Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.9 L+₹8,817.92 (4.82%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.9 L+₹9,786.92 (5.35%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.9 L
EMD Value
₹3,876
Closing Date
12 Aug 2026, 6:00 pmClosed
Executive Engineer REW Baramulla
Executive Engineer REW Baramulla
IRON COVER TO LANDSLIDE AREA FROM AYUSH DISPENSARY TO H/O JAVID AHMAD SYED SAKHI COLONY AND IMPROVEMENT OFAPNA PANCHAYAT GAR NOWSHERA B W7 UNDER ADP (PRI) HALQA NOWSHERA B BLOCK BONIYAR YEAR 2026-27
2026_RDPR_317619_15
154/Xen/Rew/Bla/2026-27 Dated 24/07/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹3,876
28 Aug 2026
24 Jul 2026
13 Aug 2026
24 Jul 2026
12 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade including curing excluding the cost of centring and shuttering. All work upto plinth level with:but 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 1.04 | CUM | 5,733.6 | ₹5,962.94 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 6.9 | SQM | 286.35 | ₹1,975.82 |
| - | 6 mm Cement plaster of mix: 1 : 3 ( 1 cement : 3 coarse sand) | 6.9 | SQM | 241.25 | ₹1,664.63 |
| - | Structural Steel work in single section incl. cutting, hoisting , fixing etc all complete incl. a coat of primer of approved steel primer | 976 | KG | 120 | ₹1,17,120 |
| - | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. | 26.4 | SQM | 131.85 | ₹3,480.84 |
| - | P/fixing of 12mm ply for ceiling | 14.4 | SQM | 750 | ₹10,800 |
| - | Providing wood work in frames of false ceiling, partitions etc. sawn and fixed in position : KD | 0.06 | CUM | 68,000 | ₹4,080 |
| - | Repairing of existing wooden doors/windows incl dismantling where required , replacement of damaged wooden portions refixing , adjustment of shutters, priming and painting etc all complete | 24.3 | SQM | 900 | ₹21,870 |
| - | Providing and fixing of Aluminium fittings of approved quality
Handles 100mm | 20 | NO | 55 | ₹1,100 |
| - | Handles 125mm | 8 | NO | 60 | ₹480 |
stage.html
html • 0.02 MB
finance_1041844.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1041844.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .