| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC 2 2 PLOT NO 29 THACKERAY ROAD KOLKATA 700027 | KOLKATA | KOLKATA | WEST BENGAL | 700027 | ₹4.4 L | L1 | Accepted-AOC 1st Lowest Bidder |
| 2 | L2₹4.4 LRejected-Finance | ₹4.4 L | L2 | Rejected-Finance 2nd Lowest Bidder |
| 3 | L3₹4.5 LRejected-Finance 202 RAM CHANDRAPUR SODEPUR KOLKATA 700110 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700110 | ₹4.5 L | L3 | Rejected-Finance 3rd Lowest Bidder |
Tender Value
₹4.4 L
EMD Value
₹8,784
Closing Date
12 Feb 2026, 5:30 pmClosed
Executive Engineer
Mograhat Drainage Division, P.O. and P.S. - Baruipur, Kolkata-700144
Constn of Height Barrier and installation of sign board on R/B, L/B of Gobindopur RCC Bridge at Ch. 7200 and Malancha RCC Bridge at Ch. 6090 over Adiganga khal in Block Baruipur and Sonarpur within P.S. Baruipur and Sonarpur, S24Pgs.
2026_IWD_999248_11
WBIW/EE/MDD/e-NIT-16(e)/ 2025-26
Open Tender
CIVIL WORKS
10 days
Block Baruipur and Sonarpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹8,784
Yes
20 May 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) With earth obtained from excavation of foundation.
Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction. Single brick flat soling (thickness 75 mm.)
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. Pakur Variety
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. i) For structural members of specified sections weighing less than 22.5 Kg./m
ii) For built up sections / srtuctural members of specified sections weighing not less than 22.5 Kg./m
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : On steel or other metal surface : With super gloss (hi-gloss) - Two coats (white in shade)
Painting block letters or digits in Black Japan or any approved paint as per direction. Size above 2.5 cm. and upto 4 cm.
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts both ways and head load where necessary and depositing the same on embankments, cannels, filling depressions in requisite profile, leveling as per direction of the Engineer-in-charge within a lead of : Beyond 2.00 km and upto 3.00 km Note :- The rate is inclusive of Royalty Charges and Compensation for earth for land owned / arranged by the contractor. Royalty payment certificate in original from competent authority are to be produced along with the bill, otherwise amount due towards Royalty @ Rs. 29.00 / Cum & Cess @ Rs. 5.30 / Cum will be deducted from the bills of works. NB :- Measurement to be taken on the basis of stack measurement / pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
Additional.rar
Additional Documents • 3.83 MB
WB_Form_2911.pdf
Tender Documents • 1.86 MB
BOQ_2447651.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid