| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 CrAccepted-Finance | ₹9.9 Cr | L1 | Accepted-Finance Lowest Bidding |
| 2 | L2₹10.0 Cr+₹4.7 L (0.47%)Accepted-Finance | ₹10.0 Cr+₹4.7 L (0.47%) | L2 | Accepted-Finance Higher Bidding |
Tender Value
₹10.0 Cr
EMD Value
₹10.0 L
Closing Date
1 Apr 2025, 4:00 pmClosed
EE Dumporijo Division, PWD
Office of the EE Dumporijo Division, PWD
C/o Township Road at Segi-Gusar Circle HQ in Upper Subansiri District, Arunachal Pradesh.
2025_PWDAP_2399_1
DB-12/e-NIT/CRIF/2024-25/05
Open Tender
Civil Works
Item Rate
Upper Subansiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
EE Dumporijo Division, PWD
₹10.0 L
4 Apr 2025
21 Mar 2025
4 Apr 2025
21 Mar 2025
1 Apr 2025
21 Mar 2025
Amount
SH:- Trace Cutting
Excavation in soil by Manual Means (Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto 1000 metres).
SH:- Jungle Cutting
Clearing and Grubbing road land (clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness)
By Manual means:-
In area of Area of thorny jungle
Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of Trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit).
Girth from 300mm to 600mm
Girth from 600mm to 900mm
Girth from 900mm to 1800mm
SH: WIDENING
Excavationin Hill Area in Soil by Mechanical Means (Excavationinsoil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavationin hilly areain ordinaryrock notrequiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres
SH:- Formation Cutting
Excavationin Hill Area in Soil by Mechanical Means (Excavationinsoil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavationin hilly areain ordinaryrock notrequiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres
SH:- Preparation of (SUB GRADE)
Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50m.)
SH:- SUB-BASE COURSE (GSB)
Granular Sub-Base with coarse graded material (Table:- 400-2) (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) for grading - 1 Material.
SH:- CC Pavement
Dry Lean Cement Concrete Sub- base (Constructionof dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blendingto be as per table 600-1,cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishingand curing.)
Cement Concrete Pavement (Construction of un-reinforced,dowel joint,plain cement concrete pavement over a prepared sub base with 43 grade cement @400kg per cum,coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not execeeding 25mm,mixed in a batching and mixing plant as per approved mixed design,transported to site ,laid with a fixed form or sliped form paver, spread ,compacted and finished in a continuose operation including provision of contraction ,expansion,construction and longitudinal joints,joint filler,separation membrane,sealant primer,joint sealant,debonding strip,dowel bar,tie rod,admixture as approved,curing compound,finishing to lines and grade as per drawing)
SH:- RCC Slab Culvert 1.5mtr. Span (6 nos)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material).
I Ordinary Soil
A Manual Means
(i) Upto 3m Depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days).
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. (b)Random Rubble Masonry
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical speicifications.
PCC Grade M20 (P) Height upto 5Mtr
Furnishing and placing Reinforced / Prestressed cement concrete in super-structure as per drawing and Technical Specification.
RCC Grade M20
Using Concrete Mixer
For solid slab super-structure, 20-30% of (a+b+c)
Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications.
Centering and shuttering including strutting proping etc and removal of form work for : (b) Suspended floors, roofs, etc.
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall/return wall with 100mm dia AC pipe, extending through the full width of the structure with slope of IV : 20H towards drawing foce. Complete as per drawing and Technical specifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
Granular Material
SH:- Kutcha Drain ( L=3369.50 mtr)
Excavationin Hill Area in Soil by Mechanical Means (Excavationinsoil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres
SH:- CC Drain-II Size 60x45x60mtr (for 130.5Mtr Length)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Ordinary Soil
Manual Means
Upto 3m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days).
PCC 1:1.5:3 Providing and laying cement concrete 1: 1.5: 3(1 cement: 1.50 coarse sand :3 stone aggregate 20mm nominal size ) excluding the cost of centering and shuttering in: (a) Foundation and plinth.
centering and shuttering including strutting proping etc.and removal of form work for:(b) wall including attached buttresses,pilasters etc.
12 mm Pastering with cement motor 1:3 (1: cement : 3 find sand)
SH:- R/wall 3.50m Height
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Ordinary Soil
Manual Means
Upto 3m to 6m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days).
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
Random Rubble Masonry
Dry rubble Flooring
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
Granular material.
SH:- B/wall 3.50m Height
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Ordinary Soil
Manual Means
Upto 3m to 6m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days).
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
Random Rubble Masonry
Dry rubble Flooring
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
Granular material.
M/s TD Trade Centre (BID ID -7153)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_2564.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
166494888.xls
BOQ Document • 0.34 MB
166494889.pdf
Tender Document • 0.14 MB
SBD.pdf
Tender Document • 10.40 MB
166494891.html
Tender Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .