Loading…
Loading…
Tender Value
₹6.5 L
EMD Value
₹8,100
Closing Date
1 Sept 2026, 6:00 pm
RAVI RANJAN
KEDLA WASHERY
Loosening head drum lagging, gear box maintenance along supporting platform with safety fence rectification of unit no. 123 belt conveyorAnd rectification of damaged tail frame of 213 Chain Conveyor of KW
2026_CCL_364167_1
PO/KW/E-Tender/26-27/23, Date- 22.08.2026
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
KEDLA WASHERY
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,100
Yes
22 Aug 2026
22 Aug 2026
2 Sept 2026
22 Aug 2026
1 Sept 2026
22 Aug 2026
22 Aug 2026 - 27 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A. Loosening/dismantling & vulcanized head drum lagging, gear box maintenance along with guide channel arrangement rectification & supporting platform with safety fence rectification of unit no. 123 belt conveyor. (a) Dismantling of conv. belt+gear box+head drme+takeup arrangement.=7.078+4.158+2.096+8.860=22.192MT | 22.19 | MT | - | - |
| 2 | (b) Shifting of Iron & steel items at site belt and Shifting of old & scrap items to scrapyard. | 12.84 | MT | - | - |
| 3 | (c) Dismantling of old 40% of new(3.556MT)=1.422MT | 1.42 | MT | - | - |
| 4 | (d) Fabrication & Erection of iron & steel items. | 3.56 | MT | - | - |
| 5 | (e) Installation and alignment of conv. belt+gear box,head drum, take-up arrangement after work as above said work.-7.864+4.158+2.096+8.860=22.978MT. | 22.98 | MT | - | - |
| 6 | B. Rectification of damaged tail frame (non-drive) arrangement along with replacement of worn-out chain link assly. tail & head sprocket assly. bottom & side liner plate, bottom & top runner with mother angel of unit no. 213 chain conv. (a) Shifiting of new chain link assly. + head & tail spkt assly. +tail frame arrangement materials. (2.360+1.268+3.106+4.693)=11.427 MT and Shifting of old to scrapyard.(2.539+3.119)=5.658MT | 17.09 | MT | - | - |
| 7 | (b) Assembling of chain link assly. And chain link lining and Installation of chain link assly.+ H&T spkt. Assly. 2.36+3.628=5.988MT | 5.99 | MT | - | - |
| 8 | (c) Dismantling of chain link and H & T spkt assly. 70%bof new (3.628MT)=2.539MT | 2.54 | MT | - | - |
| 9 | (d) Dismantling of liner & plate and tail frame arrangement 40% of new (7.799MT) (4.693+3.106)=7.799 | 3.12 | MT | - | - |
| 10 | (d) Fabarication & erection of liners & plate and tail frame arrangement. | 7.8 | MT | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.28 MB
BOQ_377075.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].