Loading…
Loading…
Tender Value
₹84.8 L
EMD Value
₹1.7 L
Closing Date
6 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
ENGINEERIN
14 conditions · 3 needing a document upload
"The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V=Advertised value of the tender in crores of Rupees N=Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of ""total contractual payments"" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIIB (as per standard tender document), along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet. (As per Rly. Board letter No. 2022/CE-I/CT/GCC-2022/Policy dated 14.07.2022, advanced correction slip No. 1)."
Tenders costing more than 50.00 Lakhs:- As a proof of experience/competency, The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
Similar Nature of Work: CTR/ TRR/TFR/TTR including raising of track, screening, distressing of track, pre & post works for track maintenance machine like tamping machines/ballast screening/regulating machines & TTR by T-28.
16 conditions · 5 needing a document upload
Tenderers are required to upload self-attested/digitally signed scanned copy of eligibility documents such as mandatory credentials, affidavit, partnership deed, power of attorney, PAN, GST/TIN Firm/Company registration/MOA/MOU/AOA etc.
The Bid Security shall be deposited either in cash through e- payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. (Annexure-VII-A).
In case, submission of Bid Security in the form of Bank Guarantee, following shall be ensured: (i) A scanned copy of the Bank Guarantee shall be uploaded on e-Procurement Portal (IREPS) while applying to the tender. (ii) The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids. (i.e. excluding the last date of submission of bids. (iii) Non submission of scanned copy of Bank Guarantee with the bid on e- tendering portal (IREPS) and/or non submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid. (iv) The Tender Security shall remain valid for a period of 90 days beyond the validity period for the Tender. (v) The details of the BG, physically submitted should match with the details available in the scanned copy and the data entered during bid submission time, failing which the bid will be rejected (vi) The Bank Guarantee shall be placed in an envelope, which shall be sealed. The envelope shall clearly bear the identification "Bid for the ***** Project" and shall clearly indicate the name and address of the Bidder. In addition, the Bid Due Date should be indicated on the right hand top corner of the envelope. (vii) The envelope shall be addressed to the officer and address as mentioned in the tender document. (viii) If the envelope is not sealed and marked as instructed above, the Authority assumes no responsibility for the misplacement or premature opening of the contents of the Bid submitted and consequent losses, if any, suffered by the Bidder. (Annexure-VII-A, as per attached standard tender documents & Annexure-VI-A of GCC-2022).
Tenderers are advised to submit self-attested/digitally signed copy of Bank particulars i.e. Bank name, Bank Account No. IFSC code as per Annexure-XII of Tender Document for any smooth transactions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderers are not required to submit uploaded Tender document which has uploaded for the information & knowledge of Tenderers. (2) Tenderers are advised to check the Tender Schedule Items, conditions/eligibility criteria etc. before quoting the rates for E- Tendering. (3) No post tender correspondence for submission of additional documents shall be entertained after opening of the Technical & Commercial offers. Even suo-moto post tender letters of the tenders shall be treated as NULL & Void. (Authority: - HQ/NR Letter No. 74-W/0/Pt. XXV/WA/Loose Dated: 07.04.2015.
Tenderers are advised to make workers wage/salary payment through workers bank account to ensure making payment during the wage period in Railway's Shramik Kalyan portal.
All latest and up to date Correction slips of General Conditions of Contract (GCC)-April-2022 and Standard Tender Document (STD)- 2022 Shall be applicable.
Improvement of track in yards and block section to ensure track safety to avoid track circuit failures in the section of SSE/Pway/RPJ & DOA under ADEN/RPJ.
OT-159-UMB-2026-27~NR
OT-159-UMB-2026-27
Open
Works - General
9 Months
Ambala, Haryana
₹0
₹1.7 L
15 Sept 2026
15 Sept 2026
22 Sept 2026
15 items across 2 schedules · ₹75,39,477.13 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | 1 in 8½ Points & Crossing | Set | 25.00 | 15,402.34 | 3,85,058.5 |
| 2 | 1 in 12 Points & Crossing | Set | 10.00 | 20,972.17 | 2,09,721.7 |
| 3 | Lifting and packing for regrading the existing PSC sleeper track to required height / level in stages not exceeding 75mm or part thereof at a time, providing permissible ramp for the track, insertion of moorum / sand / stone ballast uniformly under the existing track and placing the same to safe approved gradient, gauge, cushion including levelling and one round of through packing to allow train movement at restricted speed of 30 kmph for a specified length with all leads & lifts and fixing, marking, painting rail level pegs at every 30m interval. Note: Lifting of track shall be done in stages as per procedure prescribed in latest edition of IRPWM to get the proposed final level as per approved working profile, as directed by Engineer in-charge. | TRM | 3000.00 | 205.4 | 6,16,200 |
| 4 | Extra for additional lift over 75mm for every 50mm lift or part thereof up to 275mm for item nos. 083010 for each TRM. | TRM | 3000.00 | 31.9 | 95,700 |
| 5 | Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. | TRM | 20000.00 | 30.19 | 6,03,800 |
| 6 | For PSC Sleeper | TRM | 8500.00 | 102.65 | 8,72,525 |
| 7 | For PSC sleeper Track with Sleeper Density of 1540 sleepers/Km or more | TRM | 5730.00 | 204.34 | 11,70,868.2 |
| 8 | Cleaning of side drains along the track including disposing of muck beyond Railway boundary as per instructions of Engineer in-charge to keep drains clean and clear in cuttings etc. | RM | 10000.00 | 37.15 | 3,71,500 |
| 9 | Removing weeds & bushes in ballast section and cess up to 3.95m from centre line of track in mid section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. | TRM | 100000.00 | 17.1 | 17,10,000 |
| 10 | Carrying out ancillary works required for UTV working under line block i.e., turning of rails/ Sleepers and keeping in position for fixing of UTV clamps to rail, keeping rails/PSC Sleepers in position while loading into BFR, removal of clamps on BFR for releasing loaded rail/Sleepers, adjusting of rails/Sleepers on BFR etc. by providing minimum of three men in a shift of 8 hours, with all contractor's tools, all lead, lift, crossing of tracks etc., complete and as directed by the engineer - in - charge. Note: In case, contractor provides less no. of Labour, payment will be deducted for each such person @ 2/3 rd of the accepted item rate. | Shift | 60.00 | 2,637.34 | 1,58,240.4 |
| 11 | Sleeper Spacing, Re-spacing / Squaring of sleeper by Hydraulic Sleeper Spacer with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Hydraulic Sleeper Spacer shall be as per RDSO's Specification No. TM/SM/17, dated 31.03.1992. | Each | 3281.00 | 83.43 | 2,73,733.83 |
| Schedule total | ₹64,67,347.63 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
NIT-25-UMB-26-27.pdf
ATTACHMENT
AdcanceCorrectionslips1234567891011andMasterPolicyforDisputeRedressal.pdf
ATTACHMENT
AdvanceCorrectionSlipofGCC-2022PartII.pdf
ATTACHMENT
SpecialGeneralConditionsforTrackwork.pdf
ATTACHMENT
MinimumManpowerResourcesforP.wayActivitywisePWAYLABOURFORTRTBCMPQRS.pdf
ATTACHMENT
SafetyInstructionatWorksSite.pdf
ATTACHMENT
SpecialconditionSrDEN-4.pdf
ATTACHMENT
TNN-25B-WorksDSR-UMB-2026-27.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .