| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Fee/PreQual/Technical/Finance | -42.60% | ₹4.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.5 L+₹4,661.15 (1.05%)Admitted-Fee/PreQual/Technical/Finance | -42.00% | ₹4.5 L+₹4,661.15 (1.05%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.8 L+₹36,823.07 (8.26%)Admitted-Fee/PreQual/Technical/Finance R O BOGDANG | -37.86% | ₹4.8 L+₹36,823.07 (8.26%) | L3 | Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 4 | L4₹4.9 L+₹41,950.33 (9.41%)Admitted-Fee/PreQual/Technical/Finance | -37.20% | ₹4.9 L+₹41,950.33 (9.41%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹5.2 L+₹72,247.80 (16.2%)Admitted-Fee/PreQual/Technical/Finance R O HAGNIS | -33.30% | ₹5.2 L+₹72,247.80 (16.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.8 L
EMD Value
₹15,540
Closing Date
11 Jul 2026, 4:00 pmClosed
Xen RnB Division Kargil
Xen RnB Division Kargil
Constt of Entrance Gate and preperation of model plot at MOCN Kurbathang Kargil(BY WAY OF BALANCE WORK) (Under MIDH)
2026_PWD_19170_1
E tender 17 of 2026-27 PW RnB Division 2nd Kargil
Open Tender
Civil Works - Others
Percentage
30 days
Kargil
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Xen RnB Division Kargil
₹15,540
14 Jul 2026
8 Jul 2026
13 Jul 2026
8 Jul 2026
11 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or dash fastener shall be paid for seperately) 1st class kail wood | 2.9 | cum | 0.2 | ₹0.58 |
| 2 | Preparing newly prepared panneled surface for polishing by way of filling of putty , sealer and sand papering rubbing and applying hard polish,glossy polish in sequance over the prepared surface complete job | 230.99 | sqm | 0.9 | ₹207.89 |
| 3 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required | 22.33 | sqm | 0.9 | ₹20.1 |
| 4 | Excavation work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-0in-charge. all kind of soil 100% | 8.49 | cum | 0.9 | ₹7.64 |
| 5 | 4) MASS CONCRETE: Providing and laying mass concrete1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) in Below Ground and Above Grouns Plinth retaining walls, (any thickness) including attached pilasters, including curing but excluding the cost of centring, shuttering and finishing with. (code 4.4.5) | 16.98 | cum | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for beams ,lintel beams etc | 44.59 | sqm | 0.9 | ₹40.13 |
| 7 | Providing hoisting and fixing trusses/purlins/rafters/posts/post plates or like
components of 1st class budloo/fir wood including cost of screws etc complete. | 1.47 | cum | 0.2 | ₹0.29 |
| 8 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required | 14.88 | sqm | 0.9 | ₹13.39 |
| 9 | Providing and fixing precoated galvanised steel sheet roofing accessories 0.50mm(+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screwscomplete :Ridges plain and eaves boarding and weather boarding(500 - 600mm | 18.29 | rm | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_45646.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .