of mix shall be as under:
Grade of Total quantity of dry Proportion of fine Quantity of
concrete aggregate by volume aggregate to coarse water per
per 50 Kgs, of cement aggregate 50 Kgs. of
to be taken as the cement
sum of individual maximum.
volume of fine and
coarse aggregates,
M-100 (1:3:6) 300 Liters Generally 1:2 for fine 34 Liters
M-150 (1:2:4) 220 ” aggregate by volume but 32 “
M-200 (1:1 1/2 :3) 160 “ subject to and upper 30 “
M-250 (1:1:2) 100 “ limit of 1:1/2 and lower 27 “
2.4 The water cement ratios shall not more than those specified in the above table. The cement content of the
mix specified in the Table shall be increased if the quantity of water in a mix has to be increased to
overcome the difficulties of placement and compaction so that the water cement ratio specified in the Table
is not exceeded.
2.5 Work ability of the concrete shall be controlled by maintaining a water cement ratio that is bound to give a
concrete mix which is just sufficiently wet to be placed and compacted without difficulty with the means
2.6 the maximum size of coarse aggregate shall be as large as possible within the limits specified but in no case
greater than surround all reinforcement thoroughly and to fill the corners of the form.
2.7 For reinforced concrete work, coarse aggregates having a nominal size of 20mm are generally considered
2.8 For heavily reinforced concrete members as in the case of ribs of main beams the nominal maximum size of
coarse aggregate should usually be restricted to 5 mm less than the minimum clear distance between the
main bars, or 5 mm less than the minimum cover to the reinforcement whichever is smaller.
2.9 Where the reinforcement is widely spaced as in solid slabs, limitations of size of the aggregate may not be
important and the nominal maximum size may sometimes be as greater than the minimum cover.
2.10 Admixture may used in concrete only with approval of Engineer-in-charge based upon the evidence that
with the passage of time, neither the compressive strength of concrete is reduced nor are other requisite
qualities of concrete and steel impaired by the use of such admixtures.
3.0 Workmanship:
3.1 Proportioning: Proportioning shall be done by volume, except cement which shall be measured in terms of
bags of 50 Kg. weight. The volume of one such bag being taken as 0.0342 Cu. Meter. Boxes of suitable
sizes shall be used for measuring sand aggregate. The size of the boxes (internal) shall be 35 cms x
cms. and 40 cms deep. White measuring the aggregate and sand, the box shall be filled without shaking
ramming or hammering. The proportioning of sand shall be on the basis of its dry volume and in case of
damp sand, allowances for bulkage shall be made.
3.2.1 For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be kept
in first class working condition and so maintained throughout the construction. Measured quantity of
aggregate, sand, cement required for each batch shall be poured into the drum of the mechanical mixer
while it is continuously running. After about half a minute of dry mixing, measured quantity of water required
for each batch of concrete mix shall be added gradually and mixing continued for another one and half a
minute. Mixing shall be continued till materials are uniformly distributed and uniform color of the entire mass
is obtained and each individual particle of the coarse aggregate shows complete coating of mortar
containing its proportionate amount of cement. In no case shall the mixing be done for less than 2 minutes
after all ingredients have been put into the mixer.
3.2.2 When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain other reasons, it shall
be done on the smooth watertight platform large enough to allow efficient turning over the ingredients of
concrete before and after adding water. Mixing platform shall be so arranged that no foreign material gets
mixed with concrete nor does the mixing water flow out. Cement in required number of bags shall be placed
in a uniform layer on top of the measured quantity of fine and coarse aggregate, which shall also be spread
in a layer of uniform thickness on the mixing platform. Dry coarse and fine aggregate and cement shall then
be mixed thoroughly by turning over to get a mixture to uniform color. Specified quantity of water shall then
be added gradually through a rose-can and the mass turned over till a mix of required consistency is
obtained. In hand mixing quantity of cement shall be increased by 10 percent above that specified.
3.2.3 Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned before putting in a
new batch. Unless otherwise agreed to by the Engineer-in-charge the first batch of concrete from the
mixture shall contain only two thirds of normal quantity of coarse aggregate. Mixing plant shall be thoroughly
cleaned before changing from one type of cement to another.
3.3 Consistency :
3.3.1 The degree of consistency which shall depend upon the nature of the work and methods of vibration of
concrete, shall be determined by regular slump tests in accordance with I.S. 1199-1959. The slump of
10mm to 25mm. shall be adopted when vibrators are used and 80mm when vibrators are not used.
3.4 Inspection:
3.4.1 Contractor shall give the Engineer-in-charge due notice before placing any concrete in the forms to permit
him to inspect and accept the false work and forms as to their strength, alignment, and general fitness but
such inspection shall not relieve the contractor of his responsibility for the safety of men, machinery,
materials and for results obtained. Immediately before concreting, all forms shall be thoroughly cleaned.
3.4.2 Centering design and its erection shall be got approved from the Engineer-in-charge. One carpenter with
helper shall invariably be kept present throughout the period of concreting. Movement of labour and other
persons shall be totally prohibited for reinforcement laid in position. for access to different parts, suitable
mobile platforms shall be provided so that steel reinforcement in position is not disturbed. For ensuring
proper cover, mortar blocks of suitable size shall be provided so that steel reinforcement in position is not
disturbed. For ensuring proper cover, mortar blocks of suitable size shall be cast and tied to the
reinforcement. Timber kapachi or metal pieces shall not be used for this purpose.
3.5 Transporting and laying:
3.5.1 The method of transporting and placing concrete shall be as approved. Concrete shall be so transported
and placed that no contemination, segregation or loss of its constituent material takes place.
All form wok shall be cleaned and made free from standing water, dust, show or ice immediately before
placing of concrete.
No concrete shall be placed in any part of the structure until the approval of the Engineer-in-charge has
3.5.2 Concreting shall proceed continuously over the area between construction joints. Fresh concrete shall not
be placed against concrete which has been in position for more than 30 minutes unless a proper
construction joint is formed. Concrete shall compacted in its final position within 30 minutes of its discharge
from the mixer. Except where otherwise agreed to by the Engineer-in-charge concrete shall be deposited n
horizontal layers to a compacted depth of not more than 0.45 meter when internal vibrators are used and
not exceeding 0.30 meter in all other cases.
3.5.3 Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into place from a
height exceeding 2 meters. When trunking or chutes are used they shall be kept close and used in such a
way as to avoid segregation. When concreting has to be resumed on a surface which has hardened, it shall
be roughened, swept clean, thoroughly wetted and covered with a 13 mm thick layer of mortar composed of
cement and sand in the same ratio as in the concrete mix itself. This 13 mm layer of mortar shall be freshly
mixed and placed immediately before placing of new concrete. Where concrete has not fully hardened, all
laitance shall be removed by scrubbing the wet surface with wire or bristle brushes, care being taken to
avoid dislodgment of any particles of coarse aggregate. The surface shall then be thoroughly wetted, all free
water removed and then coated with neat cement grout. The first layer of concrete to be placed on this
surface shall not exceed 150 mm in thickness and shall be well rammed against old work particular attention
being given to corners and close spots.
3.5.4 All concrete shall be compacted to produce a dense homogeneous mass with the assistance of vibrators,
unless, otherwise permitted by the Engineer-in-charge for exceptional cases, such as concreting under
water, where vibrators cannot be used. Sufficient vibrators in serviceable condition shall be kept at site so
that spare equipment is always available in the event of breakdowns.
Concrete shall be judged to be compacted when the mortar fills the spaces between the coarse aggregate
and begins to cream up to form an even surface. Compaction shall be completed before the initial setting
starts i.e. within 30 minutes of addition of water to dry mixture. During compaction, it shall be observed that
needle vibrators are not applied on reinforcement which is likely to destroy the bond between concrete and
3.6 Curing: Immediately after compaction, concrete shall be protected from weather including rain, running
water, shocks, vibration, traffic, rapid temperature changes, frost and drying out process. It shall be covered
with wet sacking, hassain or other similar absorbant material approved, soon after the initial set and shall be
kept continuously wet for a period of not less than 14 days from the date of placement. Masonary work over
foundation concrete may be started after 48 hours of its laying but curing of concrete shall be continued for
a minimum period of 14 days.
3.7 Sampling and Testing of concrete:
3.7.1 Samples from fresh concrete shall be taken as per I.S. 1199-1959 and cubes shall be made, cured and
tested at 7 days or 28 days as per requirements in accordance with I.S. 516-1959. A random sampling
procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of being
tested i.e. the sampling should be spread over the entire period of concreting and cover all mixing units. The
minimum frequency of sampling of concrete of each grade shall be in accordance with following:
Quantity of concrete No. of Quantity of concrete in No. of samples
in the work samples the works
51 and above 4+ one additional for each additional 50 M. or part thereof.
NOTE : At least one sample shall be taken from each shift. Ten test specimens shall be made from each sample,
five for testing at 7 days and the remaining five at 28 days. The samples of concrete shall be taken on each
day of the concreting as per above frequency. The number of specimens may be suitably increased as
deemed necessary by the Engineer-in-charge when procedure of tests given above reveals a poor quality of
concrete and in other special cases.
3.7.2 The average strength of the group of cubes cast for each day shall not be less than the specified cube
strength of 150 Kg/Cm at 28 days. 20% of the cubes cast for each day may have value less than the
specified strength provided the lowest value is not less than 85% of the specified strength. If the concrete
made in accordance with the proportions given for a particular grade, does not yield the specified strength;
such concrete shall be classified as belonging to the appropriate lower grade. Concrete made in accordance
with the proportions given for a particular grade shall not, however, be placed in a higher grade on the
ground that the test strength are higher than the minimum specified.
3.8.1 The Engineer-in-charge shall be informed in advance by the contractor of his intention to strike the form
work. While fixing the time for removal of form work, due consideration shall be given to local conditions,
character for the structure, the weather and other condition that influence the setting of concrete and of the
materials used in the mix. In normal circumstances (generally where temperatures are above 20 C) and
where ordinary concrete is used, forms may be struck after expiry of periods specified in item No 9.1(A) for
respective item of form work.
3.8.2 All form work shall be removed without causing any shock or vibration as would damage the concrete.
Before the soffit and struts are removed, the concrete surface shall be exposed, where necessary in order to
ascertain that the concrete has sufficiently hardened. Centering shall be gradually and uniformly lowered in
such manner as to permit the concrete to take stresses due to its own weight uniformly and gradually.
Where internal metal ties are permitted, the or their removable parts shall be extracted without causing any
damage to the concrete and remaining holes filled with mortar. No permanently embedded metal part shall
have less than 25 mm cover to the finished concrete surface. Where it is intended to re-use the form work, it
shall be cleaned and made good to the satisfaction of the Engineer-in-charge. After removal of form work
and shuttering, the Executive Engineer shall inspect the work and satisfy by random checks that concrete
produced is of good quality.
3.8.3 Immediately after the removal of forms, all exposed bolts etc., passing through the cement concrete
member and used for shuttering or any other purpose shall be cut inside the cement concrete member to a
depth of at least 25 mm below the surface of the concrete and the resulting holes be filled by cement mortar.
All fine caused by form joints, all cavities produced by the removal of form ties and all other holes and
depressions honeycomb spots, broken edges or corners and other defects shall be thoroughly cleaned,
saturated with water and carefully pointed and rendered true with mortar of cement and fine aggregate
mixed in the proportions used in the grade of concrete that is being finished and of as dry consistency as is
possible to use. Considerable pressure shall be applied in filling and pointing to ensure thorough filling in all
voids. Surfaces which are pointed shall be kept most for a period of 25 hours.
If rock pockets/honeycombs in the opinion of the Engineer-in-charge are of such an extent or character as to
effect the strength of the structure materially or to endanger the life of the steel reinforcement, he may
declare the concrete defective and require the removal and replacement of the portion of the structure
4.0 Mode of measurement and payment:
4.1 The consolidated cubical contents of concrete work as specified in item shall be measured. The concrete
laid in excess of section shown on drawings or as directed shall not be measured. No deduction shall be
(a) Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purline trusses, corbels and steps
etc. up to 500 Sq. Cm. in section.
(b) Opening up to 0.1 Sq. M.
4.2 The rate includes cost of all materials, labour, tools and plant required for mixing, placing in position,
vibrating and compacting, finishing, as directed, curing and all other incidental expenses for producing
concrete of specified strength. The rate excludes the cost of form work.
4.3 The rate shall be for a unit of one cubic meter.
5.4.1 Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete
(A) Foundation footing, base of columns and mass (B) Slabs, landings, shelves, balconies, internals beams
girders and cantilever up to floor two level (C) Columns, pillars, posts and struts up to floor two level (D)
Staircase up to floor two level (E) Vertical and horizontal fins up to floor two level.
1.0 Materials & Workmanship
1.1 The relevant specification of item No. 5.3.13 shall be followed except that the work shall be carried out for
reinforced concrete work for work as specified in item 1.2. In addition, the following stipulations shall be
(a) The bars shall be kept in position by the following methods:
(i) In case of beam and slab construction, sufficient number of precast cover blocks in cement mortar 1:2 (1
cement : 2 coarse sand) about 4 cms x 4 cms section and of thickness equal to the specified cover shall be
placed between the bars and shuttering as to secure and maintain the requisite cover of concrete over the
In case of cantilevered or doubly reinforce beams of slabs, the main reinforcing bars shall be held in position
by introducing chain spacers or supports bars at 1.0 to 1.2 meters centers.
(ii) In case of columns walls, the vertical bars shall be kept in position by means of timber temphtes with slotes
accurately out in them. The temphtes shall be removed after concreting has been done below it. The bars
may also be suitably tied by means of annealed steel wires to the shuttering to maintain their position during
1.2 All bars projecting from pillars, columns beams, slabs etc., to which other bars and concrete are to be
attached or bounced to later on, shall be protected with a coat of thin neat cement grout, if the bars are not
likely to be incorporated with succeeding mass of concrete within the following 10 days. This coat of thin
neat cement shall be removed before concreting.
2.0 Mode of measurement and payment:
2.1 Relevant specifications of item No. 5.3.13 shall be followed.
2.2 The volume occupied by reinforcement shall not be deducted from R.C.C. work.
2.3 The rate shall be for a unit of one cubic meter.
Providing and laying in position Ready Mixed M-150 grade concrete for reinforced cement conctere work,
using cement content as per approved Design Mix manufactured in fully automatic batching plant and
transported to site of work intransit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of
R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing and
reinforcement including cost of admixtures in recommended proportions as per IS:9103 to accelerate/ retard
setting of concrete, improve work ability without impairing strength and durability as per direction of
theEngineer-in-charge. Without Fly Ash (Min cement level as per latest IS456 shall be maintained) (Cement
level 320 kg )The earth obtained from excavation shall be filled in layers not exceeding 20 cms. in depth and
water thoroughly after each layer and shall be properly consolidated with rammers so that no hollow voids
remain there. In general the work shall be carried out in the best manner so that no hollow voids remain after
work. Workmanship in general confirm to C –2.
Providing and laying in position Ready Mixed M-150 grade concrete for reinforced cement conctere work, using
cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site of
work intransit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of
specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying,
excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures in recommended
proportions as per IS:9103 to accelerate/ retard setting of concrete, improve work ability without impairing strength and
durability as per direction of theEngineer-in-charge. Without Fly Ash (Min cement level as per latest IS456 shall be
maintained) (Cement level 320 kg )The earth obtained from excavation shall be filled in layers not exceeding 20 cms.
in depth and water thoroughly after each layer and shall be properly consolidated with rammers so that no hollow
voids remain there. In general the work shall be carried out in the best manner so that no hollow voids remain after
work. Workmanship in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
Providing and laying in position Ready Mixed M-200 grade concrete for reinforced cement conctere work,
using cement content as per approved Design Mix manufactured in fully automatic batching plant and
transported to site of work intransit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement concrete work including pumping
of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing and
reinforcement including cost of admixtures in recommended proportions as per IS:9103 to accelerate/
retard setting of concrete, improve work ability without impairing strength and durability as per direction of
theEngineer-in-charge. Without Fly Ash (Min cement level as per latest IS456 shall be maintained) (Cement
Providing and laying in position Ready Mixed M-200 grade concrete for reinforced cement conctere work, using
cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site
of work intransit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of
specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying,
excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures in recommended
proportions as per IS:9103 to accelerate/ retard setting of concrete, improve work ability without impairing strength
and durability as per direction of theEngineer-in-charge. Without Fly Ash (Min cement level as per latest IS456 shall
be maintained) (Cement level 400 kg )
Mode of Measurement shall be on cubic meter basis.
Providing and laying in position Ready Mixed M-250 grade concrete for reinforced cement conctere work,
using cement content as per approved Design Mix manufactured in fully automatic batching plant and
transported to site of work intransit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement concrete work including pumping
of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing and
reinforcement including cost of admixtures in recommended proportions as per IS:9103 to accelerate/
retard setting of concrete, improve work ability without impairing strength and durability as per direction of
theEngineer-in-charge. Without Fly Ash (Min cement level as per latest IS456 shall be maintained) (Cement
Providing and laying in position Ready Mixed M-250 grade concrete for reinforced cement conctere work, using
cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site
of work intransit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of
specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying,
excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures in recommended
proportions as per IS:9103 to accelerate/ retard setting of concrete, improve work ability without impairing strength
and durability as per direction of theEngineer-in-charge. Without Fly Ash (Min cement level as per latest IS456 shall
be maintained) (Cement level 450 kg )
Mode of Measurement shall be on cubic meter basis.
Providing and laying in position Ready Mixed M-300 grade concrete for reinforced cement
conctere work , using cement content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of
laying, excluding the cost of centering shuttering finishing and reinforcement including
cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of
concrete, improve workability without impairing strength and durability as per
direction of the Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS
shall be maintained) (Cement level 475 kg )
Providing and laying in position Ready Mixed M-350 grade concrete for reinforced cement
conctere work , using cement content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of
laying, excluding the cost of centering shuttering finishing and reinforcement including
cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of
concrete, improve workability without impairing strength and durability as per
direction of the Engineer - in - charge. Without Fly Ash(Min cement level as per latest IS 456shall be
maintained) (Cement level 500 kg )
Materials & Workmanship :
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Grit shall conform to M-8.
Coarse aggregate shall conform M-12 B.
The proportioning of cement and aggregates shall be done by weight and necessary precautions shall be taken in
the production to ensure that the required work cube strength is attained and maintained. The controlled concrete
shall be in grades of M-100, M-150, M-200, M-250, M-300, M-350, M-400, with prefix controlled added to it. The
letter ‘M’ refers to mix and numbers specify 28 days works cube compressive strength of 150 mm cubes of the mix
expressed in Kg. / Cmt.
The proportion of cement, sand and coarse aggregates shall be determined by weight. the weight batch machine
shall be used for maintaining proper control over the proportion of aggregates as per mix design.
The strength requirements of different grades of concrete shall be as under:
Grade of Concrete Compressive strength of 15 cms 28 cubes in Kg./Cmt. at with I.S.
days conducted in accordance 516-1959
Preliminary test Work test
In all cases, the 28 days compressive strength specified in above table above be the criteria for acceptance or
rejection of the concrete
Where the strength of a concrete mix as indicated by tests, lies in between the strength of any two grades specified
in the above table such concrete shall be classified in for all purposes as concrete belonging to the lower of the two
grades between which its strength lies.
The proportions for ingredients chosen shall be such that concrete has adequate workability for conditions prevailing
on the work in question and can be properly compacted with means available except where it can be shown to the
satisfaction of the Engineer-in-charge, that the supply of properly graded aggregate of uniform quality can be
maintained till the completion of work. Grading of aggregate shall be controlled by obtaining the coarse aggregates,
in different sizes and being in them in the right proportions as required. Aggregate of different sizes shall be stocked
in separate stock piles. The required quantity of material shall be stock piled several hours, preferably a day before
use. The grading of coarse and fine aggregate shall be checked as frequently as possible, the frequency for a given
job being determined by the Engineer-in-charge to ensure that the suppliers are maintaining the uniform grading as
approved for samples used in the preliminary tests.
In proportioning concrete, the quantity of both cement and aggregate shall be determined by weight. Where the
weight of cement is determined by accepting the maker’s weight per bag a reasonable number of bags shall be
weighted separately to check the net weight. Water shall either be measured by volume in calibrated tanks or
weighed. All measuring equipments shall be maintained in clean and serviceable condition. Their accuracy shall be
periodically checked.
In is most important to keep the specified water cement ratio constant and at its correct value. To this end, moisture
content in both fine and coarse aggregates shall be determined by the Engineer-in-charge, according to the weather
conditions. The amount of mixing water shall then be adjusted to compensate for variations in the moisture content.
For the determination of moisture content in the aggregates, I.S. 2389(Part III) shall be referred to. Suitable
adjustments shall also be made in the weights of aggregates due to variation in their moisture content. Minimum
quantity of cement to be used in concrete shall not be less than 220 Kgs./M 3 in plain concrete and not less than
250 Kg/M3 in reinforced concrete.
Mode of measurement and payment:
The consolidated cubical contents of concrete work as specified in item shall be measured. The concrete laid in
excess of section shown on drawings or as directed shall not be measured. No deduction shall be made for –
Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purline trusses, corbels and steps etc. up
to 500 Sq. Cm. in section.
Opening up to 0.1 Sq. M.
The rate includes cost of all materials, labour, tools and plant required for mixing, placing in position, vibrating and
compacting, finishing, as directed, curing and all other incidental expenses for producing concrete of specified
strength. The rate excludes the cost of form work.
Providing and laying controlled cement concrete / Ready Mix Concrete of M-200 and curing
complete, excluding the cost of form work and reinforcement for reinforced concrete work in:
Providing and Laying ordinary cement concrete 1:2:4 (1-Cement 2-coarsesand: 4-graded stone aggregates
20 mm nominal size) and finishing smooth with curing etc. complete including the cost of form work but
excluding the cost of reinforsement for R.C.C work in (iv) Slabs having more than 13 cm and upto
Providing and Laying ordinary cement concrete 1:2:4 (1-Cement 2-coarsesand: 4-graded stone aggregates 20 mm
nominal size) and finishing smooth with curing etc. complete including the cost of form work but excluding the cost of
reinforsement for R.C.C work in (iv) Slabs having more than 13 cm and upto 15 cm.thickness
Mode of Measurement shall be on cubic meter basis.
Providing and Laying ordinary cement concrete 1:2:4 (1-Cement 2-coarsesand: 4-graded stone
aggregates 20 mm nominal size) and finishing smooth with curing etc. complete including the cost of
form work but excluding the cost of reinforsement for R.C.C work in (iv) Slabs having more than 8 cm
and upto 10 cm.thickness
Mode of Measurement shall be on cubic meter basis.
Item No. 16(A) :
Brick work using common burnt clay building bricks having crushing strength not less than 35kg./Sq.Cm.in
foundation and plinth in Cement Mortar1:6 (1- Cement :6 - fine sand) (B) Conventional (upto 10 ton)
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6. Brick
shall conform to M-15 Cement mortar shall conform to M-11.
The proportion of the cement mortar shall be 1:6 (1 cement : 5 fine sand) by volume.
Wetting of bricks:
The bricks required for masonry shall be thoroughly wetted with clean water for about two hours before
use or as directed. The cessation of bubbles, when the bricks are wetted with water is an indication of
through wetting of bricks.
Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not be used except
when necessary to complete to bond; closer in such case shall be cut to required size and used near the
A layer of mortar shall be spread on full width for suitable length of the lower course. Each brick shall first
be properly bedded and set home by gently tapping with handle of trowel or wooden mallet. It side face
shall be flushed with mortar before the next brick is laid and pressed against it. On copletion of course, the
vertical joints shall be fully filled form the top with mortar.
The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all vertical joint
shall be truly vertical. Vertical joints in alternate course shall generally be directly one over the other. The
thickness of brick course shall be kept uniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges, mason’s
sprit level, square half meter rub, and pins, string and plumb shall be kept on the site of work for frequent
checking during the progress of work.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All the connected
brick work shall be kept not more than one meter over the rest of the work. Where this is not possible, the
work shall be raked back according to bond (and not left toothed) at an angle not steeper than 45 degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to be built in
wall shall be embedded in cement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall not exceed
mm. The face joints shall be raked out as directed by taking tools daily during the progress of work, when
the mortar is still green so as to provide key for plaster or pointing to done.
The face of brick shall be cleaned the very day on which the brick work is laid and all mortar dropping
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces for a
period seven days. The top of masonry work shall be kept well wetted at the close of the day
Preparation of foundation bed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared of all loose
materials, cleaned and wetted before starting masonry. If masonry is to be laid on concrete footing, the top
of concrete shall be cleaned and moistened. The contractor shall obtain the engineer'’ approval for the
foundation bed, before foundation masonry is started. When puccas flooring is to be provided flush with
the top to plinth, the inside plinth offset shall be kept lower than the outside plinth top by the thickness of
Mode of measurements and payment:
The measurements of this item shall be taken for the brick masonry fully completed in foundation up to
plinth. The limiting dimensions not exceeding those shown on the plans or as directed shall be final.
Battered, tapered and curved portions shall be measured net.
No deduction shall be made from the quantity of brick work nor any extra payment made for embedding in
masonry or making holes in respect of following items:
Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where cross sectional area
does not exceed 500 Sq. cm.
Opening not exceeding 1000 Sq. cm.
Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does not exceed 10 Cms.
and the bearing does not extend to the full thickness of wall.
Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors, windows etc.
Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into masonry and pipes etc.
for concealed wiring.
Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make splaying of jambs,
throating and making Arches over the aperture be paid for separately.
The rate shall be for a unit of one cubic meter.
Brick work using common burnt clay building bricks having crushing strength not less
than 35kg./Sq.Cm.in foundation and plinth in Cement Mortar1:6 (1-Cement :6 - fine sand) B)
Extra for brickwork in super structure above plinth level upto floor two level (B) Conventional
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6. Brick shall conform
to M-15 Cement mortar shall conform to M-11.
The proportion of the cement mortar shall be 1:6 (1 cement : 5 fine sand) by volume.
Wetting of bricks:
The bricks required for masonry shall be thoroughly wetted with clean water for about two hours before use or as
directed. The cessation of bubbles, when the bricks are wetted with water is an indication of through wetting of
Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not be used except when
necessary to complete to bond; closer in such case shall be cut to required size and used near the ends of walls.
A layer of mortar shall be spread on full width for suitable length of the lower course. Each brick shall first be
properly bedded and set home by gently tapping with handle of trowel or wooden mallet. It side face shall be flushed
with mortar before the next brick is laid and pressed against it. On copletion of course, the vertical joints shall be
fully filled form the top with mortar.
The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all vertical joint shall be truly
vertical. Vertical joints in alternate course shall generally be directly one over the other. The thickness of brick
course shall be kept uniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges, mason’s sprit level,
square half meter rub, and pins, string and plumb shall be kept on the site of work for frequent checking during the
progress of work.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All the connected brick work
shall be kept not more than one meter over the rest of the work. Where this is not possible, the work shall be raked
back according to bond (and not left toothed) at an angle not steeper than 45 degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to be built in wall shall be
embedded in cement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall not exceed 12 mm. The face
joints shall be raked out as directed by taking tools daily during the progress of work, when the mortar is still green
so as to provide key for plaster or pointing to done.
The face of brick shall be cleaned the very day on which the brick work is laid and all mortar dropping removed.
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces for a period
seven days. The top of masonry work shall be kept well wetted at the close of the day
Preparation of foundation bed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared of all loose materials,
cleaned and wetted before starting masonry. If masonry is to be laid on concrete footing, the top of concrete shall be
cleaned and moistened. The contractor shall obtain the engineer'’ approval for the foundation bed, before foundation
masonry is started. When puccas flooring is to be provided flush with the top to plinth, the inside plinth offset shall be
kept lower than the outside plinth top by the thickness of the flooring.
Mode of measurements and payment:
The measurements of this item shall be taken for the brick masonry fully completed in foundation up to plinth. The
limiting dimensions not exceeding those shown on the plans or as directed shall be final. Battered, tapered and
curved portions shall be measured net.
No deduction shall be made from the quantity of brick work nor any extra payment made for embedding in masonry
or making holes in respect of following items:
Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where cross sectional area does not
exceed 500 Sq. cm.
Opening not exceeding 1000 Sq. cm.
Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does not exceed 10 Cms. and the
bearing does not extend to the full thickness of wall.
Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors, windows etc.
Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into masonry and pipes etc. for
concealed wiring.
Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make splaying of jambs, throating
and making Arches over the aperture be paid for separately.
The rate shall be for a unit of one cubic meter.
Half brick masonry in common brunt clay building bricks having crushing strength not less than
Kg/Sq.Cm. in Cement mortar 1:5 ( 1-Cement : 5 coarse sand ) in foundation and Plinth
conventional brickwork (up to 10 ton)
The rate shall be for a unit of Sq. Mt.
Extra for half brick masonry in super structure above plinth level upto floor two level (B) conventional
Materials: Brick shall conform to M-15. Water shall conform to M-1. Cement shall conform to M-3. Sand shall
conform to M-6. Cement mortar shall conform to M-11.
Relevant specifications of bricks, wetting and laying of bricks, joints, curing etc. shall conform to item No. 7 except
the brick work of half bricks shall be carried out.
Cement mortar used in masonry work shall be in proportion of 1 part of cement and 5 part of sand by volume.
All bricks shall be laid strecher wise, breaking joints with those in the upper and lower courses. The wall shall be
taken truly plumb. All courses shall be laid truly horizontal and all vertical joints shall be truly vertical. The bricks
shall be laid with frogs upwards. A set of masons tools shall be maintained on work as required for frequent
Mode of measurement and payment:
The half brick masonry work in foundation and plinth shall be measured under this item, the limiting dimensions shall
not exceed those shown in the plan or as directed. Any work done extra over the specified dimensions shall be
The relevant specifications of item No. 7 shall be followed. The length shall be measured nearest to one Cm.
The rate shall be for a unit of Sq. Mt.
Providing and laying Pre cast Light weight concrete hollow core wall with hollow core concrete unit of
approved make & size of 92 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/ 3300 mm
in legth made from of controlled cement concrete M20 having cube compressive strength not less than
MP a jointing with high strength & tensile adhesion non-shrink cementitious joint compound /P.U. Foam.
(Plaster not required)
Providing and laying Pre cast Light weight concrete hollow core wall with hollow core concrete unit of approved
make & size of 92 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/ 3300 mm in legth made
from of controlled cement concrete M20 having cube compressive strength not less than 20 MP a jointing with high
strength & tensile adhesion non-shrink cementitious joint compound /P.U. Foam. (Plaster not required)
The rate shall be for a unit of Sq. Mt.
Providing and laying Pre cast Light weight concrete hollow core wall with hollow core concrete unit of
approved make & size of 120 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/ 3300 mm
in legth made from of controlled cement concrete M20 having cube compressive strength not less than
20MP a jointing with high strength & tensile adhesion non-shrink cementitious joint compound/ P.U.Foam.
(Plaster not required)
Providing and laying Pre cast Light weight concrete hollow core wall with hollow core concrete unit of approved
make & size of 120 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/ 3300 mm in legth made
from of controlled cement concrete M20 having cube compressive strength not less than 20MP a jointing with high
strength & tensile adhesion non-shrink cementitious joint compound/ P.U.Foam. (Plaster not required)
The rate shall be for a unit of Sq. Mt.
Providing and laying Pre cast Regular concrete hollow core wall with hollow core concrete unit of approved
make & size of 92 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/ 3300 mm in legth
made from of controlled cement concrete M35 having cube compressive strength not less than 35 MP a
jointing with high strength & tensile adhesion non-shrink cementitious joint compound/ P.U.Foam. (Plaster
Providing and laying Pre cast Regular concrete hollow core wall with hollow core concrete unit of approved make &
size of 92 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/ 3300 mm in legth made from of
controlled cement concrete M35 having cube compressive strength not less than 35 MP a jointing with high strength
& tensile adhesion non-shrink cementitious joint compound/ P.U.Foam. (Plaster not required)
The rate shall be for a unit of Sq. Mt.
Providing and laying Precast Regular concrete hollow core wall with hollow core concrete unit of approved
make & size of 120 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/ 3300 mm in legth
made from of controlled cement concrete M35 having cube compressive strength not less than 35 MP a
jointing with high strength & tensile adhesion non-shrink cementitious joint compound /P.U.Foam. (Plaster
Providing and laying Precast Regular concrete hollow core wall with hollow core concrete unit of approved make &
size of 120 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/ 3300 mm in legth made from of
controlled cement concrete M35 having cube compressive strength not less than 35 MP a jointing with high strength
& tensile adhesion non-shrink cementitious joint compound /P.U.Foam. (Plaster not required)
The rate shall be for a unit of Sq. Mt.
Providing form work of ordinary timber planking so as to give a rough finish including centering shuttering,
strutting and propping etc. height of propping and centering below supporting floor to celling not exceeding
4 m. and removal of the same for in site reinforced concrete and plain concrete work in foundations,
footing, bases of columns, and mass concrete. ( up a to h)
The shuttering to be provided shall be of ordinary timber planks and shall conform to M-26.
The dimensions of scantlings and battens shall conform to the design. The strength of the wood shall not be less
than that assumed in the design.
The form work shall conform to the shape lines and dimension as shown on the plans and be so constructed as to
remain sufficiently rigid during the placing and compacting of the concrete. Adequate arrangements shall be made
by the contractor to safe guard against any settlement of the form work during the course of concreting and after
concreting. The form work of shuttering, centering, scaffolding bracing etc shall be as per design.
Cleaning & Treatment of forms:
All rubbish, particularly chippings shaving and saw dust shall be removed from the interior of the form before the
concrete is placed and the form work in contact with concrete shall be cleaned and thoroughly wetted or treated.
The surface shall be then coated with soap solution applied before concreting is done. Soap solution for the purpose
shall be prepared by dissolving yellow soap in water to get consistency of paint. Alternatively a coat of raw linseed
oil or form oil of approved manufacture may be applied in case steel shuttering is used. Soap solution or raw linseed
oil shall be applied after thoroughly cleaning the surface. Care shall be taken that the coating does not get on
construction joint surface and reinforcement bars.
Stripping time:
In normal circumstances and where ordinary cement is used forms may be struck after expiry of following periods:
Sides of walls columns and vertical faces of beam 24 to 48 hours.
Beams soffits (Props left under) 7 days.
Removal of props slabs
(i) Slabs spanning up to 4.5 m – 7 days (ii) Spanning over 4.5 mm 14 days
Removal of props to beams and arches
(i) Spanning up to 6 m – 14 days (ii) Spanning over 6 m 21 days
Procedure when removing the form work:
All form work shall be removed without such shock or vibration as would damage the reinforced concrete surface.
Before the soffits form work and struts are removed, the soffits and the concrete surface shall be exposed where
necessary in order to ascertain that the concrete has sufficiently hardened.
The centering to be provided shall be got approved. It shall be sufficiently strong to ensure absolute safely of the
form work and concrete work before, during and after pouring concrete. Watch should be kept to see that behavior
of centering and form work is satisfactory during concreting. Erection should also be such that it would allow removal
of forms in proper sequence without damaging either the concrete or the forms to be removed.
The props of centering shall be provided on firm foundation or base of sufficient strength to carry the loads without
any settlement.
The centering and form work shall be inspected and approved by the Engineer-in-charge before concreting. But this
will not relieve the contractor of his responsibility for strength, adequacy and safety of form work and centering. If
there is a failure of form work or centering, contractor shall be responsible for the damages to the work, injury to life
and damage to property.
All scaffolding, hoisting arrangements and ladders etc required for the facilitating of concreting shall be provided and
removed on completion work by contractor at his own expense. The scaffolding, hoisting arrangements and ladders
etc. shall be strong enough to with stand all live, dead and impact loads expected to act and shall be subject to the
approval of the Engineer-in-charge. However, contractor shall be solely responsible for the safety of the scaffolding,
hoisting arrangement, ladders, work and workman etc.
The scaffolding hoisting arrangements and ladders shall allow easy approach to the work spot and afford easy
The rate is applicable to all conditions of working and height up to 4 mts. The rate shall include the cost of materials
and labour for various operations involved such as:
Splayed edges, notching, allowance for overlaps and passing at angles, battens centering, shuttering propping,
bolting, nailing, wedging, easing, striking and removal.
Filleting to form stop chamfered edges or splayed external angles not exceeding 20 mm width to beams, columns
Temporary openings in the forms for pouring concrete, if required, removing rubbish etc.
Dressing with oil to prevent adhesion of concrete with shuttering, and
Raking or circular cutting.
Rate shall be paid in Sq.m
Providing and fixing 35 mm thick shutters for Doors, windows and clear story windows including anodised
alluminium butt hinges with necessary screws.
(A) Indian Teak Wood (ii) Fully Glazed. (upto 10 ton)
(B) Indian Teak Wood (iii) Partly panelled and partly glazed. (upto 10 ton)
(C) Indian Teak Wood (iii) Partly panelled and partly glazed.
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 35 mm thick shutters for Doors, windows and clear story windows including black
enamelled M.S.butt hinges with necessary screws..
(A) Indian teak wood. (i) Fully Panelled.(upto 10 ton)
(B) Indian teak wood. (ii) Fully Glazed.(upto 10 ton)
(C) Indian teak wood. (iii) Partly panelled and partly glazed. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 35 mm thick panelled, glazed or panelled and glazed shutters for Doors windows and
clear story windows including anodised alluminium But hinges with necessary screws and indian teak
wood shutters with.
(A) Plywood sheet panels. (upto 10 ton)
(B) Particle board panels (upto 10 ton)
(C) Hard board panels. (upto 10 ton)
(D) Asbestos sheet panels. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 25 mm thick shutters for cup boards etc. including black enamelled M.S. butt hinges
with necessary screws. (A) Indian teak wood. (i) Fully Panelled. (upto 10 ton)(a to b)
Providing and fixing 25 mm thick shutters for cup boards etc. including black enamelled M.S. butt hinges with
necessary screws. (A) Indian teak wood. (i) Fully Panelled. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing plain asbestos cement sheet 6 mm thick in partitions including fixing to fames with
screws etc, complete with 50 mm x 12 mm Deodar wood beading (Frames to be paid separately) (upto
Providing and fixing plain asbestos cement sheet 6 mm thick in partitions including fixing to fames with screws etc,
complete with 50 mm x 12 mm Deodar wood beading (Frames to be paid separately) (upto 10 ton)
Item should be executed as per site require ements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing in partitions 4 mm thick medium hard board of approved quality including fixing to
fames with screws etc complete with 50 mm x 12 mm teak wood beading (Frames to be paid separately)
Providing and fixing in partitions 4 mm thick medium hard board of approved quality including fixing to fames with
screws etc complete with 50 mm x 12 mm teak wood beading (Frames to be paid separately) (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
25 mm thick wooden shelves supported on 40 x 40 mm x 6 mm T or L iron brackets fixed at suitable
distances but not exceeding 75 cm. apart with Mango wood or equivalent quality. (upto 10 ton)
25 mm thick wooden shelves supported on 40 x 40 mm x 6 mm T or L iron brackets fixed at suitable distances but
not exceeding 75 cm. apart with Mango wood or equivalent quality. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
40 mm thick wooden shelves supported on 40 x 40mm x 6 mm T or L iron brackets fixed at suitable
distances not exceeding 75cm. Apart with Mango wood or equivalent quality. (upto 10 ton)
40 mm thick wooden shelves supported on 40 x 40mm x 6 mm T or L iron brackets fixed at suitable distances not
exceeding 75cm. Apart with Mango wood or equivalent quality. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing M.S. round or square bars with M.S. flats at required spacing in wooden frames of
windows and clerestory windows.(upto10 ton)
Providing and fixing M.S. round or square bars with M.S. flats at required spacing in wooden frames of windows and
clerestory windows.(upto10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Kg.
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S. flats at
required spacings and frame alround, square or round bars with round headed bolts and nuts or by screws
(A) Plain Grill. (upto 10 ton)
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S. flats at required
spacings and frame alround, square or round bars with round headed bolts and nuts or by screws (A) Plain Grill.
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Kg.
Providing and fixing glazed louvered glass windows and ventilators with teak wood frame 10 cm. x 7 cm.
size including 3 coats of oil painting to wood work etc.complete. (upto 10 ton)
Providing and fixing glazed louvered glass windows and ventilators with teak wood frame 10 cm. x 7 cm. size
including 3 coats of oil pa inting to wood work etc.complete. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing glazed louvered glass windows and ventilators with teak wood frame 10 cm.x7 cm. size
including 3 coats of oil painting to wood work etc.complete.with wooden louvers plank 12mm thick (upto
Providing and fixing glazed louvered glass windows and ventilators with teak wood frame 10 cm.x7 cm. size
including 3 coats of oil painting to wood work etc.complete.with wooden louvers plank 12mm thick (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 35 mm thick shutters for Doors, windows and clere story windows including Indian
teak wood frames 10 cm x 7 cm. size including anodized alluminium fixtures and fastenings including
primer coat of approved quality and two coats of oil painting etc, complete.(ii) Fully Panelled.
Providing and fixing 35 mm thick shutters for Doors, windows and clere story windows including Indian teak wood
frames 10 cm x 7 cm. size including anodized alluminium fixtures and fastenings including primer coat of approved
quality and two coats of oil painting etc, complete.(ii) Fully Panelled.
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 35 mm thick shutters for Doors, windows and clere story windows including Indian
teak wood frames 10 cm x 7 cm. size including black enamelled iron oxidixed fixtures and fastenings
including primer coat of approved quality and two coats of oil painting etc, complete.(ii) Fully Panelled.
Wood for shutter shall conform to M-29 (2) Anodised aluminium butt hinges shall conform to M-43.
Workmanship: The item covers the requirement of preparation of shutters for doors, windows, clerestory windows,
their supply and fixing.
Panelled shutters shall be constructed in the form of timber frame work of styles and rails with panel, inserted of type
as specified in the detailed drawings. Panel shall be fixed by providing grooves in the style and rails. The styles and
rails shall be joined to each other by mortise and tenon joints at right angles.
All members of the shutters shall be straight without any warp or how and shall have smooth, well planed faces at
right angles to angles to each other.
The size of styles and rails shall be as per drawing or as directed. Styles and rails of shutters shall be made of one
Timber paneling:
Thickness of the panel shall be as specified in the item as shown in the drawing or as directed. If the panel
is made from more than one piece, the pieces shall be finished as shown in the detailed drawings and shall be
joined with continuous groove with specified size. The end pieces of the panel and the top and bottom of the panel
shall be provided with continuous tongue to frame into groove of the frame shutter. An air space of 1.5 mm shall be
left in the groove of frame shutter while fixing the panels in it.
The faces of the panel as well as various pieces of the panel shall be closely fitted to the size of the grooves.
Finishing of the corners of raised panel edges shall be done as shown in drawings or as directed.
Fixtures & Fastenings:
The rate shall include anodised aluminium butt hinges including fixing with iron screws. The size and number of
hinges shall b as per table given in annexure-1.
Mode of measurements and payment:
The rate for shutter includes cost of providing block and clear for keeping the shutter in open position as
The dimension of the shutter shall be measured clear size of the shutter in close position between the
grooves of the frame.
The rate shall be for a unit of one sq. meter.
(A) (II)Providing and fixing 35 mm thick fully glazed shutters for doors, windowsand clerestory windows
including anodised aluminium butt hinges with necessary streces, Indian Teak Wood.
Materials: Teak wood shall conform to M-29. Glass shall conform to M-38. Anodised aluminium butt hinges shall
conform to M-43.
The relevant specifications of item No. 10.12(A) I shall be followed except that the 35 mm thick shutters fully
glazed for doors, windows and clerelstory windows including aluminium butt hinges with necessary screws.
The glass panels shall be embodied in putty and secured to the rebate by wooden beds or mouldings shape
and size as approved with counter sunk screws of suitable size.
The glass panel shall be properly cut to fit the rebates of the frames and sashes fully with a light minus
margin of about 1.5 mm on all sides. Before glazing the frame shall be primed and prepared for painting so that
wood may not draw oil out of putty.
The rebate shall be putted to an extent to provide bedding all round the glass.
The glass shall then be bedded in putty and fitted to frames with wooden beads or mouldings as directed
and secured with counter sunk screw. The screw shall be spaced not more than 10 mm form each corner and not
more than 200 mm apart.
The size of the rebate in the frame and size and shape of beads or moulding shall be as per detailed
drawings or as directed. The beds or mouldings shall have mitered corners.
Mode of measurement and payment:
The relevant specifications of item No. 10.12(A)(I) I shall be followed.
The rate shall be for a unit of one sq. meter.
A) (III)Providing and fixing 35 mm thick partly panelled and partly glazedshutters, or doors, windows
including anodized aluminium butt hinges with necessary screws, Indian teak wood.
Materials: Teak wood shall conform to M-29. Glass shall conform to M-38. Anodised aluminium butt hinges shall
conform to M-43.
Workmanship: The relevant specifications of item No. 10.12(A) (I) and 10.12(A)(II) shall be followed except that the
35 mm thick shutters shall be partly panelled and partly glazed for door windows, clerestory windows etc., as per
Mode of measurement and payment:
The relevant specifications of item No. 10.12(A)(I) shall be followed. Teak wood incl.Brass fixtures and S.S.Hingers
as approved by Engg.in charge.
The rate shall be for a unit one sq. meter.
Providing and fixing 30 mm thick FACTORY MADE SOLID PANEL PVC DOOR SHUTTER consisting of frame
made out of M.S.tubes of 19 gauge thickness and size of 19 mm x 19 mm for stiles and 15 mm x 15 mm for
to p and bottom rails. M.S. frames hall have a coat of steel primers of approved make and manufacture, M.S.
frames hall be covered with 5 mm thick heat moulded PVC ‘C’ channel of size 30 x 50 mm formings tiles,
and 5 mm thick 75 mm wide PVC sheets for to prail, lock rail and bottom rail on either side, and 10 mm (5
mm x 2) thick, 20 mm wide cross PVC sheet as gap insert for to p rail and bottom rail, Panelling of 5 stiles
and rails with 30 mm wide x 5 mm thick PVC sheet beading on eighter side, and joined together with
solventcement adhesive,. An additional 5 mm thick PVC strip of 20 mm width is to be stculkon the interiors
ide of the ‘c’ channel using PVC solventcement adhesive etc. complete as per direction of Engineer
incharge, manufacture’s specification and drawing.
PVC doors shall be provided with EZ-7 section doorframe as mentioned in the item description. The size of the door
shall be as per the drawing. The overall thickness of PVC doors shall be 24 mm. The aluminium fixtures and
fastenings shall be fixed to the shutters as directed by the engineer-in-charge.
The doors shall be of Sintex or any other approved make.
The holes for the hardware to be fitted shall be marked first on the door (for hinges, handle, tower bolt, aldrop etc.);
pilot holes of 3 mm shall be pre-drilled and then hinges is to be fitted on door. Screws shall not hammered on the
door but fastened by hand/electric screw driver.
Mode of measurement:
The rates of the PVC doors shall be on the basis of area in sq.mt. of PVC doors procured and fixed by the
contractor. No separate payment for the aluminum fixtures and fastenings shall be payable.
Providing and fixing in position collapsible shutters with vertical channels 20 x 10 x 2 mm braced with flat
iron diagonal 20 x 6 mm size with top and bottom rails T iron 40 x 40 x 6 mm with 38 mm dia steel pulleys
complete with bolts, units, locking arrangements, stoppers, handles, including a priming coat of red lead
paint & approved make.
Materials: The collapsible steel gate shall conform to M-33.
T-rails shall be fixed to the floor and to the lintel at top by means of anchor bolts, embedded in cement concrete on
floor and lintel. The anchor bolts shall be placed approximately at 45 mm centers alternatively in the two flanges of
the T iron. In the bottom runner (T-iron) shall be embedded in the floor and proper groove shall be formed along the
runner for the purpose. The collapsible gate shall be fixed at the sites by fixing the end double channels in the T-Iron
rail and also by hold fasts bolted to the end double channel and fixed in the masonry of the side walls or the
In case where the collapsible gate is not required to the lintel beams or slop above, a tee iron suitably
designed may be fixed at the top embedded in masonry and provided with necessary clamps and roller arrangement
All the adjoining work damaged while fixing of gate shall be made good to match the existing work without
any extra payment.
All the members of the collapsible gate including T-Iron shall be thoroughly cleaned of rust, scales, dust etc.
and given a priming coat of red lead before fixing them in position.
Mode of measurements and payment:
The collapsible gate shall be measured in sq. meter. The height of the gate shall be measured as the length
of double channels and breadth from outside to outside of the end fixed double channels in open position of the
gate. The rate includes providing handles, locking arrangements, stoppers etc.
The rate shall be for unit of one sq. meter.
Providing and fixing 1 mm thick M.S. sheet sliding shutters with frame and diagonal braces of 40x40x6 mm
angle iron, 3.15 mm M.S.gusset plates at Junctions and corners 25 mm dia. pulley, 40x40x6 mm angle and
T-iron huide rail at top and bottom respactively with handles, stoppers and locking agangement etc,
including applying a priming coat of red lead paint. (upto 10 ton)
Providing and fixing 1 mm thick M.S. sheet sliding shutters with frame and diagonal braces of 40x40x6 mm
angle iron, 3.15 mm M.S.gusset plates at Junctions and corners 25 mm dia. pulley, 40x40x6 mm angle and T-iron
huide rail at top and bottom respactively with handles, stoppers and locking agangement etc, including applying a
priming coat of red lead paint. (upto 10 ton)
Item should be executed as per site conditions and instructions given by Engg-In-Charge.
The rate shall be for unit of one sq. meter.
Providing and fixing rolling shutters of approved make made of 80 mm wide M.S.laths inter-locked
together through their entire length and jointed together at theends by end locks mounted on specially
designed pipe shaft with bracket plates, guide channels and arragements for inside and out side locking
with push-pull operation including the cost of hood cover and spring etc. complete. (A) Shutters having
width below 3.5 M.
Providing and fixing rolling shutters of approved make made of 80 mm wide M.S.laths inter-locked together
through their entire length and jointed together at theends by end locks mounted on specially designed pipe shaft
with bracket plates, guide channels and arragements for inside and out side locking with push-pull operation
including the cost of hood cover and spring etc. complete. (A) Shutters having width below 3.5 M.
Item should be executed as per site conditions and instructions given by Engg-In-Charge.
The rate shall be for unit of one sq. meter.
Providing & Fixing in position Alluminium doors with frame using approved quality anodised extruded
alluminium section as approved by Engg.in charge(Jindal alluminium)(a) Frame sections 101.6x44.45 mm
(b) Shutter bottom vertical & top section 83.5x44.45 (wt.1.31 kg/mt.)(at 1.31 kg/mt) (c) Shutter bottom section
at 114.3x44.45 mm at (1.37 kg/mt) Shutter middle section at 100x44.3 wt.(1.37 kg/mt) incl.providing &
installing 5 mm thick approved color Acrylic sheet of standard quality fixed with glazing chips on upper
pannel & Laminated sheet on lower pannel (wtt.0.13 kg/Rmt) etc.comp.as direction of engg.in charge
Metalic Color Anodized Aluminum alloy used in the manufacture of extruded sections for the fabrication of
doors, windows, ventilators shall confirm to designation HE9-WP of IS:733.
Transparent sheet glass shall confirm to the requirements of IS:2835. Wired and figured glass shall be as
per IS:5437. Builder's hardware of fittings & fixtures shall be of the best quality from approved manufacturers.
All aluminum doors, windows, ventilators and partitions shall be of the type and size as specified. The doors,
windows, ventilators shall confirm to the requirements of IS: 1948. Aluminum windows, shall confirm to IS: 1949, if
so specified. All aluminum units shall be supplied with Metallic color anodized finish. The minimum anodic film
thickness shall be 0.015 mm. Doors, windows and ventilators shall be of an approved manufacture. Fabrication of
the units shall be with the extruded sections, cut to correct lengths, mitred and welded at the corners to a true right
angle conforming to the requirements of IS: 1948. Tolerance in overall dimensions shall be within ± 1.5mm. The
frames and shutters shall be free from warp or buckle and shall be square and truly plane. Punching of holes, slots
and other provisions to install fittings or fixtures later shall be made at the correct locations, as per the requirements.
Aluminium swing type doors, aluminum sliding windows, partitions shall be as specified. IS: 1948 and IS: 1949 shall
be referred to incorporates the sizes, shapes, thickness and weight per running meter of extruded sections for the
various components of the units. However, new sizes, shapes, thickness with modifications to suit snap-fit glazing
clips etc. are being continuously being added by various leading manufacturers of extruded sections, which are
available in the market. As such, the sections of the various components of the unit proposed by the Contractor, will
be reviewed by the GSDWICL and will be accepted only if they are equal to or marginally more than that given in the
codes/as specified.
Specific provisions as stipulated for steel doors, windows, and ventilators under related clause shall also be
applicable for this item work. Glazing beads shall be of the snap-fit type suitable for the thickness of glazing
proposed as indicated in the items of works prepared by the Contractor. A layer of clear transparent lacquer shall
be applied on Aluminium sections to protect them from damage during installation. This lacquer coating shall be
removed after the installation is completed.
Mode of measurement
Measurement will be given on the Square meter basis of actual area of the Aluminum section.
Providing and fixing extruded aluminum window having extruded aluminum Colour Powder
Coatedsectionframemainoutersize127mmx38.10mmx1.35mm(ofJindalSectionno:2443,@Wt.1.384Kg/mt),hori
zontal Four track member size122.20mm x31.75mm x1.10mm (ofJinda lSection no:8787,@ Wt.1.205Kg/ mt)
,vertical member of size122.20mm x31.75 mm x1.50 mm (ofJindal Section no:8935,@Wt.1.398Kg/mt) with
sliding shutters of horizontal member size 40mmx18mmx1.29 mm(ofJindal Section no:8949 @wt.of0.456
Kg/mt), vertical member of size 40mmx18mmx 1.29mm(ofJindal Section no:8947 @wt.of0.456Kg /mt/Section
8948,@Wt.0.457Kg/mt) with 5mmt hick transparent bronze colour tinted float glass with powder coated
aluminum fittings and fixturesandtransparentsiliconsealantglassfixingtoframeasperdetailsetccompletefor
Providing and fixing extruded aluminum window having extruded aluminum Colour Powder Coated section
frame main outer size127mmx38.10mmx1.35mm(ofJindalSectionno:2443,@Wt.1.384Kg/mt),horizontal Four track
member size122.20mm x31.75mm x1.10mm (ofJinda lSection no:8787,@ Wt.1.205Kg/ mt) ,vertical member of
size122.20mm x31.75 mm x1.50 mm (ofJindal Section no:8935,@Wt.1.398Kg/mt) with sliding shutters of horizontal
member size 40mmx18mmx1.29 mm(ofJindal Section no:8949 @wt.of0.456 Kg/mt), vertical member of size
40mmx18mmx 1.29mm(ofJindal Section no:8947 @wt.of0.456Kg /mt/Section 8948,@Wt.0.457Kg/mt) with 5mmt
hick transparent bronze colour tinted float glass with powder coated aluminum fittings and
fixturesandtransparentsiliconsealantglassfixingtoframeasperdetailsetccompletefor
Mode of measurement
Measurement will be given on the Square meter basis of actual area of the Aluminum section.
Providing & Fixing in position Alluminium vents with frame using approved anodised extruded alluminium
section as approved by Engg.in charge.(Jindal alluminium) units equivalent (Approved Rate) Frame section
of 63.50 x 38.50 mm (wt.0.68 Kg/Rmt) incl.Providing & Installing 5 mm thick approved color Acrylic sheet of
standard quality etc.comp.
Providing & Fixing in position Alluminium vents with frame using approved anodised extruded alluminium
section as approved by Engg.in charge.(Jindal alluminium) units equivalent (Approved Rate) Frame section of
x 38.50 mm (wt.0.68 Kg/Rmt) incl.Providing & Installing 5 mm thick approved color Acrylic sheet of standard quality
Mode of measurement
Measurement will be given on the Smt. basis of actual area of the Aluminum section.
Providing and fixing standared extruded of alluminium section of size 63 mmx38.10 mmx1.2 mm (Jindal
Section:2434, @ Wt.0.643 Kg/mt) with colour anodized alluminium frame for ventilation with 5 mm thick
frosted glass as details etc complete for Ventilation
Providing and fixing standared extruded of alluminium section of size 63 mmx38.10 mmx1.2 mm (Jindal
Section:2434, @ Wt.0.643 Kg/mt) with colour anodized alluminium frame for ventilation with 5 mm thick frosted
glass as details etc complete for Ventilation
ITEM SHALL BE EXTUCUTED AS PER INSTRUCTION GIVEN BY ENGG. INCHARGE.
ITEM SHALL BE PAID IN SMT
Providing and fixing standared extruded of alluminium section of size 63.50 x 38.10 x 1.95mm,@ Wt 1.094Kg
/ Rmt with colour Powder Coated alluminium frame with 5 mm thick transparent bronze colour tinted float
glass as details etc complete for Fix Partition
ITEM SHALL BE EXTUCUTED AS PER INSTRUCTION GIVEN BY ENGG. INCHARGE.
ITEM SHALL BE PAID IN SMT
Providing and laying 40 mm thick marble chips flooring rubbed and polished (I.E.terrazo) to granolithic
finish with under layer 30 mm thick cement concrete1:2:4 (1-Cement: 2-coarse sand: 4-graded stone
aggregate 10 mm and down gauge) and to player 10 mm thick with white, black or white and blak marble
cihps of required sizes from 1 mm to 4 mm nominal size laid in cement marble powder mix 3:1 (3-Cement:1-
Marble powder by weight) in proportion of 4:7 (4-Cement: 7-marble chips by volume) (C) Medium Shade
pigment with approx 50% white cement and 50% ordinary cement (In top layer only) (upto 10 ton)
Providing and laying 40 mm thick marble chips flooring rubbed and polished (I.E.terrazo) to granolithic finish
with under layer 30 mm thick cement concrete1:2:4 (1-Cement: 2-coarse sand: 4-graded stone aggregate 10 mm
and down gauge) and to player 10 mm thick with white, black or white and blak marble cihps of required sizes from
1 mm to 4 mm nominal size laid in cement marble powder mix 3:1 (3-Cement:1-Marble powder by weight) in
proportion of 4:7 (4-Cement: 7-marble chips by volume) (C) Medium Shade pigment with approx 50% white cement
and 50% ordinary cement (In top layer only) (upto 10 ton)
Item should be executed as per site conditions and instructions given by Engg-In-Charge.
The rate shall be for a unit Sq.m.
Providing and laying marble chips skirting (Terrazo) or dedo rubbed, and polished to Granolithic finish to
player 6 mm white, black or white and black marble chips of size from smallest to 4 mm nominal size laid in
cement marble powder mix 3:1 (3-Cement: 1 marble powder by weight) in proportion of 4:7 (4-cement
marble powder mix: 7-marble chips by volume) 20 mm thick with under 14 mm thick layer cement plaster 1:3
(1-cement: 3-coarse sand) (C) Medium shade pigment with appox 50% white cement and 50% ordinary
cement (In top layer only) (upto 10 ton)
Providing and laying marble chips skirting (Terrazo) or dedo rubbed, and polished to Granolithic finish to
player 6 mm white, black or white and black marble chips of size from smallest to 4 mm nominal size laid in cement
marble powder mix 3:1 (3-Cement: 1 marble powder by weight) in proportion of 4:7 (4-cement marble powder mix:
7-marble chips by volume) 20 mm thick with under 14 mm thick layer cement plaster 1:3 (1-cement: 3-coarse sand)
(C) Medium shade pigment with appox 50% white cement and 50% ordinary cement (In top layer only) (upto 10 ton)
Item should be executed as per site conditions and instructions given by Engg-In-Charge.
The rate shall be for a unit Sq.m.
Providing and laying white glazed tiles 6 mm thick in flooring treads of steps and landing laid on a bed of
mm thick cement mortar 1:3 (1- cement:3-coarses and) finishing with flush pointing in white cement. (upto
Workmanship : The work shall be carried out for skirting as dedo. Before fixing glazed tiles of shade and size as specified,
the surface shall be prepared by heavy scarping, making joints etc. to the required line, level and plumb. The surface shall be
thoroughly wetted before commencing the laying work. Thereafter about 10 mm. thick backing of cement mortar in specified
proportion shall be applied on the surface in true like and level generally as per specifications of plaster item.
Fixing : The black of each tile to be fixed shall be smeared with cement paste of matching colour and the glazed tiles shall
then be gently tapped against the surface, with a wooden mallet. The skirting shall be done only after the flooring is competed.
Any pipes coming out of the wall through the dedo or skirting shall only beat at the intersections of the horizontal and vertical
joints. The tiles shall not have staggered joints. The joints shall be true to entire line both ways and vertical joints shall be in
line with joints of flooring. Tiles shall be fixed as close as possible to the adjoining tiles and any difference in the thickness of
the glazed tiles shall be evened out in the cement paste so that all the tiles faces are set in conformly with one another. The
skirting shall project uniformly and not more than 6 mm. thickness beyond the finished surface above. Top of skirting of dedo
shall be truly horizontal. The rises of steps, skirting or dedo shall rest on top of treads of flooring wherever required. The tiles
shall be cut (sawn) and thin edges smoothened before use.
Curing : Curing shall be done for 7 days continuously.
Finishing : Skirting and dedo shall be hand polished to have an even smooth and shining surface. In case of skirting only
mm. x 10 mm. grove shall be provided at the junction of cement plaster and cement tilesThe white glazed tiles shall be laid on
cement mortar bedding of 12 mm thick in C.M. 1 :3 . The mortar shall have sufficient plasticity for laying and there shall be no
hard lumps that would interfere with the evenness of bedding the base shall be cleared with well wetted. The mortar shall then
be spread in thickness not less than 10 mm at any place and average 12 mm thickness. The proportion of the cement mortar
shall be as specified in the item.
The tiles before laying shall be soaked in water for atleast two hours Neat Gracie cement grout at 3.3 Kg/Cement /Sq. mt. Of
honey like consistency shall be separated over the mortar bedding as directed. The edges of the tiles be smeared with neat
cement slurry. The tiles shall be well pressed and gently tapped with a wooden mallet till they are properly bedded and in level
with the adjoining tiles. There shall be no hollows in bed or joints. The joints between the tiles shall be as thin as possible in
straight line or as per pattern.
The tiles shall not have staggered joints. The joints shall be true to centre line both ways. The Nehni trap coming in the
flooring shall be so positioned that its grating shall replace only one tile as far as possible. Where full size tiles cannot be fixed,
they shall be cut (swan0 to be required size and the edges rubbed smooth to ensure straight and true joints. The joints shall
be filled with grey cement grout with wire brush of trowel to a depth of 5 mm. and loose material removed. White cement shall
be used for pointing the joints., After fixing the tile finally in an even the flooring shall be kept wet and allowed to nature
undisturbed for 7 days.
The surplus cement grout that may have come out of the joints shall be cleared off before it sets. Once the floor has set, it
shall be carefully washed, cleared by dilute acid and dried. Proper precaution and measures shall be taken to ensure that the
tiles are not damaged inany way till the completion of the construction.
Mode of measurement & payment
The work done shall be measured in sq. mt. For visible area of work done, The length and width of the flooring shall be
measured not between the faces of skirting or dedos or plastered face of wall as the case may be. The paving under dedo or
skirting shall not be measured. No deduction shall be made not extra paid for any opening in the floor of area upto 0.1 sq. mt.
Nothing extra shall be paid for laying the floors at different levels in the same rooms.
The rate shall be for a unit of one sq. metre.
Providing and laying Ceramic tiles 6 mm thick in flooring treads of steps and landing laid on a bed of 12 mm thick
cement mortar 1:3 (1-cement :3-coarses and) finishing with flush pointing in white cement. (upto 10 ton)
Water shall conform M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11.
Ceramic tiles shall be of approved colour and quality. The tile shall be even, sound regular
in shape and generally uniform in colour. It shall be without any soft veins, cracks of flows.
All angles and edges of the slabs shall be true square and free form chippings and giving plain surface. The
thickness shall be 10 mm to 15 mm. as specified in the item but not less than 10 mm. at any place.
Claddding for the ceramic tiles shall be cement mortar 1:3 (1 cement : 3 coarse sand) as given in the description of
the item. Sub grade shall be cleaned, wetted and mopped. Mortar of the specified mix and 10 mm thickness shall be
then be spread. Top surface of the mortar shall then be corrected by adding fresh mortar at hollows or depressions.
The mortar shall then be allowed to harden bit. Over this surface, cement slurry of honey like consistency shall be
applied. The slab shall then be gently place in position and tapped with wooden mallet till it is properly pedded in
level with and close to the adjoining slab. The joint shall be as fine as possible. The tiles fixed in the floor adjoining
the wall shall enter not less then 10 mm. under the plaster skirting or dado. The junction between the wall floor shall
be finished neatly. The finished surface shall be true to levels and slopes as directed.
The cladding shall be kept wet for a minimum period of 7 days. So that joints set properly.
The floor shall then be washed clean with water. The holes required for Nahni traps, pipes any other fittings shall be
made without any extra cost.
Mode of measurements & payment :
The risers of steps, skirting or dado shall be measured in sq. metre. Length shall be measured along the finished
faces of risers, skirting or dado. Height shall be measured from finished level of treads or floor to top. Lining of pillar
shall be measured under this item.
The rate shall be for a unit of sq. metre
Providing & Fixing 20 mm thick Mirror Polished Decorative Granite Board with Computerised Golden
Letters Discription as per instructions of engg. in charge to M.S. frame structure for
Inaugaration & Public Handover Function (N.S.)
Providing and laying Vitrified tiles 8 to 10 mm thick, 36''x36'' in flooring treads of steps and landing laid on a
bed of 12 mm thick cement mortar 1:3 (1-cement:3-coarses and) finishing with flush pointing in white
cement. (upto 10 ton)
Providing and Laying 36" x 36" vitrified 8 mm th.anti skid tiles of "RAK","Bell" or equivalent make as approved by
consultants flooring/skirting over 20 mm thick cement mortar 1:6 (1 cement : 6 coarse sand) on new surface &
jointed with colour cement slurry incl.with flush pointing & cleaning the surface etc.comp
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11. vetrified tiles
of 24" x 24" , 8 mm th.anti skid tiles. "RAK","Bell" or equivalent make
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement mortar 1:6
(1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item. Minimum thickness at
any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and thickness shall
then be spread on an are sufficient to receive one granite slab, The slab shall be washed clean before laying. It shall
be laid on top pressed and tapped gently to bring it in level with other slabs. It shall then be lifted and laid a side.
The top surface of the mortar shall then be corrected by adding fresh mortar at hollows, or depressions. The mortar
shall then be allowed to harden it over this surface cement slurry of honey like consistency at 4.4 Kg. Of cement per
sq. metre. The edges of slabs already paved shall be buttered with grey cement. The slab shall then be gently
placed in position and tapped with wooden mallet till it is properly bedded in level with and close to the adjoining
slab. The joints shall be as fine as possible : Surplus cement on the surface of the slabs shall be removed. The slab
fixed in the floor adjoining the walls shall enter not less 10 mm. under the plaster skirting or dado. The junction
between the walls and floors shall be finished neatly. The finished surface shall be true to level and slopes as
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
flooring with various kinds of floors shall measured in sq. metre. The length and breadth shall be measured between
the finished face of skirting or dado or wall plaster. No deduction shall be made not extra shall be paid for any
openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for laying stone at different levels in the
same room. Treads and steps of stairs paved with granite stone slabs shall also be measured under flooring.
The rate shall be for a unit of one sq. metre
Providing and laying Vitrified tiles 8 to 10 mm thick, 24''x24'' in flooring treads of steps and landing laid on a
bed of 12 mm thick cement mortar 1:3 (1-cement:3-coarses and) finishing with flush pointing in white
cement. (upto 10 ton)
Providing and Laying 24" x 24" vitrified 8 mm th.anti skid tiles of "RAK","Bell" or equivalent make as approved by
consultants flooring/skirting over 20 mm thick cement mortar 1:6 (1 cement : 6 coarse sand) on new surface &
jointed with colour cement slurry incl.with flush pointing & cleaning the surface etc.comp
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11. vetrified tiles
of 24" x 24" , 8 mm th.anti skid tiles. "RAK","Bell" or equivalent make
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement mortar 1:6
(1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item. Minimum thickness at
any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and thickness shall
then be spread on an are sufficient to receive one granite slab, The slab shall be washed clean before laying. It shall
be laid on top pressed and tapped gently to bring it in level with other slabs. It shall then be lifted and laid a side.
The top surface of the mortar shall then be corrected by adding fresh mortar at hollows, or depressions. The mortar
shall then be allowed to harden it over this surface cement slurry of honey like consistency at 4.4 Kg. Of cement per
sq. metre. The edges of slabs already paved shall be buttered with grey cement. The slab shall then be gently
placed in position and tapped with wooden mallet till it is properly bedded in level with and close to the adjoining
slab. The joints shall be as fine as possible : Surplus cement on the surface of the slabs shall be removed. The slab
fixed in the floor adjoining the walls shall enter not less 10 mm. under the plaster skirting or dado. The junction
between the walls and floors shall be finished neatly. The finished surface shall be true to level and slopes as
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
flooring with various kinds of floors shall measured in sq. metre. The length and breadth shall be measured between
the finished face of skirting or dado or wall plaster. No deduction shall be made not extra shall be paid for any
openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for laying stone at different levels in the
same room. Treads and steps of stairs paved with granite stone slabs shall also be measured under flooring.
The rate shall be for a unit of one sq. metre
Providing and laying Vitrified tiles 8 to 10 mm thick, in skrting risers of steps and dedo on 10 mm thick
cement plaster 1:3 (1-cement:3-coarse sand) and jointed with white cement slurry (upto 10 ton)
Providing and laying Vitrified tiles 8 to 10 mm thick, in skrting risers of steps and dedo on 10 mm thick
cement plaster 1:3 (1-cement:3-coarse sand) and jointed with white cement slurry (upto 10 ton)
Mode of measurements & payment : The rate shall be for a unit of one Sq. meter.
Providing and laying Vitrified tiles 8 to 10 mm thick, 24''x24'' in skrting risers of steps and dedo on 10 mm
thick cement plaster 1:3 (1-cement: 3-coarse sand) and jointed with white cement slurry (upto 10 ton)
Providing and laying Vitrified tiles 8 to 10 mm thick, 24''x24'' in skrting risers of steps and dedo on 10 mm
thick cement plaster 1:3 (1-cement: 3-coarse sand) and jointed with white cement slurry (upto 10 ton)
Mode of measurements & payment : The rate shall be for a unit of one Sq. mete
Providing and laying 24" x 24" vitrified 8 to 10 mm th.Double Charged Gloosy / Matt tiles of
Approved make as Approved by Adl.C.E. / Consultants for upto 10 cm high skirting as approved by
Engineer in charge over 10 mm thick cement mortar 1:6 (1 cement : 6 coarse sand)on new surface&
jointed with colour cement slurry incl with flush pointing & cleaning the surface etc. comp.
Mode of measurements & payment : The rate shall be for a unit of one Sq. mete
Providing and laying polished Kota stone slab flooring over 20 mm (Average) thick base of cement mortar
1:6 (1-cement:6-coarses and) or L.M.1.1.5 (1-Lime putty:1.5-coarses and) laid over and jointed with grey
cement slurry mixed with pigment to match the shade of slab including rubbing and polishing etc.
complete. (A) 25 mm thick (upto 10 ton)
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11. Marble
stone slab 20 mm. thick.
Dressing of slab : Every stone shall be cur to required size and fine chisel dressed to give a smooth and even
surface on all sides to the full depth. A straight edge laid along the sides of the stone shall be fully in contact with it.
Chisel dressing shall also be done on top surface to remove any waviness. The sides and top surface to granite
slabs shall be machine polished and molding etc. complete before using. All angles and edges of slabs shall be true
square and free form chippings.
The thickness of stone shall be 18 mm. The allowable tolerance shall be 1 mm. allowable. The tolerance shall be
mm. in length and breath.
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement mortar 1:6
(1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item. Minimum thickness at
any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and thickness shall
then be spread on an are sufficient to receive one granite slab, The slab shall be washed clean before laying. It shall
be laid on top pressed and tapped gently to bring it in level with other slabs. It shall then be lifted and laid a side.
The top surface of the mortar shall then be corrected by adding fresh mortar at hollows, or depressions. The mortar
shall then be allowed to harden it over this surface cement slurry of honey like consistency at 4.4 Kg. Of cement per
sq. metre. The edges of slabs already paved shall be buttered with grey cement. The slab shall then be gently
placed in position and tapped with wooden mallet till it is properly bedded in level with and close to the adjoining
slab. The joints shall be as fine as possible : Surplus cement on the surface of the slabs shall be removed. The slab
fixed in the floor adjoining the walls shall enter not less 10 mm. under the plaster skirting or dado. The junction
between the walls and floors shall be finished neatly. The finished surface shall be true to level and slopes as
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
marble stone flooring with various kinds of marble shall measured in sq. metre. The length and breadth shall be
measured between the finished face of skirting or dado or wall plaster. No deduction shall be made not extra shall
be paid for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for laying stone at different
levels in the same room. Treads and steps of stairs paved with granite stone slabs shall also be measured under
The rate shall be for a unit of one sq. metre.
ITEM NO -59 & 60 ( Consider Marble Stone Instead of Kota stone for Item No. 59)
Providing and laying polished Kota stone slab flooring over 20 mm (Average) thick base of cement mortar
1:6 (1-cement:6-coarses and) or L.M.1.1.5 laid over and jointed with grey cement slurry including rubbing
and polishing etc.complete. (B) 30 mm thick (upto 10 ton)
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11. Marble
stone slab 20 mm. thick.
Dressing of slab : Every stone shall be cur to required size and fine chisel dressed to give a smooth and even
surface on all sides to the full depth. A straight edge laid along the sides of the stone shall be fully in contact with it.
Chisel dressing shall also be done on top surface to remove any waviness. The sides and top surface to granite
slabs shall be machine polished and molding etc. complete before using. All angles and edges of slabs shall be true
square and free form chippings.
The thickness of stone shall be 18 mm. The allowable tolerance shall be 1 mm. allowable. The tolerance shall be
mm. in length and breath.
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement mortar 1:6
(1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item. Minimum thickness at
any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and thickness shall
then be spread on an are sufficient to receive one granite slab, The slab shall be washed clean before laying. It shall
be laid on top pressed and tapped gently to bring it in level with other slabs. It shall then be lifted and laid a side.
The top surface of the mortar shall then be corrected by adding fresh mortar at hollows, or depressions. The mortar
shall then be allowed to harden it over this surface cement slurry of honey like consistency at 4.4 Kg. Of cement per
sq. metre. The edges of slabs already paved shall be buttered with grey cement. The slab shall then be gently
placed in position and tapped with wooden mallet till it is properly bedded in level with and close to the adjoining
slab. The joints shall be as fine as possible : Surplus cement on the surface of the slabs shall be removed. The slab
fixed in the floor adjoining the walls shall enter not less 10 mm. under the plaster skirting or dado. The junction
between the walls and floors shall be finished neatly. The finished surface shall be true to level and slopes as
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
marble stone flooring with various kinds of marble shall measured in sq. metre. The length and breadth shall be
measured between the finished face of skirting or dado or wall plaster. No deduction shall be made not extra shall
be paid for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for laying stone at different
levels in the same room. Treads and steps of stairs paved with granite stone slabs shall also be measured under
The rate shall be for a unit of one sq. metre.
Providing and laying polished kota stone slab 25 mm thick in risers of steps, skirting Dedo and pillars laid
on 10 mm thick cement mortar 1:3 (1-Cement :3 coarses and) and jointed with gray cement slury mixed with
pigment to match the shade of slab including rubbing and polishing etc.complete. (upto 10 ton)
The relevant specifications of item no. 59 shall be followed except shall that the kota stone shall be fixed for
risers of steps, skirting or dado in C.M. 1:3 and the polishing shall be manually instead of machine polishing.
Mode of measurement & payment :
The risers of steps, skirting or dado shall be measured in sq. metre. Length shall be measured along the
finished faces of risers, skirting or dado. Height shall be measured from finished level of treads or floor to top. Lining
of pillar shall be measured under this item.
The rate shall be for a unit of 1 sq. metre.
Providing and laying cement concrete flooring 1:2:4 (1-cement: 2-coarses and:4-graded stone aggregate
20mm nominal size) laid in one layer and finished with a floating coat of neat cement. (A) 40mm thick. (upto
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Stone aggregate
mm. nominal size shall conform to M-12.Cement concrete 1:2:4 proportion measured by volume shall conform to
relevant specification or ordinary grade 1:2:4 concrete.
The cement concrete flooring of 40 mm. thick (average) is to be laid as per the site condition. The concrete shall be
mixed in a mechanical mixer at the work. Hand mixer may however be allowed for smaller quantities of work and in
case of failure of machines or as permitted by the engineer-in-charge. It shall carried out on a water tight platform
and care shall be taken to ensure that mixing is continued until the mass is uniform in colour and consistency.
However in such cases 10% more cement than otherwise required shall have to be used without any cost. The
mechanical mixing shall be done for a period of /2 to 2 minutes. The quantity of water shall be thus sufficient of
produce a dense concrete required workability for the purpose. Flooring of specified thickness shall be laid in
accordance with approved pattern or as directed. Finishing operation shall start shortly after the cessation of beating
and shall be spread over a period of one to six hours depending upon the temperature and atmospheric conditions.
The surface shall be left for some time till moisture disappears from it. Fresh quantity of cement shall be mixed with
water to form a thick slurry and spread over the surface while the concrete is still green. Use of dry cement or
cement and sand mixture sprinkled on this surface to stiffen the concrete or absorb excessive moisture shall not be
permitted. The cement slurry shall than be properly paste twice by means of iron flats, once, when the slurry is
applied and the second time when cement starts setting and finished smooth. The surface shall be marked with
string or B.R.C. fabric jali to make the surface non slippery as and when directed. The junction of floors with wall
plaster dado or skirting shall be rounded where so required upto 25 mm. radius. Flooring in lavatories and bath
rooms shall be laid after fixing of water closet and squatting pans and floor traps, which shall be plugged while laying
the floors and opened after the floors, are completed. Any damage, done to water supply sanitary fittings during the
execution of work shall be mage good.
After the final set, the concrete shall be kept continuously wet, if required ponding for a period of not less than
days from the date of placement.
The form work shall be provided if necessary as directed by the engineer in charge. Concreting shall be done as per
alternate bay method with necessary centering wither by mastic or cement mortar as directed.
Mode of measurement & payment :
The rate shall include the cost of all material and labour involved in all the operations described above. No deduction
shall be made or extra paid for any opening upto 0.1 sq. meter in area in the floor, nothing extra shall be paid for
laying the floor at different levels in the same room or the court yard.
The rate shall be for unit of one sq. meter.
Providing and laying cement concrete flooring 1:2:4 (1-cement: 2-coarse sand:4-graded stone aggregate
20mm nominal size) laid in one layer and finished with a floating coat of neat cement. (B) 50mm thick. (upto
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Stone aggregate 20 mm.
nominal size shall conform to M-12.Cement concrete 1:2:4 proportion measured by volume shall conform to relevant
specification or ordinary grade 1:2:4 concrete.
The cement concrete flooring of 50 mm. thick (average) is to be laid as per the site condition. The concrete shall be
mixed in a mechanical mixer at the work. Hand mixer may however be allowed for smaller quantities of work and in
case of failure of machines or as permitted by the engineer-in-charge. It shall carried out on a water tight platform
and care shall be taken to ensure that mixing is continued until the mass is uniform in colour and consistency.
However in such cases 10% more cement than otherwise required shall have to be used without any cost. The
mechanical mixing shall be done for a period of /2 to 2 minutes. The quantity of water shall be thus sufficient of
produce a dense concrete required workability for the purpose. Flooring of specified thickness shall be laid in
accordance with approved pattern or as directed. Finishing operation shall start shortly after the cessation of beating
and shall be spread over a period of one to six hours depending upon the temperature and atmospheric conditions.
The surface shall be left for some time till moisture disappears from it. Fresh quantity of cement shall be mixed with
water to form a thick slurry and spread over the surface while the concrete is still green. Use of dry cement or
cement and sand mixture sprinkled on this surface to stiffen the concrete or absorb excessive moisture shall not be
permitted. The cement slurry shall than be properly paste twice by means of iron flats, once, when the slurry is
applied and the second time when cement starts setting and finished smooth. The surface shall be marked with
string or B.R.C. fabric jali to make the surface non slippery as and when directed. The junction of floors with wall
plaster dado or skirting shall be rounded where so required upto 25 mm. radius. Flooring in lavatories and bath
rooms shall be laid after fixing of water closet and squatting pans and floor traps, which shall be plugged while laying
the floors and opened after the floors, are completed. Any damage, done to water supply sanitary fittings during the
execution of work shall be mage good.
After the final set, the concrete shall be kept continuously wet, if required ponding for a period of not less than
days from the date of placement.
The form work shall be provided if necessary as directed by the engineer in charge. Concreting shall be done as per
alternate bay method with necessary centering wither by mastic or cement mortar as directed.
Mode of measurement & payment :
The rate shall include the cost of all material and labour involved in all the operations described above. No deduction
shall be made or extra paid for any opening upto 0.1 sq. meter in area in the floor, nothing extra shall be paid for
laying the floor at different levels in the same room or the court yard.
The rate shall be for unit of one sq. meter.
Providing and fixing pre-cast concrete kerb stone of gray cement based concrete block
30 cm length, 30 cm height and 15 cm thick of M250 grade concret as per approved design and
including excavation for fixing in proper line and level, filling the joint with C:M 1:3 (1 cement :3 fine
sand) etc complete. (upto 10 ton)
Trenches of specified width and depth shall first be made along the edges of the wearing course of the
road or along the line of pave block flooring to receive the restraint blocks. The bed of the trenches shall
be compacted manually with steel rammers to a firm and even surface and then stones shall be set in
The edge restraint blocks shall be laid with their length running parallet to the paving edge, true
in line and gradient. The joints of blocks shall be not more than 10 mm and filled with the CM 1:3 (
cement : 3 fine sand ) which shall be cured for 7 days.
Finishing The edges shall be restored and all surplus earth including rubbish etc. disposed off as directed
by the Engineer-in Charge.
Measurements Length of the finished work shall be measured in running metre along the edge of the
paving correct to a cm.
Rate The rate shall include the cost of the materials and labour including stone of specified material
involved in all the operation described above. The rate shall be for a unit of one meter basis.
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 60mm thick with
grade of concrete M300 pneumatic compressed / vibrated mechanically and as per approved design
Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint with sand in
proper line and level as per guidlines of IRC : SP 63-2018 etc.
Scope of work :
Excavation and compaction up to 30 cm in height . for footpath paving in all sorts of soil murrum
including sorting outs and stacking of useful materials stuff up to 50 mt. lead from excavated place
and same well be carting. Up to 5 km.
The scope of work includes manufacturing, supplying and laying of precast paver blocks at various Retail
outlets. The work includes :
1.1 Verification of the existing site condition and advising our project in charge to lay suitable base
course if required. Contractors are required to satisfy themselves with quality of sub grade, sub-
base course before the paver blocks are laid and suggest strengthening if required.
1.2 Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.
1.3 Manufacturing of paver blocks in your plant as per requirements in technical specification
1.4 Supplying of paver blocks at site, including handling at both ends.
1.5 Laying of paver blocks at site as per requirement in technical specification, within shortest
possible time. The site being existing operating Retail Outlets, care should be taken to ensure that
the operation is not closed. The job of laying may required to be carried out during night also.
1.6 Testing of paver blocks through reputed Govt./Non Govt. Test house and submission of test
results as per requirements in Technical Specifications. HPCL reserves the right to carryout test
at random. Cost for such tests to be borne by party.
1.7 The contractor shall guarantee that all material and components designed, fabricated, supplied
and laid by him shall be free from any type of defect due to faulty material and/or
workmanship/erection for a period of One year from the date of completion of work at individual
sites. However, the contractor fro two years shall render free maintenance.
TECHNICAL SPECIFICATIONS :
I) Paver Block Manufacturing Facilities :
The Paver Block shall be made in factory with following minimum facilities :
1.1 Concrete Block making Machines :
The machine should be capable of producing high quality Paver Blocks by obtaining high
level of compaction by application of hydraulic compaction and also by high intensity vibration
to the moulds. The machine should have automatic control panel for uniformity in strength.
1.2 Concrete Batching & Mixing Plant : (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete
ingredient should be mixed in concrete Batching & Mixing plant with minimum capacity of
cum/hour. The plant should equipped with automatic control panel for maintaining water cement
ratio from batch to batch to obtain concrete of uniform quality and strength. The plant should be
equipped with adequate mechanism for mechanized loading of raw materials into mixer and
conveyor belt for transportation of concrete from mixer to concrete block making machine to
maintain quality of wet cement.
The factory should have well designed curing area to ensure adequate curing of paver blocks.
For the Rubber mould paver block specification has to followed as per specification of Gray and coloured
paver block specification. But at the production level the mould for producting rubber moulded paver block the
mould is of rubber materials and the prodection of rubber moulded paver block is even shaded, finishing and even
colour shaded and using Rubber mould should be producing on vibratory mechine by obtaing high level of
compaction by application of vibration to the moulds. The machine should have automatic control pannel for
uniformity in strength. Or as per direction of engineering incharge.
1.5 Laboratory (Desirable but not essential) :
The factory should have the following:
(i) Compression testing machine of adequate capacity.
(ii) Other tools and equipment for testing raw materials and paver blocks.
(iii) (1).Systematic record of test results of various paver blocks manufactured in the factory.
(2).Concrete Mix Design for various grade of concrete used for making of paver blocks.
II) SPECIFICATIONS FOR COLOURED PAVER BLOCKS :
Coloured concrete paver blocks shall be manufactured as per attached specifications using approved colour
Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with minimum colour pigment
of 3% by weight of cement. The colour shade shall be “RED” as selected by HPCL before commencement
of the work. White cement shall be used for colored pavers to obtain the desired colour shade. The job also
includes providing 50 mm thick sand bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from
the date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers will be as
per attachment.
III) PAVERS BLOCK CHARACTERISTICS :
The concrete pavers should have perpendicularities after release from the mould and the same should be
retained until the laying.
The surface should be reasonably smoothe and of anti skid and anti glare type.
The paver should have uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling after
vibration on the paver Surface.
The concrete mix design should be followed for each batch of materials separately and automatic batching
plant is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in single layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired shape of the
surface and adequate compaction of the sand in the joints.
The pavers shall be of cement gray colour without any pigment & for coloured pavers refer “specifications
for coloured pavers.”
The pavers are to be skirted all round with kerbing using solid concrete blocks of size 150mm X 250mm X
380mm. The kerbing should be embedded for 100mm depth. The concrete used for kerbing shall be cured
properly for 7 days minimum.
IV) Paver Block Dimensions :
Thickness 60mm or 80mm
Shape Uniregular (Uniform Shape with no Hollow
Chamfer 4mm to 6mm along top edges
Colour a. Natural cement grey colour without
use of any pigment.
b. For coloured pavers refer
“specifications for coloured pavers”
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
V) Testing of Paver Blocks :
SR. Average Values
NO. (Average of Minimum
Five Samples/Site)
1. Compressive Strength Min. 45 N/Sqmm for 80mm
thick OR Min. 30 N/Sqmm for
2. Flexural Strength Minimum 4.5 N/Sqmm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
5. Minimum Cement Contact 380 Kg/Cum (Not Essential)
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR PAVER BLOCKS.
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks. Average of minimum 8 blocks per site.
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
2. Compressive Strength
Testing for compressive strength shall be undertaken in accordance with Appendix-B.
The average compressive strength of the bocks tested shall be 40 N/Sqmm.
3. Abrasion Resistance
Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor Tiles)
4. Flexural Strength
Testing for flexural shall be n accordance with IS 1237 (Specifications for Cement Concrete Floor Tiles) –
5. Water Absorption
Testing for water absorption shall be in accordance with IS 2185:1979 : Part I (Specifications for Concrete
Masonry Units) – Appendix E.
Sampling of Paver blocks.
1. Method of sampling :
Before laying paver blocks, each designated section comprising not more than 50000 blocks, shall be
divided into ten approximately equal groups. Three blocks shall be drawn from each group.
2. Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated section of
part thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid
damage to the paving in transit. Protect the paving from damage and contamination until they have been
tested. The testing shall be carried as soon as possible, after the sample has been taken. As soon as
practicable after sampling. The samples shall be stored in water at 20 degree C 5 degree C for 24 hours
prior to testing.
The rate shall be for a unit of one square meter.
Providing and laying broken china mosaic flooring for terrace using 12 mm to 20 mm broken pieces of
glazed tiles to be laid over cement mortar 1:3 to plain or slope and to be tempered to bring mortar creme out
upto surface using white cement including rounding off junctions and extending them up to15 cm along the
wall, clearing with water and oxalic acid etc.asdirected.
Providing and laying China Mosaic finishing over flat or curved surface, including laying to approved patterns, with
precies leveling and setting curvatures with necessary tools and templates, using white/coloured broken ceramic tile
chips, set in pigmented cement mortar 1:4, as directed, finishing in line, level and to required slope, flushing with
appropriate pigimented cement grout, curing and finishing with mild acid wash etc. complete.
(1) China Chips in required colours specially broken from full tiles in required size
(2) Cement (3) Sand (4) White Cement (5) Steiner
Before laying a final layer of China Chips prepare the surface to the required slope and level with a backing
coat in C.M (1:3). While laying a backing coat, spread a layer of thick cement slurry and scrub the same vigorously
to seal all pores in concrete below.
For the required designs prepare templates for different patterns from steel flats or plywood and mark out total
design on the designated area. Estimate the quantity of Chips of different colous and ensure its uninterrupted supply
before starting the work. Lay the chips flat on the bedding coat and fix tightly be light hammering. Remove grey
cement from the joints by scrapping before final set of cement.
Finish the joints neatly with white cement and harmonious colour Steiner. All design and pattern shall be finished
with first class workmanship. The surface should finally cleaned, given a mild acid wash for gain the luster of China
Cost of China Chips, White cement, OPC, Sand, Steiner and all labour for leveling, laying by specialist artisan,
preparing templates, testing etc are included.
MODE OF MEASUREMENT :
Dimensions of total finished area as laid are recorded and area is computed in sq.m., rounded to two places of
Providing and laying coloured glazed tiles of the size 300 mmx200 mmx8 mm/300 mmx450 mmx8 mm in
skirting, risers of steps and dedo on 10 mm. thick cement plaster 1:3 (1cement: 3 coarse sand) & jointed
with white cement slurry.
Workmanship : The work shall be carried out for skirting as dedo. Before fixing glazed tiles of shade and size as specified,
the surface shall be prepared by heavy scarping, making joints etc. to the required line, level and plumb. The surface shall be
thoroughly wetted before commencing the laying work. Thereafter about 10 mm. thick backing of cement mortar in specified
proportion shall be applied on the surface in true like and level generally as per specifications of plaster item.
Fixing : The black of each tile to be fixed shall be smeared with cement paste of matching colour and the glazed tiles shall
then be gently tapped against the surface, with a wooden mallet. The skirting shall be done only after the flooring is competed.
Any pipes coming out of the wall through the dedo or skirting shall only beat at the intersections of the horizontal and vertical
joints. The tiles shall not have staggered joints. The joints shall be true to entire line both ways and vertical joints shall be in
line with joints of flooring. Tiles shall be fixed as close as possible to the adjoining tiles and any difference in the thickness of
the glazed tiles shall be evened out in the cement paste so that all the tiles faces are set in conformly with one another. The
skirting shall project uniformly and not more than 6 mm. thickness beyond the finished surface above. Top of skirting of dedo
shall be truly horizontal. The rises of steps, skirting or dedo shall rest on top of treads of flooring wherever required. The tiles
shall be cut (sawn) and thin edges smoothened before use.
Curing : Curing shall be done for 7 days continuously.
Finishing : Skirting and dedo shall be hand polished to have an even smooth and shining surface. In case of skirting only
mm. x 10 mm. grove shall be provided at the junction of cement plaster and cement tilesThe white glazed tiles shall be laid on
cement mortar bedding of 12 mm thick in C.M. 1 :3 . The mortar shall have sufficient plasticity for laying and there shall be no
hard lumps that would interfere with the evenness of bedding the base shall be cleared with well wetted. The mortar shall then
be spread in thickness not less than 10 mm at any place and average 12 mm thickness. The proportion of the cement mortar
shall be as specified in the item.
The tiles before laying shall be soaked in water for atleast two hours Neat Gracie cement grout at 3.3 Kg/Cement /Sq. mt. Of
honey like consistency shall be separated over the mortar bedding as directed. The edges of the tiles be smeared with neat
cement slurry. The tiles shall be well pressed and gently tapped with a wooden mallet till they are properly bedded and in level
with the adjoining tiles. There shall be no hollows in bed or joints. The joints between the tiles shall be as thin as possible in
straight line or as per pattern.
The tiles shall not have staggered joints. The joints shall be true to centre line both ways. The Nehni trap coming in the
flooring shall be so positioned that its grating shall replace only one tile as far as possible. Where full size tiles cannot be fixed,
they shall be cut (swan0 to be required size and the edges rubbed smooth to ensure straight and true joints. The joints shall
be filled with grey cement grout with wire brush of trowel to a depth of 5 mm. and loose material removed. White cement shall
be used for pointing the joints., After fixing the tile finally in an even the flooring shall be kept wet and allowed to nature
undisturbed for 7 days.
The surplus cement grout that may have come out of the joints shall be cleared off before it sets. Once the floor has set, it
shall be carefully washed, cleared by dilute acid and dried. Proper precaution and measures shall be taken to ensure that the
tiles are not damaged inany way till the completion of the construction.
Mode of measurement & payment
The work done shall be measured in sq. mt. For visible area of work done, The length and width of the flooring shall be
measured not between the faces of skirting or dedos or plastered face of wall as the case may be. The paving under dedo or
skirting shall not be measured. No deduction shall be made not extra paid for any opening in the floor of area upto 0.1 sq. mt.
Nothing extra shall be paid for laying the floors at different levels in the same rooms.
The rate shall be for a unit of one sq. metre.
Providing corrugated G.I. sheet of class-3 roofing fixed with glavanished iron J or L Hooks, Bolts and nuts
mm diameter with bitumen and G.I. limpet washer or G.I. limpet washer. filled with white lead complete
excluding the cost of purlins, Rafters and Trusses. (1) 0.80 mm thick sheet.(up to10 ton)
Mode of payment shall be in Sqm and the work shall be done as specified in Above Item.
Providing ridges or hips 600 mm over allin plain G.I. sheet class-3 fixed with G.I. J or L Hooks
and nuts 8 mm dia G.I. Limpet and bitumen washer complete. (1)
Mode of payment shall be in Sqm and the work shall be done as specified in Above Item.
Providing and fixing 150 mm wide 450 mm over all semi circular plain G.I.sheet class-3 gutter with
Iron brackets 40 mmx3 mm size Bolts, Nuts, washers etc. including making necessary
connection with rain water pipes. (i) 0.80 mm thick
Mode of payment shall be in Sqm and the work shall be done as specified in Above Item.
Providing and fixing five courses water profing treatment with bitumen felt consisting of
second and fourth course of blown/ bitumen or/and residual bitumen applied hot at
kg.per Sq.M.of area for each course and first course with fibre base bitunen saturated under
lay type land third course with fibre base self finished felt type 2 grade 1 and fifth and final course
of stone grit 6 mm and down size or pea sizes gravel spread at
Cu.Metre/Sq.metre preparation of surface excluding grading complete. (upto 10 ton) including
Mode of payment shall be in Sqm and the work shall be done as specified in Above Item.
FORM OF GUARANTEE BOND
"I/We……………………………(Contractor)hereby guarantee that work will remain
unaffected and will not be in any way damaged by termite or any other germs of similar
type for period of 05 years after completion of the work of anti0termite as per the terms and
condition of the contractor and contractor hereby indemnifies and agrees to save harmless
the Government of Gujarat from any loss and or damage that might be caused account of
termite and or other similar type of germs and hereby Guarantee to make good any loss or
damages suffered by the Government of Gujarat and further guarantee to redo the effective
work without claiming any extra cost"
This guarantee shall remain force for the period of 05 year from the completion of the
work under the contract and it shall remain binding to the contractor for period of 05years.
The deposit at the rate of 50% of the cost of this item from the running and final bills
shall be recovered and retained for the fist one year after the completion of the completion
of the guarantee period.
Mode of Measurement :
The length and breadth shall be measured correct to cm as per the dimensions of
sanctioned plans NO deduction shall be made not extra paid for and opening for pipe etc.
upto 0.1 sq mt The rate shall include the cost of all labour materials required for the
operation involved for satisfactory completion of this item The saids of the trenches 30cms
each side and bottom shall be measured under this item.
The rate shall be for a unit of one sq. meter.
Providing and fixing on wall face C.I. Rain water pipe including filling the joints with spun yarn soaked in
neat cement slurry and cement mortar 1:2(1- Cement : 2-fine sand) (A) 75 mm dia.
Mode of payment shall be in Rmt
Providing 15 mm thick cement plaster in single coat on Rough (Similar) side of single or half brick walls for
interior plastering up to floor two level and finished even and smooth in (i) Cement mortar 1:3 (1-cement :3-
Mode of payment shall be in Sqm
Providing 20mm thick sand faced cement plaster on walls upto height 10 metres above ground level
consisting of 12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand) and 8mm thick finishing coat of C.M.
1:1 (1-cement : 1-sand) etc. complete.
The specification is as per above Item except thickness of the plaster is 20 mm sand faced and 12 mm th. Backing coat
in C.M. (1:3) and 8 mm thick finishing coat no machine paster will be allowed for spray od sand for plastering etc comp as
directed by Engg i charge.
Mode of measurements & payment : The rate shall be for a unit of one Square Meter.
Water M-1. The Cement mortar of proportion 1:3 shall conform to M-13.
Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be sound. These shall be properly
examined before erection and use Stage scaffolding shall be provided for ceiling plaster, which shall be independent of
Preparation of back-ground :
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae, afflorescence and other foreign matter by
water or by brushing. Smooth surface shall be roughened by wire brushing if it is not hard and by racking if it is hard. In
case of concrete surface, if a chemical retarder has been applied to the form work, the surface shall be roughened by wire
brushing and all the resulting dust and loose particles cleaned off and care shall be taken that none of the retarder is left
on the surface. Trimming of projections on brick/concrete surface where necessary shall be carried out to get an even
Raking of joints in case of masonry where necessary shall be allowed to dry out for sufficient period before carrying out
the plaster work.
The work shall not be soaked but only damped evenly before applying the plaster. If the surface becomes dry such area
shall be moistened again.
For external plaster, the plastering operation shall be started from top floor and carried downwards. For internal plaster,
the plastering operations may be started wherever the building frame and cladding work are ready and the temporary
supporting ceiling resting on the wall of the floor have been removed, Ceiling plaster shall be completed before starting
plaster to walls.
Applications of Plaster :
The plaster about 15 x 15 cms. Shall be first applied horizontally and vertically at not more than 2 metre intervals over the
entire surface to serve as gauge. The surfaces of these gauges shall be truly inplane of the finished plastered surface.
The mortar shall then be applied in uniform surface slightly more than the specified thickness, then brought to a true
surface by working a wooden straight edge reaching across the gauges with small upward and sideways movement at a
time. Finally, the surface shall be finished off true with a trowel or wooden float according as a smooth or a sandy granular
texture is required. Excessive trowelling or overworking the float shall be avoided. All corners, arrises, angles and
junctions be truly vertical or horizontal as the case may be and shall be carefully finished. Rounding or chamfering
corners, arrises junctions etc. shall be carried out with proper templates to the size required.
Cement plaster shall be used within half an hour after addition of water. Any mortar or plaster which is partially set shall be
rejected and removed forthwith from the site :
In suspending the work at the end of the day, the plaster shall be left out clean to the line both horizontally and vertically.
When recommending the plaster, the edges of the old work shall be scraped clean and wetted with cement putty before
plaster is applied to the adjacent area to enable the two to properly joint together. Plastering work shall be closed at the end
of the day on the body of the wall and nearer than 15 cm. To any corners or arrises. Horizontal joints in plasterwork shall not
also occur on parapet tops and copings as these invariably lead to leakage. No portion of the surface shall be left out initially
to be packed up later on.
Each coat shall be kept dam continuously till the next coat is applied or for a minimum period of 7 days. Moistening shall
commence as soon as plaster is hardened sufficiently. Soaking of walls shall be avoided and only as much water as can
be readily absorbed shall be used excessive evaporation on the sunny or windward side of building in hot air or dry
weather shall be prevented by handling mattings or gunny bags on the outside of the plaster and keeping them wet.
Mode of measurement & payment :
The rate shall include the cost of all materials, labour and scaffolding etc, involved in the operations described under
All plastering shall be measured in square metres unless, otherwise specified length, breadth or height shall be measured
correct to a centimeter.
Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open joints in brick work, stone work
etc. or space between laths. Thickness of plaster shall be average thickness with minimum 10 mm. at any point on this
This item includes plastering upto floor two level.
The measurement of wall plastering shall be taken between the walls or partition (dimensions before plastering being
taken) for length and from the top of floor or skirting to ceiling for height. Depth of cover of cornices if any shall be
Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be measured separately.
For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of joints, beams, posts, girders,
steps etc. not exceeding 0.5 sq. mt. each in area and for openings exceeding 0.5 sq.mt. and not exceeding 3.0 sq. mt. in
each area deductions and additions shall be made in the following manner :
No deductions shall be made for ends joints, beams posts etc. and openings not exceeding 0.5 sq. mt. each and no
addition shall be made for reveals, jambs, soffits, sills etc. of these opening for finish to plaster around ends of joints,
beams, posts etc.
Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as follows and
no addition shall be made for reveals, jambs, soffits etc. sills etc. of these openings.
When both faces of all wall are plastered with same plaster, deduction shall be made for one face only
When two faces of wall are plastered with different types of plasters or if one faces is plastered and the other
pointed, deductions shall be made from the plaster or pointing on the side of frame for door, window etc. on
which width or reveals is less than that on the other side but no deductions shall be made on the other side.
Where width of reveals on both faces of all are equal, deductions of 50% of area of opening on each face shall be
made from area of plaster and/or pointing as the case may be.
For openings having door frames equal to projecting beyond the thickness of wall, full deduction for opening shall be
made from each plastered face of the wall.
In case of openings of area above 3 sq. mt. each, deduction shall be made for opening but jambs, soffits and sills shall be
The rate shall be for a unit of one sq. metre.
White washing with lime on undecorated wall surfaces (TWO coats) to give an even shade including
thoroughly brooming the surface to remove all dirt, dust mortar drops and other foreign matter.
The calearcole shall be made from glue and boiling water by mixing 1 kg. Mixture shall be suitably tinted where
required for use under coloured distemper if required. Glue shall conform to I.S. 852-1969 (Specifications for animal
Lime used shall be freshly burnt class ‘C’ Lime (fat lime) and white in colour conforming to I.S. 712-1973. Water
shall conform to M-1 Best quality of gum shall be sued in the preparation of white wash. Ultramarine blue or Indigo:
This shall conform to I.S. 55-1970 for points and shall be used for preparation of white wash. Pigments: mineral
colours, not affected by lime shall be sued in preparing colour wash.
Preparation of white wash solution :
Surface already white or colour. The fat lime shall be slaked at site and shall be mixed and stirred with about five
litres of water for 1 kg. of unslaked lime to make a thin cream. This shall be allowed to stand for a period of 24 hours
and then shall be screened through a clean coarse cloth, 4 kg. of gum dissolved in hot water shall be added to each
cubic metre of lime cream. Small quantity of ultramarine blut (Upto 3 gms. Per kg. of lime) shall also be added to the
last two coats of white wash solution and the whole solution shall be stirred thoroughly before use.
Preparation of surface :
The surface shall be thoroughly cleaned of all dust, dirt, mortar cropping and other foreign matters before white
wash is to be applied.
The surface spoiled by smoke soot shall be scraped with steel wire brushes or steel scrappers or shall be rubbed
with over burnt surkhi or brick bats. The surface shall be then broomed to remove all dust, dirt and shall be washed
with clean water.
Oil or grease spots shall be removed by suitable chemical and smooth surface shall be rubbed wire brushes.
All unsound portion of the surface plaster shall be removed to full depth of plaster in rectangular patches and
plastered again after raking the masonry joints properly. Such portion shall be wetted and allowed to dry. They shall
then be given one coat of white wash.
All unnecessary nails shall be removed, the holes cracks patches etc. shall be made good with materials similar in
composition to the surface to be prepared.
Scaffolding : Wherever scaffolding is necessary it shall be erected in such a way that as far as possible on part of
scaffolding shall rest against the surface to be white or coloured washed. A properly secured strong and well tied
suspended platform (Zoola) may be used for white washing. Where ladders are sued, pieces of old gunny bags shall
be tied at top and bottom to prevent scratches to the floors and walls. For white washing of ceilings proper stage
scaffolding shall be erected where necessary.
Application of white wash :
On the surface so prepared the white wash shall be applied with ‘Moon’ brush. The first stroke of the brush shall be
from top downwards, another from bottom upwards over the first stroke and similarly one stroke from the right
another from the left, over the first stroke brush before the it dries. This will from one coat. Each coat shall be
allowed to dry before next coat is applied. Number coats as specified in item shall be applied. It shall present
smooth and uniform finish free from brush marks and it should not come off easily when rubbed finger.
Splashing and dropping if any on the doors and windows, ventilators etc. shall be removed and the surface cleaned.
Priming and Alkali resistant treatments, scrapping of surface washing etc. surface spoiled by smoke soot removed of
oil and grease spots treatment for infection with effloresces moulds moss, funji and kitchen and patch repairs to
plaster wherever done shall not be paid extra.
Mode of measurements & payment :
All the work shall be measured in the decimal system as under :
Dimensions shall be measured to the nearest 0.01 M.
Area in individual items shall be worked out to the nearest 0.01 Sq. M.
All the work shall be measured in sq. mt. Deductions for jambs, soffits, stills etc. for opening not exceeding 0.5 sq.
mt. each in area for ends of joints, posts, beams, girders, steps etc. not exceeding 0.5 sq. mt. each in area and for
opening exceeding 0.3 sq. mt. and not exceeding 3.0 sq. mt. each in area deductions and additions shall be made
No deductions shall be made for ends of joints beams, posts etc. and openings not exceeding 0.5 sq. mt. each. No
addition shall be made for reveals, jambs, soffits, sills etc. of these openings nor for finish around ends of joints,
beams, posts etc.
Deductions for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as follows and no
addition shall be made for reveals, jambs, soffits etc. of these openings :
When both the faces or walls are provided with finish, deduction shall be made for one face only.
When each face of wall is provided with different finish deduction shall be made for that side of frame for door,
windows etc. on which width of reveals is less than that of the other side, where width of reveals on both faces of
wall are equal, deduction of 50% of area of opening on each face shall be made from total area of finish.
When only one face of wall is treated and the other face is not treated, full deduction shall be made if the width of
reveal on the treated side is less than that on the untreated side, but if the width of the reveal is equal or more than
on the untreated side neither deductions nor additions be made for reveals, jambs, soffits, sills etc.
In case of area of opening exceeding 3 sq. mt. each, deduction shall be made for openings but jambs, soffits, shall
No deduction shall be made for attachment such as casing, conducts, pipe, electric wiring and the like.
corrugated surfaces shall be measured flat as fixed and not girth. The quantities so measured shall be increased by
the following percentage and the resultant shall be included with the general areas.
Corrugated steel sheets 4%
Corrugated A. C. Sheets 20%
Semi corrugated A. C. Sheets 10%
Nainital pattern roof (Plain sheeting with rolls) 10%
Nainital pattern roof (with corrugated sheets) 25%
Cornices and other wall features, when they are not picked out in a different finish/colour shall be girthed and
included in the general area.
The rate shall include the cost of all materials, labour, scaffolding, protective measures etc. involved in all the
operations described above.
The rate shall be for a unit of one sq. metre.
Removing dry or oil bound distemper by a washing and scraping and sand papering the wall surface
smooth including necessary repairs to scratches complete.
The rate shall be for a unit of one sq. metre.
Distempering with dry distemper of approved brand and manufacture (two coats) and of required shade on
wall surfaces of given an even shade, over and including a priming coat of whiting after thoroughly
brooming the surface free from mortar dropping and other foreign matter.
The rate shall be for a unit of one sq. metre.
Item no.83,84,85,86
Distempering with dry distemper of approved brand and manufacture (One coats) and of required shade on wall
surfaces of given an even shade, after thoroughly brushing the surface clean of all grease, dirt, loose pieces of
scales including preparing the surface even and sand papered smooth.
Distempering with dry distemper of approved brand and manufacture (One coats) and of required shade on
wall surfaces of given an even shade, after thoroughly brushing the surface clean of all grease, dirt, loose pieces of
scales including preparing the surface even and sand papered smooth.
The rate shall be for a unit of one sq. metre.
Distempering with dry distemper of approved brand and manufacture (One coats) and of required shade on wall
surfaces of given an even shade, after thoroughly brushing the surface clean of all grease, dirt, loose pieces of
scales including preparing the surface even and sand papered smooth.
Distempering with dry distemper of approved brand and manufacture (One coats) and of required shade on
wall surfaces of given an even shade, after thoroughly brushing the surface clean of all grease, dirt, loose pieces of
scales including preparing the surface even and sand papered smooth.
The rate shall be for a unit of one sq. metre.
Item no.92,93,94
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an approved brand and
manufacture and of required shape even shade after thoroughly brushing the surface to remove all dirt and remains
of loose powered materials.
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an approved brand
and manufacture and of required shape even shade after thoroughly brushing the surface to remove all dirt and
remains of loose powered materials.
The rate shall be for a unit of one sq. metre.
Item no.96,97,98,99
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an approved brand and
manufacture and of required shape even shade after thoroughly brushing the surface to remove all dirt and remains
of loose powered materials.
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an approved brand
and manufacture and of required shape even shade after thoroughly brushing the surface to remove all dirt and
remains of loose powered materials.
The rate shall be for a unit of one sq. metre.
Applying priming coat over new steel and other metel surface after and including preparing the
surface by throughly cleaning, oil, grease, dirt and other foreign matter and scoured with
brushes fine steel wood, scrapers and sand paper with ready mixed priming paint brushing red lead.
The rate shall be for a unit of one sq. metre.
Painting two coats (excluding priming coat) on new steel and other metal surface with enamel paint,
brushing, interior to give an even shade including cleaning the surface an even shade including cleanicn
the surface of all dirt, dust and other foreign matter.
The rate shall be for a unit of one sq. metre.
Painting one coats (excluding priming coat) on previously painted steel and other metal surface with
enamel paint, brushing to give an even shade including cleaning the surface of all dirt, dust and
other foreign matter.
The rate shall be for a unit of one sq. metre.
Painting two coats (excluding priming coat) on new steel and other metal surface with synthetic enamel
paint, brushing to give an even shade including cleaning the surfaceofalldirt,dustandother foreign matter.
The rate shall be for a unit of one sq. metre.
Painting one coats (excluding priming coat) on previously printed steel and other metal surface with
synthetic enamel paint, brushing to give an even shade including cleaning the surface of all dirt, dust and
other foreign matter.
The rate shall be for a unit of one sq. metre.
Painting two coats (excluding priming coat) on external surface of new rain water, soil, waste and
vent pipes and fittings with ready mixed bituminous brushing, black, anti corrosive to give an
even shade including cleaning of all dirt, dustand other foreign matter.(75 mm dia)
The rate shall be for a unit of one sq. metre
Painting two coats (excluding priming coat) on external surface of new rain water, soil, waste and
vent pipes and fittings with ready mixed bituminous brushing, black, anti corrosive to give an
even shade including cleaning of all dirt, dust and other foreign matter.(100 mm dia)
The rate shall be for a unit of one sq. metre
Painting two coats (excluding priming coat) on new wood and wood based surface with enamel
paint, interior to give an even shade including cleaning the surface of all dirt, dust and
other foreign matter sand papering and stopping. (a) Ready mixed paintbrushing wood primier pink.
The rate shall be for a unit of one sq. metre
Painting one coats (excluding priming coat) on previously painted wood and wood based surface
with enamel paint, to give an even shade including cleaning the of all dirt, dust and other foreign matter.(b)
Ready mixed paintbrushing priming for enamel
The rate shall be for a unit of one sq. metre
Painting two coats (excluding priming coat) on new wood and wood based surface with ready mixed paint,
brushing, oil, gloss, semi gloss to give and even shade including cleaning of all dust, dirt and other foreign
matters and papering and stopping.
The rate shall be for a unit of one sq. metre
Finishing wall with weather proof exterior emulsion paint on wall surface (two coats) to give an required
shape even shade after thoroughly brushing the surface to remove all dirt, and remains of loose powdered
materials.etc complete
The rate shall be for a unit of one sq. metre
Applying two coats of Birla (white cement based) or Asian (acryliclapy-putty) or equivalent & two coats of
primer of approved brand and manufacture on new wall surface to give an even shade including thoroughly
brushing the surface free from mortar dropping and other foreign matter and sand papered smooth.
The rate shall be for a unit of one sq. metre
Painting two coats (excluding priming coat) on new wood and wood based surface with enamel
paint, interior to give an even shade including cleaning the surface of all dirt, dust and
other foreign matter sand papering and stopping.
The rate shall be for a unit of one sq. metre
Writing letter or figures on any surface with black japan paint (stops, comas, hyphens and the like not to be
measured and paid for separately) (i) Block (Letters/Figures) (Per 10 Letter pet CM.HT)
Extra over items for using thick white paint instead of black japan paint. (i)Block (Letters/Figures)
The rate shall be for a unit of per letterper Cm/Ht
Item no.100,101
Writing letter or figures on any surface with black japan paint (stops, comas, hyphens and the like not to be
measured and paid for separately) (ii) Indian (Letters/Figures)
Extra over items for using thick white paint instead of black japan paint. (ii) Indian (Letters/Figures)
The rate shall be for a unit of per letter per Cm/Ht. The work should be done as specified in above item.
Painting lines, deashes, arrows, letters etc on roads, Air fields and like in two coats with road marking paint,
brushing including cleaning the surface of all dirt, dust and other foreign matter. (i)Over 10cm in width
The rate shall be for a unit of one sq. metre. The work should be done as specified in above item.
Painting lines, deashes, arrows, letters etc on roads, Air fields and like in two coats with road marking paint,
brushing including cleaning the surface of all dirt, dust and other foreign matter.(ii) Upto 10 cm in width
The rate shall be for a unit of one RMT. The work should be done as specified in above item.
Painting lines, deashes, arrows, letters etc on roads, Air fields and like in one coats with road marking paint,
brushing including cleaning the surface of all dirt, dust and other foreign matter. (i)Over 10cm in width
The rate shall be for a unit of one sq. metre. The work should be done as specified in above item.
Painting lines, deashes, arrows, letters etc on roads, Air fields and like in one coats with road marking paint,
brushing including cleaning the surface of all dirt, dust and other foreign matter. (ii) Upto 10 cm in width
The rate shall be for a unit of one sq. metre. The work should be done as specified in above item.
Demolition including stacking of serviceable materilas and disposal of unserviceable materials with all lead
and lift. (i) R.C.C. work
The rate shall be for a unit of one Cum. The work should be done as specified in above item.
Demolition of Brick work and stone masonry including stacking of serviceable materil as and disposal of
unserviceable materials with all lead and lift.(ii) In Cement Mortar.
Demolition of Brick work and stone masonry including stacking of serviceable materil as and disposal of
unserviceable materials with all lead and lift.(ii) In Cement Mortar.
The rate shall be for a unit of one Cum
Dismentaling tiled of stone floors laid in mortar including stacking of serviceable materil as and disposal of
unserviceable materials with all lead and lift.
Dismentaling tiled of stone floors laid in mortar including stacking of serviceable materil as and disposal of
unserviceable materials with all lead and lift.
The rate shall be for a unit of one Sqm. The work should be done as specified in above item.
Dismentaling of sheet roofing including ridges, Hips, Valleys, Gutters etc. stacking of serviceable materil as
and disposal of unserviceable materials with all lead and lift.(i) G.I.sheet roofing.
Dismentaling of sheet roofing including ridges, Hips, Valleys, Gutters etc. stacking of serviceable materil as
and disposal of unserviceable materials with all lead and lift.(i) G.I.sheet roofing.
The rate shall be for a unit of one Sqm
Dismentling steel work including distempering and stacking the materials with all lead and lift.
Dismentling steel work including distempering and stacking the materials with all lead and lift.
The rate shall be for a unit of one Kg. The work should be done as specified in above item.
Dismentling doors, windows, ventilators etc. (wood or steel) shutters including chowkhats architraves, hold
fasts and other attachment etc. complete and stacking the material within all lead and lift.(i) Not exceeding
Dismentling doors, windows, ventilators etc. (wood or steel) shutters including chowkhats architraves, hold
fasts and other attachment etc. complete and stacking the material within all lead and lift.(i) Not exceeding 3 Sq.M.
The rate shall be for a unit of Each. The work should be done as specified in above item.
Dismentling doors, windows, ventilators etc. (wood or steel) shutters including chowkhats architraves,hold
fasts and other attachment etc. complete and stacking the material with in all lead and lift.(ii) Exceeding
Dismentling doors, windows, ventilators etc. (wood or steel) shutters including chowkhats architraves,hold
fasts and other attachment etc. complete and stacking the material with in all lead and lift.(ii) Exceeding 3 Sq.M. in
The rate shall be for a unit of Each. The work should be done as specified in above item.
Dismentling barbed wire in fencing including making rolls and also including dismentling fencing posts
including all earth work concrete in base and making good the disturbed ground stacking useful materials
as directed and disposing as directed and disposing of the unserviceable materials with all lead and lift.
Dismentling barbed wire in fencing including making rolls and also including dismentling fencing posts
including all earth work concrete in base and making good the disturbed ground stacking useful materials as
directed and disposing as directed and disposing of the unserviceable materials with all lead and lift.
The rate shall be for a unit of Rmt. The work should be done as specified in above item.
Dismentling C.I. pipes G.S.W. pipes abd A.C. rain water pipes with fittings and clamps including stacking
the materials with all lead and lift (for any dia, of pipe)
Dismentling C.I. pipes G.S.W. pipes abd A.C. rain water pipes with fittings and clamps including stacking the
materials with all lead and lift (for any dia, of pipe)
The rate shall be for a unit of Rmt. The work should be done as specified in above item.
Dismantling santtary fittings like wash basin . W.C. pan Indian and Europe an type, flushing tank etc.
including stacking the materials with all lead and lift
Dismantling santtary fittings like wash basin . W.C. pan Indian and Europe an type, flushing tank etc.
including stacking the materials with all lead and lift
The rate shall be for a unit of Each. The work should be done as specified in above item.
Scraping oil paint from steel and other metal surface and making the surface even (with Hand Scraping.)
Scraping oil paint from steel and other metal surface and making the surface even (with Hand
The rate shall be for a unit of Smt. The work should be done as specified in above item.
Removing and scraping of old deteriorated plaster of any thickness from wall / R.C.C member including
stacking of serviceable material and disposal of unserviceable from site of work with all lead and lift
Removing and scraping of old deteriorated plaster of any thickness from wall / R.C.C member including
stacking of serviceable material and disposal of unserviceable from site of work with all lead and lift
The rate shall be for a unit of Smt. The work should be done as specified in above item.
Providing and fixing M.S. fan clamps of shape and size as specified in existing R.C.C. slab including cutting
chase and making good.
Providing and fixing M.S. fan clamps of shape and size as specified in existing R.C.C. slab including cutting
chase and making good.
The rate shall be for a unit of Each. The work should be done as specified in above item.
Cutting out cracks of roof terrace to V-section, cleaning out, wetting, grouting with cement and sand slurry
1:Cutting out cracks of roof terrace to V-section, cleaning out, wetting, grouting with cement and sand
slurry 1:3 (1-cement 3-sand ) (upto 10 ton)
Cutting out cracks of roof terrace to V-section, cleaning out, wetting, grouting with cement and sand slurry
1:3 (1-cement 3-sand ) (upto 10 ton)
The rate shall be for a unit of Rmt. The work should be done as specified in above item.
Cutting out cracks roof terrace to V-Section cleaning out and filling solidly with a hot mixture of
bitumen and clean dry sand (1:1 by weight) (up to 10 ton)
Cutting out cracks roof terrace to V-Section cleaning out and filling solidly with a hot mixture of bitumen and clean
dry sand (1:1 by weight) (up to 10 ton)
The rate shall be for a unit of Rmt. The work should be done as specified in above item.
Item NO. 121 To 124:- The Item as Described in Table.
The Material should be of zindal make and all the aluminium Sections must be anodized. The Design and
Pattern will be as per Instructions of Add.City Engieer. The Unit shall be Measured in Smt.
Providing and fixing of Ridge flashing for roof panel shall be made out of 0.5 mm thick pre coated GI sheet.
The Pre coated sheet shall be of minimum 240 mpa steel grade confirming to IS 14246:1995 and shall have
zinc coating of minimum 120 gsm as per IS:277:1992, 5-7 microns epoxy primer on both side of the sheet
and polyester top coat 15-18 micron. The PP GI Sheet shall have plastic protective guard film of minimum
microns to avoid scratches during transportation. The ridge shall be fixed to the steel members by
poprivetor self drilling/self stitching fastners @ maximum 450mm c/c along length of capping/flashing etc
Providing and fixing of Ridge flashing for roof panel shall be made out of 0.5 mm thick pre coated GI sheet. The Pre
coated sheet shall be of minimum 240 mpa steel grade confirming to IS 14246:1995 and shall have zinc coating of
minimum 120 gsm as per IS:277:1992, 5-7 microns epoxy primer on both side of the sheet and polyester top coat
15-18 micron. The PP GI Sheet shall have plastic protective guard film of minimum 25 microns to avoid scratches
during transportation. The ridge shall be fixed to the steel members by poprivetor self drilling/self stitching fastners
@ maximum 450mm c/c along length of capping/flashing etc complete .
The rate shall be for a unit of Smt
Supplying and fixing vinyl flooring over the surface having 1-2 mm thickness as per directed
by engineer incharge etc as completed (N.S.)
The work should be done as described in Above Table. The
The rate shall be for a unit of Smt
Providing and laying 15mm bamboza wooden flooring as per architect's drawing with
all necessary details as directed by the project consultants. Use underlay for better result
as per Detail specifications and directed by the project consultants. (N.S.)
The work should be done as described in Above Table. The
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 31.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .