Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
10 Jan 2025, 2:00 pmClosed
DGM Purchase ES
DGM Purchase ES, Bharat Electronics Limited (BEL), Jalahalli Bangalore - 560013
Carrying out Geotechnical Investigation at Teressa island in Andaman and Nicobar for CSS Phase II project
2024_BEL_96394_1
BG/ES8/30/2900190045
Open Tender
Miscellaneous Services
Service
Teressa island in Andaman and Nicobar
As per tender
5 documents required · 5 mandatory
₹0
Exempted
16 Jan 2025
28 Dec 2024
11 Jan 2025
28 Dec 2024
10 Jan 2025
28 Dec 2024
Amount
Carrying out 150 mm diameter boring in all soils other than rock upto refusal strata (N>75) for depth from existing ground level upto 10 m
Drilling in rocks of NX size including collection of rock core samples using double tube core barrel for weathered / disintegrated / soft rock (RQD<50%) using Tungsten Carbide bit.
Drilling in rocks of NX size including collection of rock core samples using double tube core barrel for Hard rock (RQD>50%) using Diamond bit.
Conducting following tests for rock samples: a) Unit weight b) Specific Gravity c) Porosity of rock sample d) Unconfined/Uniaxial Compressive Strength (both saturated and at in-situ water content) e) Point load index test (both saturated and at in-situ water content)
Conducting test for soil resistivity measurement using four pole fall of potential (Wenner Method) in the vicinity of the building at specified point at the location of each building (1 set) and recommendations for the type of earthing system as per latest IS-3043 (The measurement shall be done preferably in dry condition at least 72 hours after the last rainfall).
Conducting test for soil resistivity measurement using four pole fall of potential (Wenner Method) in the vicinity of the building at specified point at the location of each building (1 set) and recommendations for the type of earthing system as per latest IS-3043 (The measurement shall be done preferably in dry condition at least 72 hours after the last rainfall).
Mobilisation and Demobilisation of Electrical Resistivity test equipments, personnel and all other machinery, tools, plant and materials including all accessories from the site etc., as directed by the Engineer-in-charge.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .