Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93,139.46Accepted-AOC AMBATTUKULAM NEDUMPARA ROAD MAINTENANCE GENERAL CIVIL WORK | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SALIMKUMAR K K L1 |
|---|---|---|---|---|
| 1.00Additional facilities | ||||
| 1.00 | OD291039/2024-2025:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch ofcorrugation as approved by Engineer-in-charge) 0.35 mm (+0.05%), total coatedthickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side. of the sheet and polyester top coat 15-18 microns.Sheet should have protective guard film of 25 microns minimum to avoid scratchesduring transportation and should be supplied in single length upto 12 metre or as desiredby Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws ofsize (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical orcurved surfaces, excluding the cost of purlins, rafters and trusses and including cutting tosize and shape wherever required. | 15.2 | sqm | 663.32 ₹10,082.46 Lowest |
| 1.00 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 76 | kg | 132.59 ₹10,076.84 Lowest |
| 1.00 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 206 | kg | 170.67 ₹35,158.02 Lowest |
| 1.00 | 22.6:Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured) | 55.5 | sqm | 681.48 ₹37,822.14 Lowest |
Tender Value
₹84,672
EMD Value
₹2,117
Closing Date
20 Aug 2025, 11:00 amClosed
AE LSGD PURAPPUZHA
O/o AE LSGD PURAPPUZHA
Retender Annual Plan-220/24-25 Purapuzha G P-maintanance of Shanthigiri Anganwadi-General Civil Work
2025_LSGD_724688_7
05/AE/2024-25
Open Tender
Civil Works - Buildings
Item Rate
240 days
PURAPPUZHA
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹2,117
Yes
3 Nov 2025
11 Aug 2025
21 Aug 2025
11 Aug 2025
20 Aug 2025
11 Aug 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .