GENERAL MANAGER (M&C)
BI-ANNUAL RATE CONTRACT OF PROVIDING SECURITY, VIGILANCE & FIRE SERVICES AT GIPCL-BARODA PLANT FOR A PERIOD OF TWO YEARS
290006
MAT/MM/SECURITY ARC/GIPCL/2026-28
Open
Security System / Service
Works
Vadodara
₹2,950
IN favor of Gujarat Industries Power Co. Ltd. and payable at Vadodara
₹1.6 L
25 Mar 2026
25 Mar 2026
25 Mar 2026
15 Apr 2026
25 Mar 2026
Estimated cost of Tender as per SOR
(Rupees Two Crore Fourteen Lakhs Twelve
Thousand Four Hundred Thirty nine and
Paise Sixty four only)
On or before due date 15.04.2026 during office
Submission of EMD, Tender fee and
hours at Gujarat Industries Power Company
other supporting documents for
Limited. P.O. Ranoli, Dist: Baroda
Technical Bid in physical form.
It is prerequisite and necessary for all prospective bidders to visit the GIPCL-Baroda
site location after downloading the tender copy from website: https://www.nprocure.com or
https://gipcl.nprocure.com or www.gipcl.com to understand the actual working conditions,
compliance related to Labour, safety etc. before submitting their offer either, failing which,
any consequential liabilities arising will be to bidder’s account.
1. Amendment / corrigendum of the tender document, forms, schedules, etc. may be done
any time by the GIPCL during the period of publication of tender in the website. The Bidders
are required to visit the website regularly till the last date & time of Bid submission.
2. GIPCL reserves the right to reject any or all the tenders without assigning any reason
3. The Bidders are required to quote the rate strictly as per the schedule of quantities & rates
and conditions mentioned in the tender document, adhering to scope of work, General
terms & conditions and special conditions of contract as well.
4. The Bidders are required to submit their Bids online only through the website
https://www.nprocure.com
5. The EMD & other supporting documents are to be submitted in physical form only at
the following address:
GENERAL MANAGER (M&C)
Gujarat Industries Power Company Limited
P.O. Ranoli-391350,
Dist: Baroda (Gujarat)
Phone Nos.: (Direct) 2234252, EPABX (0265) 2232768, 2232213,
Extn: 4252, E-Mail: purchase @gipcl.com
PLEASE NOTE TH AT PHYSICAL COPY OF ALL THE ABOVE DOCUMETS
SHOULD REACH TO GIPCL LATEST BY 1 7.30 PM ON DUE DATE OF TENDER .
INSTRUCTIONS TO BIDDERS
1. PLANT SYNOPSIS
Gujarat Industries Power Company Limited (GIPCL) (henceforth be named Company/GIPCL), is a
Premier Power Utility in the State of Gujarat with an installed capacity of 1184.4 MW comprising of
various conventional and renewable projects. GIPCL commissioned its first power project; a
MW gas based combined cycle power plant in 1992 at Vadodara. It expanded its capacity 165 MW
Naptha and gas based Combined Cycle Power Plant at Vadodara in
Surat Lignite Power Plant (SLPP) with four units of 125 MW capacity each is located at Village:
Nani Naroli, Taluka: Mangrol, District: Surat in Gujarat. It commissioned 5 MW solar power station
at SLPP in 2012. Also, GIPCL has commissioned 1MWp Distributed Solar Power Projects at two
locations in Gujarat viz. at Village: Amrol, Dist.: Anand and at Village: Vastan, Taluka Mangrol,
Dist.: Surat. GIPCL has successfully commissioned a 2 x 40 MW Solar Project in 2017 as well as
a 75 MW Solar Power Project in 2019 at Gujarat Solar Park, Village Charanka, Dist.: Patan. GIPCL
has also successfully commissioned 112.4 MW wind farms at different location of Gujarat.
The Company has commissioned the 100 MW Solar Project at the Raghanesda Solar Park,
Banaskantha, Gujarat on 10.08.2021. The Company has also been allotted land for development
of a 2375 MW Renewable Energy
The Company intends to award Bi-Annual Rate Contract for Security, Vigilance and Fire services
for a period of Two years for its BARODA PLANT and is therefore inviting open tenders online
through www.nprocure.com from experienced & resourceful contractors.
2. SCOPE OF WORK
2.1 The scope of work entails providing comprehensive security, vigilance, and fire safety
services at GIPCL-Baroda Plant , Gujarat. The services include security operations,
vigilance, firefighting, and the management of security apparatus, with a primary focus on
ensuring overall security and fire safety services.
2.2 The Contractor will be responsible for all functions related to security, vigilance, and
firefighting, as well as any additional duties deemed necessary to enhance the safety and
security of the site. The area of services may increase or decrease to any extent depending
on the changing requirements of the project.
2.3 The Contractor must provide 24/7 security services as directed by the GIPCL (Gujarat
Industries Power Company Limited) officials. In the event of any shortage in the number of
security guards, it is the Contractor’s responsibility to promptly replenish the required
security personnel, ensuring that no site or post is left unattended at any time. The
Contractor acknowledges that the total number of security staff may vary based on different
factors, and they will be required to adjust the manpower accordingly, as directed by GIPCL
management with a 24-hour notice.
2.4 The Contractor must quote for both the minimum and maximum number of security
personnel they can provide on demand within 24 hours, ensuring they can meet GIPCL’s
security needs as required.
2.5 Please refer the detailed scope of work given in Section D.
(a) The bid submitted by the bidder not covering the total scope of work and services as
detailed out in the tender document shall be liable for rejection.
(b) Quantum of job mentioned against all items in the price bid are indicative only & may
vary as per site requirement & not to be construed as maximum or guaranteed quantity.
The quantities shown in the price bid are approximate quantities for the contract period
and they may vary as per job requirements.
(c) All the miscellaneous activities pertaining to specific work to be executed for satisfactory
performance is in the scope of contractor in his quoted rates.
3.1 The day to day inspection for the work regarding Security, Vigilance and Fire services shall
be done by the GIPCL's Authorized Officer at site.
3.2 The Bidder's representative will visit to the GIPCL's premises every day to check the
performance of Security, Vigilance and Fire services.
3.3 The Bidder's senior Executive shall visit periodically to the GIPCL premises and note down
the problems reported by the GIPCL’s Authorized Officer and resolve the same within
stipulated time.
4. PLANT VISIT:
4.1 It is perquisite and necessary for all interested Bidders to visit the Site/plant after
downloading the tender copy to understand the actual working conditions, compliance
related to labour, safety etc. before submitting their offer. Failing which, any consequential
liabilities arising will be to Bidder’s account. The Bidders shall examine the Site of work and
its surroundings at his own responsibility. The Bidders shall collect information that may be
necessary for preparing the bid and entering into a contract. All costs and liabilities arising
out of the Site visit shall be at Bidder’s account.
4.2 The Bidder is deemed to have examined and understood the tender document, obtained
his own information in all matters whatsoever that might affect the carrying out the works
expressly mentioned or works which may have to be carried out to fulfil his contractual
obligation within the scheduled rates and to have satisfied himself to the sufficiency for his
4.3 The submission of tender by a Bidder implies that he has visited the Site and read these
instructions, conditions of the contract etc. and has himself aware of the scope, nature of
works & specifications of the works to be done, General & Special Terms and Condition.
GIPCL will not, therefore after acceptance of Bidder’s rate, pay any extra charges for any
other reason in case the Bidder is found later on to have misjudged the Site conditions.
4.4 Any error in description or quantity or omission in the contract document shall not vitiate the
contract or release the Bidder from executing the work comprised in the contract according
to scope of works, magnitude of the works, requirement of materials, equipment, tools&
tackles, workforce, etc. Bidder has to complete the work in accordance with the contract
documents irrespective of any defects, omissions or errors that may be found in the contract
4.5 BIDDER shall inspect the Site, examine and obtain all information required and satisfy
himself regarding matters such as access to Site, communication, transport, working
condition including constraint of work place, confined area, quantum of dusting, running
equipment, importance of work, round the clock working conditions, safety requirements,
associated risks, right of way, high flood level in River, flow of water during monsoon/dry
season in the River/Nallah, the type and number of equipment and facilities required for the
satisfactory completion of work, the quantity of various items of the work, the availability of
manpower at Site, availability and rates of material, local working conditions, uncertainties
of weather, obstructions and hindrances that may arise, etc which may affect the work or
cost thereof, before submission of his Bid. Ignorance of Site conditions shall not be
accepted by GIPCL as basis for any claim for compensation. The submission of a Bid by
the Bidder will be construed as evidence that such an examination was made. Any later
claims / disputes in regard to rates quoted shall not be entertained or considered by the
4.6 The rates quoted by Bidder shall be based on his own knowledge and judgment of the
conditions and hazards involved and shall not be based on any representations of the
employee(s) of the company.
5. ELIGIBILITY CRITERIA
The following criteria shall be adopted for qualifying the Bidders for further proceeding.
5.1 Bidder should possess minimum Three years of experience during last five years in similar
nature job in power plants / process industries/ Renewable Parks/Corporate Parks/Industrial
Parks. Bidder shall submit necessary evidence for the same like attested copies of work
orders /work completion certificates from clients where the work was completed. The work
completion certificate shall comprise of Order value & Executed value. Bidders should have
executed the work directly. The work executed as a sub-Bidder or subletting agency shall
not be taken in to consideration.
5.2 Bidder should produce evidence of having experience of successfully completed similar
works as defined hereunder during last five years ending on last day of the month previous
to the one in which tender is invited, satisfactory progress of ongoing works etc. secured
from clients along with self-attested copies of documentary evidence preferably photo
copies of work experience. The experience should be either of the following:
One similar completed/executed work each costing not less than the amount equal to Rs.
Lacs excluding GST.
Two similar completed/executed works each costing not less than the amount equal to Rs. 43 Lacs
Three similar completed/executed works each costing not less than the amount equal to Rs.
Lacs excluding GST.
Bidder should specifically mention fulfilling of above criteria in his offer along with details of work
orders & work completion/execution certificates issued by clients.
5.3 Tender fee: The Tender Fee of Rs. 2950.00/- Rupees Two thousand Nine Hundred and
Fifty only) shall be accompanied in form of RTGS.
5.4 EMD: The EMD of Rs. 1,61,000/- (Rupees One Lakh Sixty-one Thousand only) shall be
accompanied in the form of DD/RTGS or Bank Guarantee given by Bank as described in
subsequent clause no.
5.5 Bidder should have separate Employees Provident Fund code number towards registration
of firm with RPF commissioner.
5.6 Attested copies of relevant documents duly signed & sealed on each & every page shall be
submitted. GIPCL may verify the documents, experience certificates issued by concern
authority. After opening of technical Bid, if any required attested documents are found
missing in the Technical Bid submitted by the Bidder, the tender inviting authority may
inform to that Bidder by E-mail to submit the missing required documents within stipulated
time limit. If Bidder/Bidders fail to submit them within stipulated time, their Bid will be
declared technically disqualified and no further correspondence will be entertained.
5.7 Bidder should have average annual turnover of Rs.38 lacs for each of last three financial.
Year FY 2024-25,2023-24,2022-23. Bidder shall furnish annual audited financial statement
duly certified by a qualified Chartered Accountant for the last three financial years to
demonstrate the financial healthiness of the company. The Balance Sheet and Profit & Loss
Account must be in the name of the company. Any type of MOU for this purpose will not be
Note: In case, the annual turnover is less than the statutory guideline which does not require audit,
the Bidder shall submit the turnover certificate from a Chartered Accountant.
5.8 The Bidder has to submit INCOME TAX Permanent Account Number (PAN), & GST
registration number. Copies of the same shall be submitted.
5.9 The net worth of the Bidder should be positive as evidenced from audited accounts of last
financial year.
5.10 In case Bidder is a Consortium/Joint deed of undertaking of company, the above
requirements/credential of consortium leader/Bidder shall be considered unless otherwise
specifically mentioned in the tender.
5.11 If Bidder or its Partner(s) or Director(s) is /are/was Black Listed / Deregistered / Stopped or
banned from dealing in the past by any Govt, of Gujarat Undertakings / Depts. / Authorities
and Govt. of Gujarat supported companies / undertakings / organizations, Bid of that party
may be liable to be rejected. Bidder agrees and undertakes to accept decision of GIPCL in
this regard as final and binding on the Bidder without any demur and that no further
correspondence shall be done in this regard at any stage. Bidder shall have to submit
“Declaration for Contractual Litigations” as amended in Annexure / Form attached.
The Bidder should have minimum 10 ex-servicemen working under their payroll. A proof in
this regard should be produced, along with technical bid. Before awarding the contract, it
will be ensured that the agency is having the capacity to post required ex-serviceman for
security duties. Work Order & performance certificates from 3 different clients where more
than 15 ESM guards have been provided should be furnished.
5.12 Bidder shall have to submit the “Declaration-cum-Undertaking for Compliance of Safety
Laws and Regulations” as amended in Annexure / Form attached.
• If any Major Violation of any safety law(s) / Rule(s) is / are found during the preceding
Three (3) years, Bid of that party will be liable to be rejected. Bidder agrees and
undertakes to accept decision of GIPCL in this regard as final and binding on the
Bidder without any demur and that no further correspondence shall be done in this
regard at any stage.
• If any of the details submitted in the prescribed Annexure / Form to the Bid is/are
found to be false, incorrect at any time in future, then the Contract awarded to that
Bidder / Bidder shall be liable to be terminated forthwith without any notice /
correspondence and Bidder agrees and undertakes to accept decision of GIPCL in
this regards as final and binding on the Bidder without any demur and that no further
correspondence shall be done in this regard at any stage. Further, Performance /
Security Deposit will also be liable to be forfeited. Any dues to GIPCL from the Bidder
/ Bidder shall be recovered from the pending bills or any other dues payable to the
Bidder / Bidder, if any or otherwise through any other recourse available under the
The Bidder shall submit all the evidences, documents, attested copies of work orders &
work completion certificates etc. as a proof with EMD &Tender Fee and also provide the
requisite details online for meeting the prequalification requirements. GIPCL will verify the
experience, performance, capability & strength of Bidders, independently for executing the
job. GIPCL may visit the Site & consult the owner of the industry/property where similar job
is executed by the Bidder. GIPCL reserves the right to accept/cancel/reject any/all Bids
without assigning any reason thereof. The tenders of qualified Bidder/Bidders shall only be
considered for further evaluation.
6. LANGUAGE OF BID
The Bid prepared by the Bidder, and all correspondence and documents relating to the Bid
exchanged by the Bidder and the Company, shall be written in the English language. Any printed
literature furnished by the Bidder, written in another language shall be accompanied by an English
translation for the purpose of interpretation of the Bid.
7. EARNEST MONEY DEPOSIT (EMD) and TENDER FEE
7.1 An EMD of Rs. 1,61,000/- (Rupees One Lakh Sixty-one Thousand only) and Non-
refundable Tender fee Rs. 2950/- shall accompany with Bid. Tender fee shall be
submitted through on-line mode only while EMD shall be submitted through RTGS / on line
mode/ in the form of a crossed bank Demand Draft in favor of Gujarat Industries Power Co.
7.2 The EMD shall be submitted in the form of DD/irrevocable Bank Guarantee in favor of
Gujarat Industries Power Company Limited from any Schedule Public Sector Bank or
Schedule Private Sector Bank as per Performa of BG enclosed with this e-tender under
Bank for EMD DD Payable at :
Bank Name- Indian Overseas Bank
Branch- Jawahar Nagar
IFSC Code- IOBA0000473
Beneficiary Name- Gujarat Industries Power Company Limited
Also, EMD & Tender Fee may be submitted through online payment gateway of company’s
website: www.gipcl.com (online Payment Form) as per detail provided in Section-F
(Annexure-D) herein under.
7.3 In case EMD is paid in the form of BG, the same shall be valid for a period of 180 days after
the due date for submission of the bid.
7.4 The EMD of the successful Bidder will be returned after payment of Security Deposit by
successful Bidder.
7.5 The earnest money deposit will be refunded to the unsuccessful Bidder as soon as the
tender is finalized and after award of LOI/Work Order.
7.6 Any bid not accompanied with EMD and Tender fee will be rejected. Tender fees and EMD
should be submitted to GIPCL.
7.7 No interest shall be payable on EMD.
7.8 The EMD will be forfeited if the Bidder (i) withdraws his tender after acceptance or (ii)
withdraws his tender before the validity date of the tender.
7.9 Schedule of EMD & Tender Fees
EMD & Tender fee and other Address for Submission:
documents dully signed to be General Manager (M&C)
submitted in physical form on or Gujarat Industries Power Company Limited
before due date of closing of the PO Ranoli, Vadodara
tender Phone No (0265) 2232768, 2232213,
E-Mail: [email protected]
The envelope shall be clearly marked with “Tender Documents for “Bi-Annual Rate Contract Of
Providing Security, Vigilance & Fire Services At GIPCL-BARODA PLANT..”
8. SUBMISSION OF BIDS
A: MODE OF SUBMISSION
The bids shall be submitted online at the e-portal system within the dates specified in the NIT along
with the details of Tender Fee, EMD in two parts as under:
(a) Pre-qualification and Techno-commercial Bid without price.
(a) Pre-qualification and Techno-commercial Bid without price:
The tender document duly signed in all pages without price bid along with Techno commercial
deviations, if any, shall accompany the bid. The following Information shall be provided in the
techno commercial bid:
I. Qualification and experience of Site in-charge. (If applicable)
II. Schedule of deviation (Annexure-G) Technical as well as commercial, if any.
III. Qualification & experience of Field Supervisors/Field Officers.
The following supporting documents shall also be submitted along with EMD & Tender Fee in
i The tender documents duly signed in all pages without price bid along with techno-
commercial deviations, if any.
ii Proof of experience meeting the minimum eligibility criteria as mentioned in tender
iii Performance certificate issued by clients.
iv Previous work order copies.
v Details of present work order (if any)
vi Turn over for the last three years, audited annual accounts/financial statements i.e.
profit and loss account and balance sheet duly certified by a practicing CA will be
vii P.F Number and Allotment Letter.
viii PAN Number.
ix Goods & Service tax registration number/certificate copy.
x e-Auction USER ID generated on nProcure website-
https://eauction.nprocure.com.
1. Price Bid shall be submitted only in soft form through e- portal system.
2. Note: Estimate includes cost of all manpower, supervision, equipments, vehicles,
consumables, tools & tackles, transportation, Safety statutory compliance, mobilization
3. Goods & Service tax shall be paid extra at actual as per prevailing rates as declared by
Central Government on submission of documentary evidence.
4. Bidder shall have to quote the rates in the form of %age. i.e. “At Estimated Value OR
______%age above the estimated value.” Negative %age will be considered at par with
SoR Value only.
5. If two or more bidders who have quoted at par with SoR Value, then overall lowest bidder
will be considered on the basis of higher net worth of year Financial Year 2024-25.
6. The quantities shown in the price Bid are approximate for the contract period and may
vary as per job requirement.
7. The Bidder shall fill the Bid documents with utmost care in consonance with the
instructions contained in the Bid documents.
B: METHOD OF TENDERING/SIGNATURE ON BIDS
(i) The Bid must contain the postal address like name, residence and place of business of the
person or persons submitting the Bid and must be signed and sealed by the Bidder with his
usual signature. The name of all persons signing the documents shall also be typed or
printed below the signature on each page.
(ii) Bid by a consortium/joint deed of undertaking of company/partnership firm must be
furnished with full names of all partners and be signed with the partnership name, followed
by the signature and designation of one of the authorized partners or other authorized
representative(s). A certified copy of the power of attorney authorizing such partner or
representative shall also be submitted.
(iii) Bids by a Corporation/Company must be signed with the legal name of the
Corporation/Company i.e. by the President/Managing Director/Secretary or other person or
persons authorized to Bid on behalf of such Corporation/Company. A certified copy of the
board resolution/power of attorney authorizing such partner or representative shall also be
(iv) The Bidder's name stated on the proposal shall be the exact legal name of the firm.
(v) Erasures or other changes in the Bid Documents shall be initialled by the person signing
(vi) Bids not conforming to the above requirements of signing shall be disqualified.
9. MODIFICATION AND WITHDRAWAL OF BIDS
a) The Bidder may modify or withdraw the bid prior to the deadline prescribed for submission
b) No Bid shall be modified subsequent to the deadline for submission of Bids.
c) No Bid shall be withdrawn in the interval between the deadline for submission of Bids and
the expiration of the period of bid validity.
10.POLICY FOR BIDS UNDER CONSIDERATION
a) Bid shall be deemed to be under consideration immediately after opening of the bid and till
official intimation of award/rejection made by the Company to the Bidders.
b) While the Bids are under consideration, Bidders and / or their representative or other
interested parties are advised to refrain from contacting by any means, the Company. The
Officer in-charge, if necessary, will obtain clarifications on the Bids by requesting for such
information from any or all the Bidders, in writing as may be necessary. The Bidder will not
be permitted to change the price or substance of the Bid after the Bid has been opened.
11. EFFECT AND VALIDITY OF THE BID
a) The Bid should be kept valid for acceptance for a period of one hundred and eighty (180)
calendar days from the last date of submission of Bids.
b) The submission of any Bid along with the required documents and specifications shall
constitute an agreement that the Bidder shall have no cause of action or claim, against the
Company for rejection of his Bid. The Company shall always be at liberty to reject or accept
any Bid or Bids at his sole discretion and any action will not be called into question and the
Bidder shall have no claim in that regard against the GIPCL.
12. OPENING OF BIDS
12.1 The GIPCL will open the pre-qualification/Technical Bid/price Bid, as the case may be, in
presence of Bidder's representatives whenever such a procedure has been specified.
Otherwise the tender will be opened by the authorized officers of GIPCL.
12.2 Preliminary Examination:
12.2.1 The Company will examine the Bids for any computational errors, for sureties furnished by
Bidder, for authentication of documents submitted and completeness of the Bids.
12.2.2 Arithmetical errors will be rectified on the following basis:
a) If there is a discrepancy between the unit price and the total price that is obtained by
multiplying the unit price and quantity, the unit price shall prevail and the total price
will be corrected & will be binding to the Bidders.
b) If there is a discrepancy between the Total Bid Amount and the sum of total prices,
the sum of total prices shall prevail and the Total Bid Amount will be corrected & will
be binding to the Bidders.
13. EVALUATION & COMPARISON OF BIDS
13.1 GIPCL shall evaluate the Bids received and accepted by it to ascertain the lowest evaluated
Bid in conformity with the specifications of the tender documents.\
13.2 The Technical Bids will be examined for minor matters regarding qualification of bids.
Subsequent to correspondence with the respective Bidders, the decision of Tender
Committee will be final.
13.3 All responses to requests for clarifications shall be in writing and shall be presented to the
Company through e-mail or in a sealed envelope on or before the given date requested by
the Company. If the Technical clarifications sought by the Company do not reach the
Company on or before due date, the Bid will be rejected.
13.4 The comparison of all the Bids shall be carried out with reference to the scope of work as
per the technical specification. Any deviation/omission shall be evaluated at highest quoted
price of the deviation/omission quoted by any of the Bidder. In case a separate price (for
omission) is not given by any other Bidder, a reasonable price of the same shall be taken &
the same shall be binding to the Bidders.
13.5 The commercial deviation, if any, shall be loaded to bring all the Bids at par. The loading
shall be carried out at an interest rate of 2% above PLR of SBI.
13.6 A Bid to be substantially responsive shall be one which on evaluation confirms to all the
terms, conditions and specifications of the Bid documents without any material deviation or
13.7 For the above referred purpose, a ‘material deviation’ shall be one:
a) Which affects in any substantial way the scope, quality or performance of the contract, or
b) Which limits in any substantial way and in a manner inconsistent with the Bid documents,
GIPCL’s right or the Bidder’s obligations, under the contract, or
c) Whose rectification would affect unfairly the competitive position of other Bidders presenting
substantially responsive bids.
14. RIGHT OF REJECTION OF TENDERS
14.1 GIPCL reserves the right to accept or reject any Bid or to cancel the Bidding process and
reject all Bids at any time prior to award of contract, without thereby incurring any liability to
the affected Bidder or Bidders or any obligation to inform the affected Bidder or Bidders
regarding the same.
14.2 Any Tender without EMD and/or Tender fee will be treated as non-responsive and shall be
rejected at the outset & no further correspondence shall be entertained regarding this.
14.3 GIPCL reserves the right to debar any Bidder from participation in future Bids if such Bidder
has quoted an abnormally low rate in the Bid document/price Bid.
15. AWARD OF CONTRACT
15.1 GIPCL will award the contract to that Bidder whose quotation has been determined to be
substantially responsive and evaluated as the lowest quotation in conformity with the
requirements of the specifications and documents contained herein, provided further that
the Bidder is determined and evaluated to be qualified to perform the contract satisfactorily.
15.2 The successful Bidder shall be intimated of his selection through the Letter of Intent or Letter
of Award/ Work Order which shall be sent to him through e-mail, courier, fax or registered
15.3 GIPCL reserves the right to cancel/short close the contract during the contract period
without assigning any reason.
15.4 GIPCL reserves the right to split the contract quantity between vendors.
16. CONTRACT PERIOD
16.1 The contract will be for a period of 02 years from the date of actual commencement of
operation of the contract as stated in the Work Order.
16.2 GIPCL reserves the right to extend the Contract Period up to 3 months on the same rates
and terms and conditions without any price escalation and without entering into any new
16.3 The said Contract Period can be extended if mutually agreed upon by both the parties up to
one year and in such a case a revised work order shall be issued at the same rates and
terms & condition or at negotiated rates acceptable by both parties i.e. the Company & the
17. ASSIGNMENT AND SUB-LETTING
The Contractor shall not directly or indirectly assign or sub-let total/any part of the contract to any
other party or agency.
18. CONTRACTOR’S OBLIGATIONS Please refer the detailed scope of work given in
Section D for the Contractor’s obligations
19. CLARIFICATION OF BIDDING DOCUMENTS
If a Bidder requires further information or clarification in the Bidding Documents, may notify the
Company before one week of last date of submission of online Bid, in writing or by Email at the
GIPCL's mailing address [email protected] as indicated in the 'Invitation to Bids'.
The GIPCL's response (including an explanation of the query) will be sent in writing or by E-mail
to all prospective Bidders who have received the Bidding Documents.
20. TIME SCHEDULE
The basic considerations and the essence of the 'Contract' shall be the strict adherence to the
time schedule for performing the specified 'Works'.
21. UNDERSTANDING AND CLARIFICATION ON DOCUMENTS & SPECIFICATION
The Bidder is required to carefully examine the specifications and documents, all the conditions
and matters work wise & cost wise. If any Bidder finds any discrepancies or omissions in the
specifications and documents or is in doubt for any meaning of any part, he shall request in writing
for an interpretation/ clarification to the GIPCL.
All such interpretations and clarifications shall form a part of the Bid documents.
All the payments against the work order shall be in Indian currency and payable through
cheque/RTGS only.
23. POINTS TO BE CONSIDERED DURING QUOTING ONLINE PRICE BID
The schedule of rates shall be read in conjunction with Instructions to Bidders, General conditions
of contract, Special conditions of contract and Technical specifications.
Note: Interested Bidders are requested to submit the online tender at least two days in
advance from the due date set for on line submission of bid in order to avoid non-
participation of e-tender due to probable technical problem in e-tender system.
The quantities specified are estimated and for tendering purpose only. Payment will be made,
based on actual work done as certified by security in charge of GIPCL.
Quantities of individual items may be revised during the course of contract period based on site
requirement. Contractor shall not be entitled for any compensation on ground of such alteration in
scope of work. GIPCL reserves the right to operate or increase/decrease quantities in each item or
omit any item included in Schedule of Quantity at his discretion. Contractor shall have no claim,
whatsoever, on grounds of loss of anticipated profit etc. on account of the same.
After commencement of the work, GIPCL, for any reason may not require to be carried out the
whole/part of the work as specified in the tender, the security in charge shall inform the fact for
thereof to the CONTRACTOR and contractor shall have no claim for any payment or compensation
whatsoever on account of any profit or advantage which he might have derived from the execution
of the work in full but which he did not derive in consequence of the full amount of the work not
having been carried out nor shall he have any claim for compensation by reason of any change
having been made in the original specifications and instructions which shall involve any curtailment
of the work as originally contemplated.
INSTRUCTIONS TO BIDDERS FOR ONLINE TENDERING
1. Tender documents are available only in electronic format and same can be downloaded
from the website https://tender.nprocure.com and https://gipcl.nprocure.com and It can also
be viewed from Company’s website www.gipcl.com .
2. Price bid should be submitted online through the website https://gipcl.nprocure.com only.
No physical submission of price bid will be entertained as it should be furnished on-line
3. Bidders who wish to participate in online tenders will have to procure / should have legally
valid Digital Certificate (Class III) as per Information Technology Act-2000, using which they
can sign their electronic bids. Bidders can procure the same from any of the license
certifying Authority of India or can contact (n)code solutions- a division of GNFC Limited,
who are licensed Certifying Authority by Government of India
4. All bids should be digitally signed. The Bidders are required to contact at the below
mentioned address for detailed training on on-line tendering and also for requirement.
(n) Code Solutions - A division of GNFC Ltd.
403, GNFC Infotower, S.G Road,
Bodakdev, Ahmedabad – 380054 (Gujarat, India)
E-mail: [email protected]
Interested Bidders are requested to submit the online tender at least two days in advance from
the due date set for on line submission of bid in order to avoid non-participation.
REVERSE AUCTION:
1) GIPCL reserves the right to conduct E-Reverse auction through (n) Procure platform
after opening of the Price Bid depending on quoted price of various bidders.
2) E-Reverse auction shall be conducted amongst (a) the lowest 50% eligible Bidders
(rounded to the next higher whole number) from the total bids received OR (b)
Minimum three (03) lowest Bidders, whichever is higher, shall be invited for
participation in e-Reverse Auction through n-procure platform.
3) Opening Price, Detrimental value and duration for the e-Reverse Auction shall be
informed to the qualified Bidders before start of e-Reverse Auction.
4) After e-Reverse Auction process, L1 Bidder shall be decided on Lowest Total
Contract Price.
5) Quotations below SoR value shall not be considered.
6) In case bidding below SoR in e-reverse auction, the vendor will be evaluated at SoR
only. In case of more than 1 Bidder quoting at SoR/at same price, the financial
networth of preceding financial years will be the criteria for deciding merit order.
7) To participate in e-Reverse Auction, Bidders have to create e-Auction USER ID on
https://eauction.nprocure.com that the Bidder shall be allowed to participate the
eReverse Auction.
8) In case of any further information regarding online bidding or if a Bidder needs any
assistance in accessing/ submission of online bid/ clarification or if training is required
9) for participating in online e-reverse bidding, then the Bidder can contact the following
10) for assistance or training:
(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Info tower, S.G. Road,
Bodakdev Ahmedabad – 380054 (Gujarat)
E-mail: [email protected]
Bidder may visit https://tender.nprocure.com/html/faq.asp for information regarding e
tendering registration process.
GENERAL CONDITIONS OF CONTRACT
1. CONTRACT SECURITY DEPOSIT/PERFORMANCE BANK GUARANTEE:
As a Contract Security, the successful Bidder, to whom the work is awarded, shall be required to
furnish a Contract Security Deposit in favour of Gujarat Industries Power Company Limited,
Baroda as per the format given by GIPCL, for guarantee amount equivalent to 10% (Ten) of the
annualized contract value (excluding GST) from any bank listed in format of bank guarantee and
it shall guarantee the faithful Performance of the 'Contract' in accordance with the terms and
conditions specified in these documents and specifications. Contract security deposit shall be
submitted strictly within fifteen days from the date of LOI or work order, whichever is earlier. The
guarantee shall be valid up to retention period of three months from the contract completion date.
The Guarantee amount shall be payable to the Company in Bidder's home currency without any
condition whatsoever.
The security deposit will be returned to the Vendor / Contractor without any interest at the end of
the ‘Retention Period' after completion of contract and on fulfilling contractual obligations
throughout the retention period. However, any delay in submission of security deposit (SD) will
result in equivalent late release of entire SD after guarantee period.
In case if any liabilities arising out of this contract to GIPCL due to the default on the part of the
bidder in carrying our various job / functions, the same will be deducted while refunding the security
2. RECOVERY CLAUSE:
(i) In case of any damage of equipment / machinery due to negligence of contractor or any
other reasons attributed to contractor the decision of GIPCL officer-in-charge regarding the
amount of recovery shall be final and binding subject to a maximum of 10% of contract
value. Recovery will be affected from the monthly bills and / or retention money / security
(ii) If the contractor fails to execute the work as per directions of GIPCL officer-in charge within
the time frame given in work order and as per day to day instructions by GIPCL officer-in
charge, GIPCL shall get the work done by third party at the risk & cost of the contractor with
15% additional overhead charges of GIPCL.
3. DEDUCTIONS FROM CONTRACT PRICE:
All costs, charges or expenses that GIPCL may have paid, for which, under the contract the
contractor is liable, shall be recovered by the GIPCL. The contractor shall pay all such claims within
15 days of claim failing which the same shall be deducted from the bills of contractor.
4. TERMINATION OF CONTRACT BY GIPCL
Contractor shall be responsible to complete the jobs within agreed time schedule and in case
contractor fail to complete the job, GIPCL shall recover from his bill, Security Deposit and / or
whatsoever for expenses incurred to complete the job with additional 10% overhead charges.
In case if contractor’s services are not found satisfactory with respect to mobilization, time bound
completion of work, workmanship & safety (OHSAS policy of GIPCL) etc then GIPCL has right to
terminate the contract at any time by giving him 15 days advance notice without assigning any
reason and will make the alternate arrangement at the risk & cost of contractor.
GIPCL may terminate the contract after due recoveries of pending jobs/damages after giving
days advance notice to the contractor if any of the following events occur –
i. Contractor is adjudged as insolvent.
ii. Contractor has abandoned the contract.
iii. Contractor fails to proceed with the work with due diligence as per requirements of the
iv. Contractor has neglected or failed persistently to observe or perform any of the acts, matters
or things, which as per the contract are to be observed and performed by the contractor.
v. Contractor repetitively violating the safety norms for more than three incidents.
vi. Any major contradiction of applicable labour laws.
vii. Any major deviations from contractual terms and conditions including quality of job.
viii. GIPCL reserves the right to terminate the contract without giving any reason whatsoever
and forfeit the PBG
5. FAILURE & TERMINATION
If the CONTRACTOR after receipt of written notice from the GIPCL/ Security In-charge requiring
compliance, with such further drawings and / or the GIPCL /Security In-charge instructions fails
within seven days to comply with the same, the GIPCL / Security In-charge may employ and pay
other agencies to execute any such work whatsoever as may be necessary to give effect thereto
and all costs incurred in connection therewith shall be recoverable from the CONTRACTOR by the
GIPCL on a certificate by the GIPCL/ Security In-charge as a debt or may be deducted by him from
any money due or to become due to the CONTRACTOR.
If the contractor fails to execute the work or fails to mobilize the resources and equipment as per
directions of GIPCL / Security In-charge within the time frame given and/or violating the GIPCL’s
safety rules & regulations, Security In-charge / GIPCL shall get the work done by third party at the
risk & cost of the CONTRACTOR with additional 10% overhead charges of GIPCL and all costs
incurred in connection therewith shall be recoverable from the CONTRACTOR by the GIPCL /
security incharge as a debt or may be deducted by him from any money due or to become due to
the CONTRACTOR.
6. SETTLEMENT OF DISPUTES
a. Any disputes or difference of opinion between parties arising out of the contract to the extent
possible shall be settled amicably between the parties. If amicable settlement cannot be
reached all the disputed issues shall be resolved through arbitration before a Sole Arbitrator
appointed by Managing Director, GIPCL according to the provisions of The Arbitration &
Conciliation Act-1996, as amended from time to time. The place of arbitration shall be at
b. Work under the contract shall be continued by the Bidder during arbitration proceedings
unless GIPCL shall order suspension thereof or any part thereof in writing or unless the
matter in such work cannot possibly be continued unless the decision of the Arbitration
proceedings is obtained.
7. INTERPRETATION OF CLAUSE
In case of disputes as regards interpretation of any of the clauses or specification, the
decision of Head of Management (HOM)-GIPCL will be final and binding on the Bidder.
8. EMPLOYEE’S COMPENSATION INSURANCE
Contractor shall take all risk Insurance Policy to cover all his workmen/employees, staff
applicable under the Employee Compensation Act 1923 or any amendment thereof as also
insurance cover for third party liability. The Contractor shall keep the GIPCL indemnified
from all liabilities arising out of his action in pursuance of this contract. The E. C. Policy
should be obtained from Baroda/Surat Jurisdiction (As per Work Location) and shall be
assigned to GIPCL. EC policy should cover the specified contract period.
Contractor shall also obtain additional off-duty coverage insurance policy for all his
9. STATUTORY REQUIREMENTS
a. COMPLIANCE OF LABOUR LAWS
The Contractor shall at his own cost comply with the provision of labor laws, rules, orders
and notifications whether central or state or local as applicable to him or to this contract
from time to time. These Acts/Rules include without limitation of the followings.
5. Contractor shall be solely responsible and shall fully comply with all the provisions
of all the labor laws applicable such as the Minimum Wages Act, 1948, Contract
Labor (Regulation & Abolition) Act 1970, Factories Act, 1948, Payment of Bonus
Act 1965, Employees Provident Fund and Miscellaneous Provision Act
Industrial Dispute Act 1947, Workmen Compensation Act 1923, Payment of Gratuity
1972, Interstate Migrant Workmen Act 1979, Equal Remuneration Act with Rules,
Order and Notifications issued/made there under from time to time.
6. All other Acts, Rules/Bye-Laws, Orders, Notifications etc. present or future
applicable to the Bidder from time to time for performing the contract job.
6.1 The Contractor shall provide and be responsible for payment of Wages, Salaries,
Bonus, Social charges, Insurance, Food, Accommodation, Transport, Medical and
Canteen facilities and other statutory privileges and facilities to his personnel as per
law/rules/regulations and orders of the Central Government, State Government,
Local Authorities or other authorities as are in force from time to time. All employees
of the Bidder shall be employee of the Bidder.
6.2 The Contractor shall have a valid license obtained from Licensing Authority under
the Contract Labor (Regulation & Abolition) Act-1970 at the time of execution of the
contract covering all his employees working at Baroda Site and furnish the same
failing which GIPCL may terminate the contract at its sole discretion.
6.3 The Contractor shall at the time of execution of the contract have a EPF Code
Number obtained from the Authorities concerned under the Employees Provident &
Miscellaneous Provisions Act, 1972 and remit contributions in respect of the
employees employed by him at Baroda Site to the P.F office concerned every month
failing which GIPCL will recover from the outstanding payment to the Bidder from
GIPCL.PF code of Gujarat region should be taken.
6.4 The Contractor shall maintain all records/registers required to be maintained by him
under various labor laws mentioned above and produce the same before the
Statutory Authorities whenever required.
6.5 The Contractor shall also submit periodical reports / returns to the various statutory
authorities such as the Contract Labour (Regulation & Abolition) Act1970,
Employees Provident Fund Act etc. Under intimation to HR&A Department.
6.6 The Contractor shall not pay less than the Minimum Wages notified by the
Government from time to time to his employees of corresponding categories.
6.7 The Contractor shall be responsible for payment of overtime wages to his workmen,
if any, in case they are required to work beyond the prescribed hours under law as
per applicable rates.
6.8 The Contractor shall take Workmen Compensation Insurance Policy for all his
employees working at GIPCL. The Contractor shall indemnify the company against
any liability due to any work injury or accident to any of its employees.
6.9 The Contractor shall in the event any of his workmen / employee sustains any injury
or disablement due to an accident arising out of and in the course of his
employment, provide necessary medical treatment and pay compensation as
applicable, required under the Workmen’s Compensation Act,
6.10 If any of the persons engaged by the Contractor misbehave with any of the officials
or the Company or commit any misconduct with regard to the property of the
Company or suffer from any serious communicable disease, the Contractor shall
replace them immediately.
6.11 The Contractor shall not engage / employ persons below the age of 18 years.
Employment of women shall be strictly according to applicable laws.
6.12 GIPCL will have right to deduct and disburse the claims of the individual / parties
being a principal employer on any account whatsoever in relation to their
employment with the Contractor. The Security deposit will be released to the
Contractor at the end of the contractual tenure subject to an undertaking by the
Contractor that in the event any of his workmen or the heirs of workmen puts up a
claim for recovery of money due to him from the Contractor before the appropriate
authority under the I.D. Act, 1947 or under any other labor laws or for compensation
under the Workmen’s Compensation Act, 1923 and the appropriate authority has
given a direction for making payment the Bidder will meet the same or indemnify
GIPCL if in the event GIPCL pays it as Principal Employer.
6.13 The Contractor shall make payment of wages to his employees on fixed date within
the period specified under the applicable Law, in presence of representative of the
company. He will submit a true copy of wage sheet, attendance register and P.F.
remitted challans on monthly basis to HR&A dept. for verification and record.
6.14 The Contractor shall provide Safety items / kits to his employees such as safety
shoes, goggles, ear plugs, hand gloves, safety belts etc., if any, required under the
6.15 The Contractor shall conduct pre-induction and periodic medical checkup of his
workmen/guards as per applicable laws.
6.16 The Contractor shall be solely responsible for any accident caused to his guards
and should adhere to all rules / regulations as per labor laws of Government and
other statutory laws as applicable.
6.17 The Contractor should register himself under the Contract Labor Act, Employee
Compensation Act and PF Act (Code no. to be mentioned) and submit the copy of
registration certificate and should possess the same from the date of
commencement of work, failing which the contract is liable to be cancelled. The E.C.
Policy copy should be submitted to the GIPCL before commencement of the work
and Labor License should be obtained within one week from the date of issue of
form-V. Contractor should apply for Form-V immediately after receipt of LOI. A copy
of Labour License shall be submitted to GIPCL, HR & A Department.
6.18 Contractor shall have to insure his guards /supervisors etc. under Group Insurance
6.19 The Contractor shall be responsible for compliance of all statutory rules, regulation,
act enforced from time framed by the government such as Factory
6.20 Act, Employee Compensation Act, Payment of ‘Wages Act’, Minimum Wages Act’,
Provident Fund Act, All Labor Laws/Acts in respect of employees engaged by him
for the work and shall have to maintain necessary records. In case any amount
becomes due to be payable by him to his employees or to the Government under
the above rules, regulation, Acts, GIPCL reserves the right to recover the same from
the running bill of the contract.
6.21 Documentary evidence of deposit of PF paid shall have to be produced by the
Contractor along with the next bill.
6.22 Records as per the provisions of various statutory Acts will have to be maintained
by the Contractor and submitted as and when required.
6.23 All employees of Contractor should maintain due discipline and respect local
sentiments. GIPCL reserves the right to direct the Contractor to remove any such
person who does not comply with it.
6.24 The list is indicative in nature and not an exhaustive one. Any
amendment/alteration/Notifications or addition to the existing Law or a new statute
shall automatically and immediately become applicable.
6.25 Annual Health Check Up:- As per statutory requirement, Contractor has to inform
his staff deployed at Baroda for annual health check-up as per schedule prepared
by HR&A department.
b. LEGAL ASPECTS
1. Contractor shall maintain all register required under the Labour Laws and make the
payment as per the Minimum Wages Act to the manpower employed by him.
2. Contractor shall obtain requisite license to carry out this contract under the
provisions of Contract Labour Act, 1970 and maintain necessary records and
registers under the said Act.
3. Contractor shall submit a copy of each of the registration certificates with respect to
Employees Provident Fund and Employee Compensation Act within one week’s
time, from the date of award of this contract.
4. Contractor’s employees, agent or sub-agent shall not smoke or light anything within
the premises of the GIPCL and carry match box / lighter or any other explosive and
/or inflammable material inside the plant.
5. Contractor shall abide by all the statutory rules and regulations like P.F, Labour
6. Contractor shall issue an appointment order to each of his manpower stating therein
the nature of job to be performed by him and fix time for which the concerned
guards, etc. are likely to be deployed. Bidder shall also issue a temporary identity
card specifying the period for which the guards, etc. has been deployed.
7. Contractor is fully liable for the persons engaged by him for above work; however,
GIPCL reserves the right to deduct any amount legally justified towards any liability
8. Contractor shall indemnify GIPCL from any liabilities arising out of the employment
of the manpower.
9. If the Contractor fails to complete the allocated job within specified time frame,
GIPCL shall get the work done by third party at the risk and cost of Contractor.
10.PAYMENT OF WAGES
Contractor shall make payment to his workmen through on-line mode only. Contractor shall
be responsible for compliance of all statutory rules, regulation, act enforced from time
framed by the government such as Factory Act, Employee Compensation Act, payment of
‘Wages Act’, Minimum Wages Act’, Provident Fund Act, Payment of Bonus Act, Labor Law
Act, maternity benefit act in respect of employees engaged by him for the work and shall
have to maintain necessary records. In case any amount becomes due to be payable by
him to his employees or to the Government under the above rules, regulation, Acts, GIPCL
reserves the right to recover the same from the running/final bill or Security Deposit of the
11.ACCIDENT TO WORKMEN
Contractor shall be fully responsible for injury or death of any of his workmen due to any
act omission / indiscretion on his part while undertaking the work and Contractor shall fully
abide by the statutory requirements of the employee's compensation act. GIPCL shall not
be liable for any compensation due to accident, death or injury to any of Bidder’s workmen
or any third party due to negligence, act or omission on contractor’s part.
Necessary illumination at works area will be provided by GIPCL. However, the contractor
shall provide Hand Held Search Lights, quantity 01 between two guards deployed in Night
13.NIGHT/SUNDAY/HOLIDAY SHIFT
The Contractor shall depute qualified and adequate resources on night shift /Sunday
/holidays for any emergency job, which may come up at night/Sunday/holiday.
14.SAFETY ASPECT
Contractor shall observe all the safety and security rules and regulation of the GIPCL which
are at present in force and which may come into force during the pendency of the contract.
Any violation of any rules and regulations will entail immediate termination of the contract.
The contractor has to submit the list of required safety gears along with safety
equipment available with him to the Safety Deptt. Safety Deptt will check for quantity and
quality of the safety gears and then give permission of work. Poor quality material will not
be allowed inside the Plant. If quantity of required safety equipment is not satisfactory,
contractor will not be allowed to carry out the work using such safety gears inside the Plant.
15.GENERAL SAFETY CLAUSES:
1. The Contractor shall observe and comply, with regard to his workmen working at
the Baroda Site, the safety norms as per the safety operating standards.
2. The Contractor shall ensure that his workmen are informed and trained regarding
the safety standards to be adopted while operating within the Baroda Plant & Mines
premises and the Contractor shall brief them regarding the same and use of the
Personal Protective Equipment (‘PPE’).
3. The Contractor shall issue safety shoes and safety helmet of IS standard to all his
workmen immediately on execution of the work and the Contractor shall ensure that
his workmen wears the protective equipments at all times during the work operation.
Contractor shall issue safety shoes every year. Brand name for safety shoe & safety
helmet shall be suggested by safety representative of GIPCL. Such as:-
Sr No. Model Company Specifications
01. Tough Hat, HP-TH Sure Safety IS : 2925 –
ANSI / ISEA Z89.1-
03. PN 521 - Shelmet Karam
Sr No. Model Company Specifications
01. SSTEELE (Strom) – Double
Acme Fabrik plast Co. Density IS : 15298 –
02. TRIMAX(Adjacent) –
03. Favourite Safety Waves Nile D/D
04. FSP Nile DD
4. Other safety gears like ear plug, dust mask, hand gloves, safety goggles, gum boots,
full body safety uniform and belts, safety net etc. shall be issued and used as per
the job requirements. Safety helmet shall be of YELLOW COLOUR ONLY.
Contractor will procure safety shoes & safety helmet from a reputed company with
at least 12 months’ guarantee and shall produce the guarantee certificate and IS
standard certificate to the Safety Department. Contractor should purchase safety
shoes of reputed brands. Safety shoes will be issued every year. IS certificate and
guarantee certificate must be obtained from the vendor and submitted to the Safety
Department. Safety shoes should be heat, water, oil and chemical resistant, having
an anti-slippery sole of 15298- 2002 make.
5. It is the duty of Contractor to ensure that his workmen are wearing required PPEs
as per work requirement. Contractor should ensure that their workers are wearing
Safety helmet, safety shoes, dust mask, goggles, ear plug etc. at all times when
they are at work throughout the contract period. The Contractor has to maintain the
PPE Issue Register with signature of workmen.
6. Contractor will reissue these PPEs in case of damage or misplacement of the same.
Replacement shall be made immediately.
7. The Contractor shall be responsible for providing first aid or emergency medical
help and treatment to his workmen in the event of any accident or injury.
8. If it is observed that Contractor is not issuing required PPEs timely and that of
required quality, GIPCL will issue the required PPEs to contract workers and back
charge the same with 25% overhead charges of GIPCL.
9. All vehicles shall be operated by licensed drivers only. All vehicles’ PUC to be tested
as per Government approved RTO guidelines. All Vehicles must be parked in
Parking space designated by GIPCL. If any vehicle is found inside the plant
premises other than the parking area such vehicles shall be handed over to Security
Department and their entry shall be cancelled for movement inside the plant
premises with immediate effect.
10. The Contractor shall fill – up Incident notification form (S-I), Incident Investigation
form (S-II) and near miss report within time limit as specified in forms, if any
accident, Incident, near miss occurred while working at SITE .
11. Major AMC / ARC Contractor (Where the manpower strength is more than 50 and
above) should appoint / nominate one qualified safety officer and he shall be
responsible for addressing all the safety related aspects of execution of contract
jobs and he will be in close co-ordination with safety officer of Baroda and attend all
safety related meeting such as safety committee, on job safety training etc. Where
the contractual man power is less than 50, the Site in-charge of the Contractor will
act as a safety officer and he will perform all the duties of safety officer as mentioned
12. All the vehicles shall be fit as per RTO guidelines and valid fitness certificate is
required as per RTO guidelines.
13. The Contractor’s nominated safety officer shall be imparted regular on-job safety
training like tool-box talk etc. and submit a record of such training in safety dept,
respective dept and HR&A Department
14. The Contractor shall comply with all the new requirements related with safety as
informed by the HOD / Safety department from time to time.
15. Penalty to be imposed for Violation of safety norms is proposed as follows: -
16. The Contractor & Contract workmen shall strictly adhere to Safety standards /
Guidelines as per practices. The list provided below is an indicative list to explain
the principles behind safety practice. If the contract workmen fail to comply with
safety standards as per category A, B & C below, penalty shall be levied on the
Contractor as per the table mentioned below:
Category Classification on Examples / Cases Penalty
A PPEs Related Working without helmet, Rs. 100 /- per
shoes, safety belt, gloves instant.
B WI Related Failure to adhere to HSE Rs. 500 /- per
guidelines/plans, careless attitude instant.
in material handling,
Machine being used with After three
damaged machine guard, incidence, Per
unsafe electrical work - incidence Rs.2500/-
workout plug top/improper
electrical joints/cables lying
on ground, electrical Continuous
equipment working without unsafe acts
proper earthing, machine will disqualify
being used without machine the
guard, Welding machine Contractor
without ELCB / RCCB of from further
proper rating, Gas cylinder participation
without test certificate,
Cylinder cap, NRV / Flash
back arrester, Cylinder in tender of
trolley etc. GIPCL -.
Unsafe working practices at
height more than 3 meters
Working without permit or
noncompliance with permit
conditions like hot work, height
work etc. as applicable, lifting tools
and tackles being used without
third party inspection certificates in
9/10 as per Factory Act –
Penalty so levied against the Contractors and company employees will be used during the
observation of National Safety Day.
The Contractor, workmen following good safety practices in their work area
continuously will be rewarded / honoured on National safety day.
16. REJECTION OF WORK.
If, as a result of inspection, examination or testing, the GIPCL’s Representative/Engineer
decides that any materials, work or workmanship is defective or otherwise not in
accordance with the Contract, the GIPCL/ GIPCL’s Representative may reject such plant,
materials, work or workmanship and shall notify the CONTRACTOR promptly, stating his
reasons. The CONTRACTOR shall then promptly make good the defect and ensure that
the rejected item complies with the Contract. If Contractor failed to rectify the rejected work
or workmanship, GIPCL reserves the right to deduct or withhold amount against rejected
work or Workmanship. CONTRACTOR shall not entitle for any claim or release of hold
payment until rectify the defect up to satisfactory of GIPCL. If Contractor failed to rectify
any such defective work or workmanship, GIPCL reserve the right to rectify at risk and cost
of the CONTRACTOR and deducted by the GIPCL from any amount due, or to become
due, to the CONTRACTOR’s dues.
If the GIPCL/Engineer/GIPCL’s Representative requires such materials, work or
workmanship to be retested, the tests shall be repeated under the same terms and
conditions. If such rejection and retesting cause the GIPCL additional costs for the
traveling and lodging costs of GIPCL’s personal for attending the retest, such costs shall
be recoverable from the CONTRACTOR by the GIPCL and may be deducted by the GIPCL
from any amount due, or to become due, to the CONTRACTOR.
17. GENERAL TERMS AND CONDITIONS:
a. All tools & tackles, manpower, equipment, vehicles, etc. to execute the contract are
in the scope of the Contractor. The Contractor should ensure that tools& equipment
are in healthy condition.
b. The decision of the controlling officer of GIPCL shall be final and binding on the
Contractor for defining the terms and condition included in this contract.
c. If the work is not found satisfactory, the controlling officer of GIPCL reserves the
right to take suitable action.
d. Contractor shall depute Location wise full time independent experienced Site-in
charge and two nos. of independent Site supervisors at Site. They shall co-ordinate
with GIPCL officer in-charge and shall bear overall responsibility of contract
including duty deployment, billing etc. Such person shall function from Site office of
Contractor at Baroda.
e. Contractor shall also nominate one safety supervisor at Site and shall submit
nomination of safety supervisor in writing before commencement of contract. Safety
supervisor shall arrange small safety talk on every day morning or whenever
required with all manpower working under this contract. He shall coordinate with
security department’s officer-incharge on daily basis and report daily observations,
tool-box talk records etc.
f. The contractor has to submit daily reports showing work carried out with details of
available manpower, tractors etc.
g. Any job other than the listed jobs in work order shall be executed by the contractor
on instruction from GIPCL and payment shall be made to the contractor on
respective item rate only.
h. The contractor has to take EC insurance policy for his workmen. The contractor has
to submit labor license and PF account number to the officer in-charge before
starting the work.
i. Contractor shall mobilize the resources as per need within the period of twenty-four
hours. If the contractor fails to mobilize sufficient resources to complete the job in
time, GIPCL will execute the job through other agency at the risk and cost of the
contractor with additional 10% overhead charges.
j. Contractor should mobilize all resources for efficient & smooth execution of contract
within seven to fifteen days from the date of issue of Letter of Intent/Work Order.
k. Contractor must fulfill all the safety regulations and to take safety measures to avoid
hazards. Contractor shall arrange all standard adequate healthy safety PPEs like
but not limited to approved quality safety shoes& safety helmets, standard dust
masks, safety goggles, etc… as required and shall use exclusively under this
contract for all the time during working at specified locations failing which, security
in-charge may hold the work and will take necessary action including penalty as
decided. If the contractor repeatedly violates safety rules/regulations (more than
three successive incidents), security in-charge may take necessary action against
the contractor, including appropriate financial penalty and/or termination of contract.
l. One or more jobs may be required to be done simultaneously and contractor shall
mobilize additional resources accordingly.
m. Timely completion of all jobs and works shall be the essence of this Contract.
Contractor should closely monitor each activity and complete the jobs as per the
time given by and under the supervision of the officer-In-charge and shall ensure
that sufficient manpower is deployed for the same.
n. The contractor has to submit daily reports showing work carried out with details of
available manpower, etc.
o. The Government of India has enacted the Micro, Small and Medium Enterprises
Development Act, 2006 (the “Act”) and the Act has come into force from October
2006. The Contractor shall confirm whether his organization is registered under the
Micro, Small and Medium Enterprises Development Act, 2006. If your organization
is registered under the Act, please specify the category i.e., Micro Enterprise, Small
Enterprise or Medium Enterprise under which it is registered and kindly attach a
copy of your registration certificate.
p. The Contractor shall provide details of registration along with copy of the registration
certificate issued by the District Industries Centre/Department of Industries, etc of
the respective State Government. It is to be noted that large scale industries and
trading firms have been excluded from the purview of the Act.
q. GIPCL is an ISO 9001, ISO 14001, OHSAS 18001 & ISO 50001:2011 (EnMS)
certified company, and GIPCL gives extreme importance to maintain these global
r. Contractor shall be required to observe these standards while working with GIPCL.
Contractor should ensure that his workmen/guards work in accordance with them.
s. The contractor shall submit his monthly RA bill within three days of the completion
of a calendar month. It must be supported by authentic/original documents, which
clearly indicate complete compliance of all statutory provisions/ acts.
t. The contractor must pay entitled wages of all the security personnel within seven
days of completion of the calendar month. Any delay in payment of wages shall
constitute a statutory violation for which appropriate legal action may be taken by
GIPCL as per Contract Labor (Regulation & Abolition) Act, 1970. Payment received
from GIPCL should not in any way be linked to the payment of wages to the security
u. Wages of security personnel to be paid by the contractor after statutory deductions,
if any, and payment of wages should be as per payment of wages Act and Factory
v. Earnest Money Deposit (Non-interest bearing) along with the pre-qualification bid
will be converted as Security Deposit (non-interest bearing) in case of successful
Bidder and will be returned only after satisfactory completion of the BRC.
w. EMD amount of unsuccessful bidders will be refunded once LOI/WO is issued to
successful bidder for new BRC.
x. The biennial rate contract shall be valid for a period of Two years and on completion
of the same it will stand terminated unless it is extended/ renewed as per mutual
y. GIPCL can terminate the BRC at any time by giving 15 days’ notice in case
performance of the Contractor is found to be unsatisfactory or for any other reasons
deemed fit for termination. On the other hand, the Contractor would be required to
extend the contract for a period of 3 months at the same rates, terms & conditions
on completion of the contract period, if so desired by GIPCL.
z. GIPCL shall also conduct an orientation program appraising the workmen regarding
the safety norms and measures to be observed during work operations at the plant
18. PUBLIC HOLIDAYS
The Bidder shall be responsible for giving benefit to all his employees, employed in
whatsoever capacity, 09 Public/Paid holidays and the same shall be notified in advance
and due communication thereof shall be made to the Management.
19.BENEFIT PAYABLE IN CASE OF ACCIDENT OCCURRING OUTSIDE PREMISES OR
BEYOND THE COURSE OF EMPLOYMENT The Contractor shall provide an insurance
coverage (Medical + Death Benefit) for sum of Rs. 01/-Lakh to all his workmen/guards
deployed at GIPCL site for the accident taking place anywhere outside the Company
premises or at any place when the workman is not in course of his employment.
20.FORCE MAJEURE
The performance of the obligations herein contemplated may be suspended without
incurring the penalty in the event of the subsistence of Force Majeure conditions.
If a Force Majeure situation arises, the affected Party shall promptly notify the other Party
in writing of such conditions and the performance shall be suspended as per mutual
For the purposes of this clause, ‘Force Majeure’ means an event beyond the control of the
Party and not foreseeable by the Party and shall include events of floods, explosions, riots,
wars, hurricane, epidemics, any other Act of God, quarantine restrictions, terrorism,
government actions and provided always that such acts result in the impossibility of the
further performance of the contract.
The Contractor shall indemnify and keep harmless GIPCL from and against all actions,
proceedings, claims, demands, losses, costs, damages and expenses whatsoever which
may be brought against or suffered by GIPCL which it may sustain, pay or incur as a result
of or in connection with the performance/ purported performance/ non-performance of the
contract by the Contractor.
In case, in any litigation pertaining to manpower employed through contractor if any
direction or order is issued by court at any point of time the contractor shall comply with
and implement such direction or order whether passed at the time of award of contract or
during the pendency of contract. Further, the Contractor shall indemnify the GIPCL against
all consequences arising and affecting GIPCL owing to the compliance of the orders by the
22. GOVERNING LAW AND JURISDICTION
This tender document and contract shall be governed by the laws of India and the Courts
at Baroda shall have jurisdiction regarding the same.
23. Where any portion of the General Condition of Contract is repugnant to or at variance with
any provisions of the Special Condition of Contract, then unless a different intention
appears, the provision of the Special Conditions of Contract shall prevail to the extent of
such repugnancy of variance.
SPECIAL CONDITIONS OF CONTRACT
1.DETAIL SCOPE OF WORK:
The scope of work entails providing comprehensive security, vigilance, and fire safety services at
GIPCL-Baroda Plant , Gujarat. The services include security operations, vigilance, firefighting, and
the management of security apparatus, with a primary focus on ensuring overall security and fire
safety services.
The Contractor will be responsible for all functions related to security, vigilance, and firefighting, as
well as any additional duties deemed necessary to enhance the safety and security of the site. The
area of services may increase or decrease to any extent depending on the changing requirements
of the project.
The Contractor must provide 24/7 security services as directed by the GIPCL (Gujarat Industries
Power Company Limited) officials. In the event of any shortage in the number of security guards, it
is the Contractor’s responsibility to promptly replenish the required security personnel, ensuring
that no site or post is left unattended at any time. The Contractor acknowledges that the total
number of security staff may vary based on different factors, and they will be required to adjust the
manpower accordingly, as directed by GIPCL management with a 24-hour notice.
The Contractor must quote for both the minimum and maximum number of security personnel they
can provide on demand within 24 hours, ensuring they can meet GIPCL’s security needs as
Please refer the detailed scope of work given below: -
Security Services.
1. The Contractor shall deploy civilian/ex-servicemen security staff as per details in SOR (i.e.
Ex-Indian Army/ Navy/ Air force/ BSF/CISF and other paramilitary /police/auxiliary force
personnel / Ex-Nepal & Bhutan Army Personnel/ Home Guard Personnel) having sound
physical and mental health. Security Officer should be 58 years of age, Security
Supervisors should be 55 years of age and Security Guards below 50 years of age. Ex-
servicemen’s personnel’s original documents must be submitted to the GIPCL official at the
time of initial deployment of each and every security personnel at GIPCL for verification and
copy thereof made available for records subsequently.
2. In case Civilian Guards are deployed they should be Smart/good beaing, experienced
civilian guards with the height not less than 175 Cms. Minimum experience in security duties
in Industries should not be less than 5 years. Background check of the civilian guards should
be conducted by the Contractor and they should be deployed after proper police verification.
It should be clearly understood by the contractor that the civilian guards, if employed will
not be kept at par with ex-servicemen security staff, the
civilian guards, if employed by the contractor will be categorised as unskilled for payment
3. The security personnel deployed by the Contractor should be competent and proficient in
handling and operating state of the art CCTV cameras and surveillance equipment. All
Security Supervisors should have knowledge on computer operation as they have to
perform their duties at the gate, Pass Section / Material Section which are computerized.
Certificate in this regard will be submitted by the Contractor.
4. The Contractor shall protect the GIPCL's property and persons round the clock, and if
required, during their commute from residence to the company and vice versa.
5. The Contractor shall disallow trespassing of unauthorized persons in the project premises
or any other premises belonging to GIPCL.
6. The Contractor shall deploy adequate number of persons for effective and efficient services
which should include Security officers, Supervisor, Guards, etc., Number of security guards
shall be increased or decreased & shall be provided in accordance with the requirement of
GIPCL from time to time.
7. The Contractor shall depute trained security officers, security supervisors and security
guards who are competent in security matters and shall take all measures to prevent any
security breaches.
8. The Contractor shall be responsible to monitor vehicular traffic at GIPCL gates and inside
GIPCL’s premises and carry out proper search of GIPCL's employees, laborers, visitors,
materials etc., to ensure safety & security of its personnel & property and to prevent illegal
exit of GIPCL's property.
9. Contractor shall also guide the visitors after completing requisite procedure and perform
such other related functions of the security as assigned by the designated official of GIPCL.
10. The Contractor shall check and verify incoming and outgoing vehicle, equipment and
material and monitor loading and unloading of materials in the GIPCL's premises.
11. The Security personnel posted must be free from communicable cardiovascular diseases,
infections & surgeries. Candidate should not have a past history of mental illness. The nose,
ear & throat should be in perfectly fit condition.
12. The Physical Fitness Test (PFT) – to determine the physical fitness of a guard following
tests shall be conducted – (a) 0.5 Km running (within 3 minutes); (b) Balance Routine; and
(c) Parade/Drill. Report of the Physical Fitness Test is to be submitted with physical
standards of each candidate as mentioned in the condition of deployment of manpower.
13. GIPCL reserves the right to reject any security personnel if not found suitable.
14. In case of any abnormal situation sensed/seen by the Contractor's personnel related to
security, vigilance and fire at premises of the GIPCL either from an insider or from outside
persons (including nearby villages), a regular written report by the Contractor shall be
submitted to the GIPCL's Authorized Officer.
15. The Contractor shall agree to take additional job assignments and shall deploy sufficient
additional security force as & when required by GIPCL during the tenure of the contract.
Additional charges shall be payable at mutually agreed rates.
16. In case of any theft and loss of property of GIPCL on account of negligence of guards, the
same will be reimbursed by the Contractor or alternatively will be adjusted against payments
due to the Contractor.
17. The Contractor shall be responsible for control and overall supervision of security personnel
deployed by him and shall observe all rules and regulations of GIPCL. The security
personnel deployed shall be smart, in proper uniform, properly groomed, should maintain
discipline and decorum.
18. The Contractor shall be responsible for the completion of the job as defined in this tender
and in case he fails to do so; the GIPCL shall recover from the Contractor cost whatsoever
incurred for the same.
19. The day to day instruction for the work and any clarification regarding specifications for the
various items shall be given by the GIPCL's Authorized Officer & his instructions &
clarifications/interpretations shall be final & binding to the Contractor.
20. The Contractor shall have to engage well-trained and experienced civilian and Ex-service
man/guards in shifts and after office hours as well as during holidays according to the
exigencies of the work. No claim or representation on this account shall be entertained by
21. The Contractor shall take full liability of the persons engaged by him. GIPCL reserves the
right to deduct any amount legally justified towards any liability not fulfilled by the Contractor.
22. It is the responsibility of the Security Agency to protect the GIPCL properties, to ensure that
no trespass takes place into company premises and also to ensure that no material is
moved out by anyone by any means without authorization, and in case of an incident, same
shall be brought to the immediate attention of GIPCL management in writing.
23. The Contractor's responsible Officer should take round of the GIPCL's premises during the
night hours, at least once in the fortnight and submit the report in writing to the GIPCL's
Authorized Officer in morning of the next day.
Fire Safety Role
24. The Contractor shall deploy suitably qualified and sufficient manpower for timely &
satisfactorily execution of the works under the contract. Qualification of the fire safety staff
is prescribed below:
a) Fire Supervisor 12th pass,06 months’ fireman course with
minimum 3 years of experience, below the age
b) Fire Driver cum Operator 12th pass,06 months’ Fireman Course, Valid
Heavy Vehicle License, minimum 2 years of
experience, below the age of 50 years.
c) Fireman 12th pass,06 months’ fireman course with
minimum 1 year of experience, below the age of
25. The Contractor shall be responsible for all fire safety control and overall supervision of fire
safety personnel deployed by him and shall observe all rules and regulations of the GIPCL.
The fire safety personnel deployed shall be smart, in proper uniform, properly groomed,
should maintain discipline and decorum.
26. The Contractor shall deploy the necessary Fire Fighting Equipment at critical sites as
required by the Fire Safety Officer of GIPCL. The Contractor shall also conduct the weekly
inspections and replenish any Fire Fighting Equipment found to be faulty, non-functional or
empty. The Contractor shall comply with the industrial Fire Fighting Standard Operating
Procedures and any failure to comply to the would invite necessary penalties as deemed fit
the management of GIPCL.
27. Contractor shall be responsible for providing Fire services at GIPCL as per requirement. In
the event of any shortfall in the number of fire personnel for any reasons whatsoever it will
be contractor’s responsibility to replenish the requisite number of fire personnel and ensure
that at no time post will be left unattended.
28. It must be clearly understood by the contractor that the total strength of the fire personnel
may be differing depending upon various factors. Contractor will reduce or increase strength
as required after consulting head of Fire/Fire department, GIPCL.
29. Fire personnel deployed at site by contractor must be well trained and motivated, smartly
dressed and have a disciplined conduct expected of Firemen. The fire personnel shall not
be found drunken or under influence of drugs while they are on duty. They should be
physically and mentally sound with good eye sight.
30. The contractor shall be responsible for overall administration and discipline of the security
and fire personnel deployed by him as well as for maintenance of equipment required for
efficient performance of duties as per the scope of work and maintain good housekeeping
as required by company.
31. The security and fire personnel so provided shall be contractor’s employees, wholly under
contractor’s direct administrative control and supervision and contractor will be held solely
responsible to take disciplinary action against them if they indulge in any act of misconduct
within the premises of the GIPCL or outside during the tenure of the contract.
32. Adequate reserve for security and fire personnel will be maintained for providing weekly off
to security and fire personnel.
33. Any shortfall in strength may attract penalty up to Rs.250/- per infringement. Decision of
head of Security/Fire department will be final in this matter.
34. Contractor will ensure that payment is made to his security & fire staff by 7th of every month.
The penalty up to Rs.250/- per infringement for each defaulted day may be imposed.
35. Any lapses/ violations by the contractor of any of the terms and conditions, general and
statutory requirements as specified in this bid will be penalized by GIPCL. Defaults like
vacant Post/ indiscipline/ sleeping on duty/ intoxication etc. committed by the security & fire
personnel will invite appropriate punitive measures as decided by competent authority of
36. GIPCL reserves the right to increase and/ or decrease and also to change the norms
regarding deployment of Security & Fire personnel due to exigencies of prevailing
conditions, without giving any reasons. Payment to the contractor will be made as per actual
duty performed and number of security & fire personnel deployed in a month and as per
37. At the time of deploying manpower, the Contractor shall strictly comply all the applicable
labour laws/Acts norms including but not restricted to the age of the workers, women
workers and shall also ensure that a police verification and security check for all the
workmen/labour engaged at the GIPCL is done and necessary documents regarding the
same shall be submitted to the GIPCL’s authorized representative/officer-in-charge. Any
default in complying with the same or any misrepresentation regarding compliance of the
same shall compel GIPCL to initiate appropriate civil or criminal proceedings regarding the
38. The Contractor shall also comply with the safety requirements and provide his
workmen/labour with safety equipment like helmets, masks, gum boots, a uniform
(Minimum 03 pairs for AMC/ARC) and other necessary PPEs for properly undertaking the
operations involved under this contract. Following are also to be issued by contractor:
S.NO. ITEMS QUANTITY REMARK
1 Uniform (yearly) 02 pairs with all Cap, belt, lanyard,
accessories whistle,
2 Lathi 01 Yearly
3 Safety shoes 01 pair Yearly
4 Woolen Jersey 01 Yearly
5 Raincoat 01 Yearly
7 Umbrella Total 10 nos. Yearly
8 Torch (Re-chargeable) As per requirement
39. The contractor will issue good quality of uniform and other PPEs as mentioned above within
30 days of taking over the contract, failing which penalty of Rs.250/- per default will be
imposed till issuance of all the PPEs to the entire fireman deployed in the plant.
40. Contractor shall nominate /authorize senior experienced person in writing as site in-charge
to co-ordinate with GIPCL Security & Fire Officer (in-charge) and who shall bear overall
responsibility for performance of the contract. Such person shall remain always available at
Site or Site office allotted to the contractor at Site. Contractor has to submit the authority
letter and documentary proof for the same.
41. The Contractor shall appoint a supervisor who shall co-ordinate with GIPCL Security & Fire
Officer (in-charge) for daily entrusted job. They have to maintain daily records dully signed
for the works carried out and duly certified by Fire Officer (in-charge).
42. The Contractor in co-ordination with the GIPCL Security & Fire Officer (in-charge) shall
ensure the availability of adequate manpower to carry out the job satisfactorily on a daily
43. Contractor’s supervisor will be responsible for complete supervision of the workforce
engaged by him. He will be responsible for distribution of the duty posts as per requirement
and arrangement for replacement of shortfall of personnel. He will also maintain all relevant
records and report regularly as required under rules.
44. During emergency or similar situations, the Contractor shall be required to mobilize
resources as per need within the period of 24 hours as directed by GIPCL. If the contractor
fails to mobilize sufficient manpower to complete the job in time, GIPCL will execute the job
through other agency at the risk and cost of the contractor with 10% supervision charges &
the same will be recovered from the Contractor’s bill.
45. Important Note: Whenever any of the Unit at Baroda remains under outage due to any
reason attributed to Security & Fire, the contractor shall mobilize sufficient work force at
Site within a period of twenty-four hours from the time of intimation to the Site-in-charge or
via mail to your office. Generation loss occurred due to want of manpower as well as
resources will be viewed very seriously and will invite appropriate punitive measures as
decided by competent authority of GIPCL.
46. During working in high risk area like the workman must wear a suitable safety apron, safety
belt, safety hand gloves and goggles. It is the contractor’s/contractor’s supervisor’s
responsibility to ensure it without fail.
47. In case of fire or any other emergency or if Company receives call from OCR (Off Site
Industrial Emergency Control Room) or any other Central Control and Monitoring Room,
Contractor shall attend to the emergency and assist the fire crew or emergency service
personnel as per the instruction of GIPCL’s Authorized Officer.
48. All the miscellaneous activities pertaining to specific work to be executed for satisfactory
performance is in the scope of Contractor in his quoted rates.
2 FAILURE DURING EMERGENCY
During any emergencies, contractor shall have to carry out the work by deploying additional force
within twenty-four hours’ notice period failing which GIPCL reserves the right to carry out this work
by engaging other party. The expenditure occurred due to such situations, the Contractor will be
held responsible & the same will be recovered from the Contractor’s monthly bill / any other pending
bills along with 10% overhead charges. For repetitive failure of such work for more than two
incidents, GIPCL reserve the right to terminate the entire contract by forfeiting all pending dues,
Security Deposit & other retention money, if any, after giving 15 days’ notice to the contractor &
this will be binding to the contractor.
3 SCOPE OF THE CONTRACTOR
1. Safety PPEs, as required for safe execution of work, should be arranged by the contractor.
2. The Contractor shall have to provide necessary facilities to his workforce at his own cost.
3. Contractor has to depute his full time experienced overall Site-in-charge for day to day work
planning & coordination with Security officer in-charge, to prepare daily location wise
deployment sheet, to conduct work supervision, to maintain statutory & legal compliance
4. The contractor's Field Officer should take round of the GIPCL's premises during the night
hours, at least once in the fortnight, and submit the report in writing to the GIPCL's
Authorized Officer in morning of the next day.
5. The contractor should organize, through its qualified training officer, On the Job Training
(OJT) for its guards at least once in a quarter.
4 DAILY DIARY AND PROGRESS REPORT :
A daily Duty Register will be kept in the security office. The BIDDER will supply all detailed
information every day at 9:00 hours for the day preceding and the register will be jointly signed by
GIPCL’s officer in-charge and the BIDDER’S representative, every day in token of its correctness.
Bidder’s representative will similarly prepare daily Attendance Summary Sheet and obtain
signature of GIPCL’s officer in-charge and the Head of security. The BIDDER’S representative shall
report every day to see these instructions and sign them at the bottom in token of his having seen
5 PRICE & RATES
(a) The rates quoted by the Bidder in the online Price Bid shall be inclusive of cost of all
manpower, supervision, cost of safety supervisor, shifting, transportation, loading,
unloading, equipment, safety equipment & PPEs, Rents, GST, Stamp Duties, Central or
State Government or Local body or Municipal Taxes or Duties, Turn over Tax, Work
Contract Tax, and / or any other duty / tax, levied by the Central, State Government or
other Public bodies etc. and such other costs that are not specifically mentioned herein but
will be incurred by the contractor for the satisfactory and timely completion of the work. The
quoted rates shall be deemed to include for everything mentioned in the specification, all
leads & lifts, contractor’s overheads & profits for due performance of the work under the
contract and such other costs that are not specifically mentioned herein but will be incurred
by the contractor for the satisfactory and timely completion of the work. The rates shall also
include cost for mobilization / demobilization of manpower, equipment, materials, etc.
(b) The price/rate quoted by CONTRACTOR shall be considering mobilization of all required
manpower, tools & tackles, materials, equipment for timely and satisfactory completion of
all scope of work.
(c) The value and/or quantum of work may be increased or decreased depending upon day to
day requirement. However, item rates remain unchanged and the payment shall be made
as per the actual quantity executed as informed & certified by GIPCL officer in-charge.
(d) The rates shall be firm for entire contract period and also during extension, if required and
shall not be subject to any escalation in prices, idle charges for manpower, machinery,
overhead expenses etc. except for variation in Minimum Wages rate.
(e) Variation in Minimum Wage Rate:
i. GIPCL shall pay to the Bidder a lump sum rate per month plus Government Service Taxes
as applicable from time to time, for carrying out the above jobs effectively & efficiently for
the fulfillment of this agreement.
ii. GIPCL shall reimburse the PF amount based on actual manpower deployed. PF amount
shall be reimbursed on actual contribution deposited and on submission of proof for the
same by the Bidder.
iii. The increase or decrease in basic rate as per Minimum Wage Act by the Government will
be calculated and effect will be given with effective date as per Government notification.
iv. The increase or decrease in Special Allowances(if applicable) as per Minimum Wage Act
notified by the Government will be reimbursed separately at the end of Month period on
actual basis, subject to successful compliance of all obligations under the Contract.
v. Minimum Wage Rates prevailing during 01/10/2024 to 31/03/2025 will be the benchmark
rates for the purpose of calculating the said increase or decrease, as stated at clauses (c)
6 CONTRACT PERIOD
Contract period will two years from the date of issue of LoI or Work Order whichever is earlier.
Mobilization period will be 07 to 15 days from the date of issue of LoI or Work Order, whichever
7 TERMS OF PAYMENT
The contractor shall raise the location wise separate running invoices in duplicate every month in
respect of the work performed or completed during the month along with the documents as
hereinafter provided. On receipt of the invoice complete in all respects and with all the said
documents, the payment in respect of the same shall be made within 15 days of such receipt of a
complete invoice as per the following terms of payment:
(i) 100% of monthly RA bill along with 100% taxes shall be released against the work
executed duly certified by GIPCL. Income Tax (IT) will be deducted at source from
monthly RA bills as per the rules in force.
(ii) Security deposit at 10% of Annual contract value excluding taxes & duties shall be
submitted as per clause no.: 1 of Section-C.
(iii) GST shall be paid along with bills after fulfilment of following terms:
(a) Submission of copy of registration certificate issued by GST Authority (to be
furnished only once).
(b) Citing the Goods and service Tax Registration no. and the date of issue of
registration certificate on invoices.
(c) Claim of GST amount with percentage (%) separately shown on the invoices.
(d) The contractor shall be required to submit the proof of payment of GST of previous
month/quarter, as may be applicable as & when demanded by
GIPCL/Owner/company.
(e) The Bidder shall inform the GIPCL in the event of cancellation of its registration
certificate cancelled or discontinued for whatsoever reason.
(iv) The Contractor shall furnish the checklist as per ANNEXURE-A enclosed with the
Section-F of tender document along with the RA bill of respective month.
(v) While making running account payment, the following deductions may be made by
GIPCL, if applicable:
1. Cost of material issued, if any, by GIPCL & to the extent consumed in the work.
2. Security deposit recoverable if any.
3. Advance on materials / work progress advance payments, if any.
4. LD/Penalty for delayed delivery, penalty for delayed execution of work, recovery of
charges for the work done by other contractor due to delay or any other reason, if
5. Any other dues recoverable by GIPCL from the contractor under the contract.
(vi) The contractor along with monthly RA Bill shall submit copy of P.F. Challan, wages
register of previous month, attendance sheet of respective month & ECR statement
indicating the employee and employer's P.F contribution of previous month with
respect of employees employed by him for the contract at GIPCL Site.
(vii) The Contractor shall submit his Final Bill within a period of four months of the
expiration or earlier termination of the contract or any extensions that may be granted
by GIPCL to the Contractor. GIPCL shall not entertain any bill for any work item after
expiration of period of four months.
(viii) The Contractor shall include all his claims in the Final Bill submitted by him and
accordingly the final bill submitted by the Contractor shall be deemed to be inclusive
of all and whatsoever the claims that the Contractor may have from GIPCL. The
Contractor shall not be entitled to claim any amounts which are not mentioned in the
Final Bill and the Contractor shall be deemed to have waived any claims not
mentioned in the Final Bill and shall not be entitled to recover the same from GIPCL
subsequent to the submission of the Final Bill on any account and GIPCL shall stand
absolved of all its liabilities in respect of any such claims not raised by the Contractor
in his Final Bill.
8. SUBMISSION OF STATUTORY COMPLIANCES WITH EACH BILL
Contractor shall submit each RA bill of work carried out along with following documents.
(i) Copy of statutory compliance like Labour License, Wages Payment Register, EC
Policy, PF paid Challan with ECR, etc… along wage certificate pertaining to
respective bill period.
(ii) Notarized Indemnity Bond as per Performa, in case of Final bill.
(iii) No claim - No arbitration certificate as per Performa, after releasing final bill
Bill submitted without any of the above documents shall not be processed for payment.
9. MOBILIZATION AND EXECUTION
a) Contractor shall mobilize the resources at Site within 7 to 15 days from the time the
intimation given by GIPCL.
b) Contractor shall provide required separate & independent Site supervisors who will
be responsible for supervision and execution of job in specified time with respect to
quality, specifications, Site preparations, safety, co-ordination with GIPCL, issue of
work permits, joint measurements, etc... The supervisors shall coordinate with the
Security Officer in charge of GIPCL for proper execution of the job.
c) The resources required for execution of work detailed in the Scope of Work will vary
from time to time. Hence, contractor shall mobilize the resources accordingly.
10. QUANTITY OF WORK
The estimated quantities of work required to be carried out by the contractor are as given
in the Section-E (Schedule of Quantity) estimated and shall vary according to the
exigencies of work at Site. However, the rates quoted by Bidder shall remain firm
irrespective of any variation in estimated quantities. Contractors shall engage required nos.
of guards along with required tools & tackles as per work load and emergency situations
throughout the contract period to perform his contractual duties.
In case, contract quantity/amount gets exhausted before completion of contract period,
GIPCL reserve the rights to increase the quantities or contract amount for successful
completion of work for the entire contract period. Contractor shall be responsible to
complete the particular job up to entire satisfaction of security officer in-charge. The item
rates remain firm & unchanged till completion of the contract and any agreed extensions
thereafter and shall not be subject to any escalation, idle charges for labor, machinery,
overhead expenses etc. for any reason whatsoever. The quantum of work of individual
item may be up to any extent depending upon requirement. However, item rate remains
unchanged. Under this contract, contractor has to execute all work as per the Plant
11. GENERAL CONDITIONS OF CONTRACT
General Conditions of Contract (Section-C) and detail specification prepared by GIPCL will
be applicable for this contract. The same is enclosed herewith. Bidders are advised to go
through the same.
Where any portion of the general conditions of contract is repugnant to or at variance with
any provisions of the special conditions of contract, then unless a different intention
appears, the provision of the special conditions of contract shall prevail to the extent of
such repugnancy of variance.
SCHEDULE OF QUANTITIES & RATES
Sr. Item Uni Qty. Unit Total Total Amount
Sr. Item Uni Qty. Unit Total Total Amount
No t (Per day Rate Amoun for one year
. 24 Hrs.) (In t of considering
Rs.) Qty. 365 days (In
1 Deputation of Security Man
officer. days 01 762.21 762.21
2 Deputation of Security Man
Supervisor. days 03 732.21 2196.63
3 Deputation of Gun Man. Man
4 Deputation of Security Guard Man
(Ex-Serviceman) days 15 672.39 10085.85
5 Deputation of Security Guard Man
(Civilian) days 06 657.92 3947.52
6 Deputation of Driver-cum- Man
Operator. days 03 685.55 2056.65
7 Deputation of Security Man
Guard-cum-fireman. days 12 685.55 8226.60
8 TOTAL AMOUNT PER
8 TOTAL AMOUNT PER
YEAR (Excluding GST)
9 TOTAL AMOUNT FOR
9 TOTAL AMOUNT FOR
(Excluding GST)
(a) At the same rate as per To be quoted
schedule of rates. online thru
(b) …...% above schedule of To be quoted
rates online thru
(1) The above SOR is calculated as per present minimum wages applicable (w.e.f 01.10.2025)
which includes Basic Pay Rs.462.00 for skilled worker, Rs.452.00 for semi-skilled worker,
Rs. 411.00 for un skilled worker + Special allowance Rs.48.50 for all category of worker.
(2) The unit rate indicated above includes basic pay, special allowance, PF, Bonus, PL/PH,
ESIC, workmen compensation, Transportation, special adhoc allowance, shift
allowance, remote working, medical & medical checkup / accident / causality / insurance,
tools tackles, uniform and safety appliances, license etc.
(3) GST as applicable will be paid extra by GIPCL on production of documentary evidence
of payment of GST.
(4) The rates shall include all manpower cost, equipments, supervision, consumables, tools,
tackles, all taxes & duties (excluding GST).
(5) Percentage rate offered / bid price on SOR value & GST shall be quoted through on line
(n)-Procure only. Hard copy of price bid shall not be considered / accepted.
(6) Evaluation of the tender will be done on gross total quoted amount with GST.
(7) Bidder shall have to quote the rates in the form of percentage (%). i.e. “At Estimated
Value (0% Zero%) OR______% above the estimated value.” (Negative% OR % below
estimated value will be considered at par with SoR Value.)
(8) If two or more bidders who have quoted at par with SoR Value, then overall lowest bidder
will be considered on the basis of higher net worth of year Financial Year 2024-25.
(9) My rates are as under (Only to be quoted online thru n-procure)
At estimated Value
………. % age above the estimated value
APPLICABLE GST TAX SLAB BID:
SR. NO. DESCRIPTION APPLICABLE GST
1 SECTION-E FOR SCHEDULE OF RATE FOR SECURITY
OFFICER,SUPERVISOR,GUNMAN,SECURITY GUARD AND
DRIVER CUM OPERATOR
Kindly note that all bidders shall mention specifically GST rate applicable in the above-
mentioned Annexure. GIPCL may consider GST as inclusive if they do not mention / left
blank GST column as herein above.
Place: Name & Designation of Officer Seal
LIST OF ANNEXURES & FORMS
CHECKLIST FOR PASSING THE BILLS
For the month of :
1) Work Order / P.O. No. & :
2) Nature of work :
3) Duration of Work Order : From to
4) Maxi. No. of manpower per day : M F Total
deployed in the month.
5) Details of Labor License : Valid up to for
6) Details of E.C Policy : Valid up to for
7) Documents attached for verification : Wage & Attendance Sheets.
for the previous month. Yes/No
P.F Challan Yes/No
8) Documents attached for verification : Bonus Payment Register
(in case of Final Bill) Yes/No
: Leave wage register Yes/No
9) Security Deposit / Retention Money : Yes / No if yes, Rs.
Date : Signature of Contractor
with official stamp
PROFORMA FOR CONTRACT SECURITY-CUM-PERFORMANCE
GUARANTEE BY SELLER / CONTRACTOR.
(To be executed on non-judicial stamped paper of approximate value)
1.WHEREAS Gujarat Industries Power Company Limited having its office at PO: R A N O L I
Dist. Vadodara – 391 350, Gujarat State, India (hereinafter referred to as “The Company/Owner”
w h i c h expressions sh all unless repugnant to the subject or context includes its legal
representatives, successors and assigns) has entered into a contract with M/s………….
………………………………. / has placed a purchase order on M/s…………………………. (hereinafter
referred to as “Contractor(s) / Seller(s)” which e x p r e s s i o n shall u n l e s s repugnant to the
subject or context includes their legal representatives, successors and assigns)
for…………………………….on the terms and conditions as set out inter alia, in the
Company‟s contract No. / P.O.No.…………..date …………and various documents forming part
thereof hereinafter referred to as the “said contract” which expression include all
amendments, modifications and /or variations thereto and where as the Contractor(s) /
Seller(s) has agreed for due execution of the entire contract and guarantees its
performance including any parts executed through any other agencies/ subcontractors
AND WHERE AS one of the conditions of the “said contract” is that “contractor(s) / seller(s) shall
furnish to the owner a Bank Guarantee from a bank for ….% (……….percent) of the total value
of the “said contract” against due and faithful performance of the “said contract” including
performance guarantee obligations of the contractor(s) / seller(s) for execution / supplies
made under the “said contract.”
2. We …………………………….Bank having its branch office at ……….……..do hereby
agree and undertake to pay the amount due and payable under this guarantee without any
demur merely on a demand from the Company stating that in the opinion of the Company,
which is final & binding, the amount claimed is due by reason of default made by the
Contractor(s)/ Seller(s) in performing any of the terms & conditions of the said Contract
including defect liability obligations, in fulfilling the performance guarantee obligation or loss or
damage caused to or would be caused to or suffered by the Company by reason of any
breach by the said Contractor (s)/ Seller(s) of any of the terms & conditions of the contract. Any
such demand made on the Bank by the owner shall be conclusive as regards the amount due
and payable by the Bank under this guarantee. However, our liability under this
guarantee shall be restricted to Rs. ……(Rupees………………………only).
3.We undertake to pay to the Company any money so demanded not withstanding any
dispute or disputes raised by the contractor(s)/ Seller(s) in any suit or proceeding pending
before any office, court or tribunal relating thereto our liability under this present guarantee being
absolute and unequivocal. The payment so made by us under this bond shall be a valid
discharge of our liability for payment there under. Our liability to pay is not dependent or
conditional on the owner proceeding against the Contractor(s)/ Seller(s).
4. The guarantee herein contained shall n o t be determined or affected or suspended
by the liquidation or winding up,dissolution or change of constitution or insolvency of the said
Contractor(s) / Seller(s) but shall in all respect and for all purposes be binding and operative
until payment of all money due or liabilities under the said contract(s) / Order(s) are fulfilled.
5 The Bank further unconditionally agrees with Gujarat Industries Power Company Limited (GIPCL)
that Gujarat Industries Power Company Limited (GIPCL) shall be at liberty, without the Bank’s
consent and without affecting in any manner the Bank’s obligation under this Guarantee, from time
a. Vary and / or modify any of the terms and conditions of the Agreement.
b. Extend and / or postpone the time for performance of the obligations of the Contractor
under the Agreement.
c. Forbear or enforce any of the rights exercisable by Gujarat Industries Power Company Limited
(GIPCL) against the Contractor under the terms and conditions of the Agreement.
6. This guarantee shall be in addition to and not in substitution or in derogation of any other
security held by Gujarat Industries Power Company Limited (GIPCL) to secure the performance of
the obligations of the Contractor under the Agreement.
7. No action, event or condition, which by any Applicable Law should operate to discharge the Bank
from liability hereunder, shall have any effect and the Bank hereby waives any right it may have to
apply such law, so that in all respects its liability hereunder shall be irrevocable and, except as
stated herein, unconditional in all respects.
8. This guarantee will remain valid up ____________________ days or ______________
whichever is earlier. The Bank undertakes not to revoke this guarantee during its currency without
previous consent of the OWNER/PURCHASER and further agrees that if this guarantee is
extended for a period as mutually agreed between bidder & owner/purchaser, the guarantee shall
be valid for a period so extended provided that a written request for such extension is received
before the expiry of validity of guarantee.
9. W e ……………Bank further agree with the Company that the company shall have the fullest
liberty without our consent and without affecting in any manner our obligations hereunder to
vary any of the terms and conditions of the said Contract(s)/ Order(s) or to extend the time
of performance by the said Contractor(s) Seller(s) from time to time or to postpone for any time
or from time to time any of the powers exercisable by the Company against the said
Contractor(s)/ Seller(s) and to forbear or enforce any of the terms and conditions relating to the
said Contract(s) / Order(s) and we shall not be relieved from our liability by reason of any such
variation, or extension being granted to the said Contractor (s) / Seller(s) or for any
forbearance, act or omission on the part of the Company or any indulgence by the
Company to the said Contractor(s)/Seller(s) or by any such matter or thing whatsoever which
under the law relating to sureties would, but for this provision, have affect of so relieving us.
10. Notwithstanding anything contained herein before, our liability shall not exceed
Rs………(Rupees…………only) and shall remain in force till..……..Unless a demand or
claim under this Guarantee is made on us within three months from the date of expiry we
shall be discharged from all the liabilities under this guarantee.
Date………. …………………………. Bank
Corporate Seal of the Bank By
its constitutional Attorney
Signature of duly Authorized
person on behalf of the Bank
with Seal & Signature code
Note: BGs to be furnished from any of the banks listed here under.
PROFORMA FOR BANK GUARANTEE FOR EARNEST MONEY DEPOSIT – (EMD)
(To be executed on non-judicial stamped paper of appropriate value)
1.WHEREAS M/s.Gujarat Industries Power Company Limited having its Corporate Office at PO:
R A N O L I , Dist. Vadodara – 391 350, Gujarat State, India (hereinafter called “The Company
Owner” which expression shall unless repugnant to the subject or context includes its legal
representatives, successors and assigns) has issued tender paper vide its Tender
“the Said tender”) to M/s.……………………………(hereinafter called the said Tenderer(s)”
which expression shall unless repugnant to the subject or context includes their legal
representatives, successors and assigns and as per terms and conditions of the said tender,
the tenderer shall submit a Bank guarantee for Rs.………. (Rupees……………...only) towards
earnest money in lieu of cash.
2. We ……………………………. Bank having its branch office at ……… do hereby undertake to
pay the amount due and payable under this guarantee without any demur, merely on a demand
from the Company stating that in the opinion of the company which is final and binding, the
amount claimed is due because of any withdrawal of the tender or any material alteration to
the tender after the opening of the tender by way of any loss or damage caused to or would be
caused or suffered by the Company by reason of any breach by the said tenderer(s) of any of the
terms and conditions contained in the said tender or failure to accept the letter of Intent
Agreement or that the amount covered under this Guarantee is forfeited. Any
such demand made on the Bank by the owner shall be conclusive as regards the amount due and
payable by the Bank under this guarantee, However, our liability under this guarantee shall be
restricted to an amount not exceeding Rs………………..(Rupees………………..only).
3.We undertake to pay to the Company any money so demanded not withstanding any dispute or
disputes raised by the tenderer (s) in any suit or proceeding pending before any office, court
or tribunal relating thereto our liability under this present guarantee being absolute and unequivocal.
The payment so made by us under this bond shall be a valid discharge of our liability for payment
there under. Our liability to pay is not dependent or conditional on the owner proceeding
against the tenderer.
4.The guarantee herein contained shall not be determined or affected or suspended by the
liquidation or winding up, dissolution or change of constitution or insolvency of the said
tenderer(s) but shall in all respect and for all purposes be binding and operative until payment
of all money due or liabilities under the said contract(s)/ Order(s) are fulfilled.
5. The Bank further unconditionally agrees with Gujarat Industries Power Company Limited
(GIPCL) that Gujarat Industries Power Company Limited (GIPCL) shall be at liberty, without
the Bank’s consent and without affecting in any manner the Bank’s obligation under th is
Guarantee, from time to time, to:
a. Vary and / or modify any of the terms and conditions of the Agreement.
b. Extend and / or postpone the time for performance of the obligations of the Contractor
under the Agreement.
c. Forbear or enforce any of the rights exercisable by Gujarat Industries Power Company Limited
(GIPCL) against the Contractor under the terms and conditions of the Agreement.
6. This guarantee shall be in addition to and not in substitution or in derogation of any other security
held by Gujarat Industries Power Company Limited (GIPCL) to secure the performance of the
obligations of the Contractor under the Agreement.
7. No action, event or condition, which by any Applicable Law should operate to discharge the
Bank from liability hereunder, shall have any effect and the Bank hereby waives any right it may have
to apply such law, so that in all respects its liability hereunder shall be irrevocable and, except as
stated herein, unconditional in all respects.
8. We ……………..Bank Ltd. further agree that the guarantee herein contained shall remain in full
force and effect during the period that would be taken for the finalization of the said tender
and that it shall continue to be enforceable till the said tender is finally decided and order placed
on the successful tenderer(s) and or till all the dues of the company under or by virtue of the said
tender have been fully paid and its claims satisfied or discharged or till a duly authorized officer of
the company certifies that the terms and conditions of the said tender have been fully and properly
carried out by the said tenderer (s) and accordingly discharges the guarantee.
9. That the Owner Company will have full liberty without reference to us and without affecting this
guarantee to postpone for any time or from time to time the exercise of any of the power of the
owner under the tender.
10. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………………. (Rupees…………………………only) and shall remain in force till…………….
(Date to be filled up shall be 180 days from the date of submission of Bid).
Date………. ………………………… Bank Corporate Seal
of the Bank By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank with Seal & Signature code
Note: BGs to be furnished from any of the banks listed here under.
LIST OF BANKS FOR EMD AND BANK GUARANTEE
1. All Nationalized Banks
5. Kotak Mahindra Bank
6. IndusInd Bank
9. Federal Bank
10. Bandhan Bank
11. Standard Chartered Bank
Please note that NO OTHER BANKS bank guarantee will be accepted other than above list.
Bank details for Bank guarantee are as under:
Name and Address of Gujarat Industries Power Company Limited,
the Beneficiary P.O. Ranoli, Vadodara -
Bank of Beneficiary State Bank of India
Bank Account No. of
IFSC Code of account
PERFORMA CERTIFICATE
(No claim, No arbitration)
M/s. GUJARAT INDUSTRIES POWER COMPANY LTD.
P.O. Ranoli-391350,
We hereby confirm with free consent as under:-
1. The measurements certified in final bill is full and final. We accept all the certified
measurements and no claim related to the measurement is left.
2. The payment certified in that or above referred LoI / contract is full and final. We accept this,
and no claim related to payment is left.
3. The rates of the LoI / contract and its amendments are firm till completion of contract and
extension period. We shall not claim any escalation against these rates.
4. Along with the contract referred, the ARBITRATION CLAUSE also perishes i.e. we will not
resort to arbitration.
5. No extra items are left to be settled.
6. We do not have any claims against any item related to the LoI than those items certified in the
7. We are accepting the recoveries or hold amount from our bills, if any, made by GIPCL against
noncompliance or as decided by GIPCL within terms & conditions of contract.
8. We have paid royalties, taxes for all the materials procured by us, for carrying out the works for
above LoI and we indemnify GIPCL from any liability arising thereof.
9. In case of any disputes arising in future related to payment of royalties, all liabilities of settlement
of dispute and its payment if any, will be borne by us.
10. We have paid wages to all the workmen/guards who were deployed by us for carrying out
above referred work as per prevailing Minimum wages act. We have also fulfilled all
requirements of the P.F. Act. We have maintained all records necessary as per the statutory
requirements. We hereby indemnify GIPCL from any disputes arising in future related to
payment of guards, Provident Fund, etc. and confirm that all liabilities of settlements of disputes
and their payment is our responsibility.
The above confirmation will come into effect as soon as payment from final bill after due
recoveries will be received by us.
Signature, Stamp and date.
List of qualifying staff to be submitted with physical documents
Sr. No. Name of Supervisor Qualification Experience
Contractor / Authorized Representative’s
Signature, Company’s / Organization’s Seal & Date
Declaration cum Undertaking for Safety Laws and Regulations Compliance
(To be submitted on Company’s Letter Head)
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm, agree and
undertake that all the Statutory and Safety Laws and Regulations of the applicable Authority/ies shall be
strictly followed for all types of works at the site during the period of the Contract, if awarded to me.
Signed and Stamped by the
Authorized Signatory
Declaration for Contractual Litigations
(To be submitted on Company’s Letter Head)
Please Tick (√) whichever is correct option
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm that I /We
a. Not invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings / Depts.
/ Authorities and Govt. of Gujarat supported companies / undertakings / organizations for the
last three (03) years. There are no ongoing/pending legal matter(s) with any of the Govt. of
Gujarat Undertakings / GoG supported Companies, including GIPCL.
Please Tick ( )
b. Invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings / Depts. /
Authorities and Govt. of Gujarat supported companies / undertakings / organizations for the
last three (03) years.
Please Tick ( )
If “b” is applicable, please submit the details for the same.
The above is true, as on date, to the best of my knowledge. Any breach/ false statement in this regard shall
amount to disqualification of the Bid being submitted herein.
Signed and Stamped by the
Authorized Signatory
Schedule of Deviation from Technical Specification and Commercial Terms and
All the deviations from the terms & conditions of contract shall be filled by BIDDER clause by clause
in this schedule.
CLAUSE AS PER TENDER
Sr. No SECTION DEVIATION
The bidder here by certifies that the above mentioned are the only deviations from OWNER’s Tender enquiry.
The bidder further confirms that in the events any other data and information presented in the BIDDER’s
proposal and accompanying documents are at variance with specific requirements laid out in the OWNER’s
Tender Document, then the latter shall govern and will be binding on the BIDDER for quoted price.
DOCUMENTS FOR PRE-QUALIFICATION BID FOR ARC OF SECURITY, VIGILANCE
& FIRE SERVICES – GIPCL – BARODA.
01 Name of Security Agency / Bidder &
Location of Registered / Head Office.
02 Local Office in Baroda city with
Address, Telephone Nos. and Mobile
03 Name of the Proprietor with contact
04 Date & Place of Registration of
Agency / Bidder (with supporting
(Minimum Five Years experience)
05 PF No. (with supporting documents)
06 PAN NO. (with supporting
07 GST Certificate (with supporting
08 The Police Clearance Certificate for
09 Annual Turnover *
(Please attach latest copy of
Appendix-A) Minimum average
turnover to be approx. Rs. Four
10 Total number of Branches in
Gujarat. As well as in India.
11 Total number of Ex-Servicemen man
employed by your Agency.
13 Work order and Performance
certificates from three different
14 Present List of servicing clients
details as per attached format.
15 Any other additional information’s.
16 Deviation sheet, if any deviation is
taken to the conditions of Tender
(If any deviation is not taken than
also attached deviation sheet
indicating NO DEVIATION)
• Copy of Audited A/c’s must be attached.
Date: Name & Signature of Bidder & official seal
(On bidder’s Firm’s Letter Head)
I / We ______________________________________________ authorized signatory of
M/s _____________________________________ here by certify that M/s
_________________________________________ is not related with other firms who
have submitted tenders for the same items under this inquiry / Tender for the work of
Biannual Rate Contract for running of Industrial Canteen at the Plant premises located at
GIPCL, AT & POST: RANOLI-391350, DIST: VADODARA.
Seal of the Firm Signature of the Bidder
With Designation
(On bidder’s Firm’s Letter Head)
Declaration Cum Undertaking for Safety Laws and Regulations Compliance
I ______________________ on behalf of ………Name of Party/Company………...hereby confirm, agree and
undertake that all the Statutory and Safety Laws and Regulations of the applicable Authority/ies shall be
strictly followed for all types of works at GIPCL site during the period of the Contract, if awarded to me.
Further, I ……..Name of Party/Company…… also hereby confirm, declare and undertake that there has not
been any major Safety Violation and any single Fatal Accident at any site(s) during the execution of the
contract/contracts awarded to me during the period of preceding Three years.
Signed and Stamped by the
Authorized Signatory
(On bidder’s Firm’s Letter Head)
Declaration for Contractual Disputes/ Litigations
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm that I/We
have not been engaged in any Industrial Dispute(S) or have invoked legal recourse e.g. Arbitration and/or
litigation against any Govt, of Gujarat Undertakings / Depts. / Authorities and Govt. of Gujarat supported
companies / undertakings / organizations for the last Five (05) years. There are no ongoing/pending legal
matter(s) with any of the Govt. of Gujarat Undertakings / GoG supported Companies, including GIPCL.
I/We also confirm that M/s …………….. ……. Have not been Blacklisted/ deregistered / listed under stop
Deal by any Govt, of Gujarat Undertakings / Depts. / Authorities and Govt. of Gujarat supported companies
/ undertakings / organizations , including GIPCL for the last Five (05) years.
The above is true, as on date, to the best of my knowledge. Any breach/ false statement in this regard shall
amount to disqualification of the Bid being submitted herein.
Signed and Stamped by the
Authorized Signatory
(On bidder’s Firm’s Letter Head)
I / We ______________________________________________ authorized signatory of
M/s _____________________________________ here by certify that M/s
_________________________________________ has not been black listed,
deregistered as under by any Government / Semi Government / Public Sector
Undertaking / Private sector in last Five years.
Seal of the Firm Signature of the Bidder
With Designation
LIST OF CLIENTS
NAME & LOCATION OF CLIENTS SECURITY PERIOD
No. NAME OF HOD
WITH PHONE NUMBER
ESM CIVIL FROM TO
Contractor / Authorized Representative’s
Signature, Company’s / Organization’s Seal & Date
CERTIFICATE OF COMPLIANCE BY CONTRACTOR
of .........................to .......................... at Gujarat Industries Power Company Limited – P.O.
Ranoli – 391350, Dist. Vadodara. I undertake to be bound by all the provisions of the Contract
Labour (Regulation & Abolition) Act 1970 and the Contract Labour (Regulation & Abolition) Rules
1972, The Employees’ Provident Funds and Miscellaneous Provisions Act 1952, Minimum
Wages Act 1948, Payment of Wages Act 1936 and Payment of Bonus Act 1965 and all other
applicable labour laws in so far as the provisions are applicable to me in respect of the
employment of contract labour by me for the month of ................................
Authorized Signature with Stamp
GUJARAT INDUSTRIES POWER COMPANY LIMITED
P.O: RANOLI-391350, DIST: BARODA
Reference PO Number Date:
Integrity Pact No.: Contract Period
To create an environment where Business Confidence is built through best business practices and
Is fostered in an atmosphere of trust and respect between providers of goods and services and their users
for the benefit of stakeholder, society and the nation.
GIPCL'S COMMITMENT PARTY'S COMMITMENT
To maintain the highest ethical standards in Not to bring pressure / recommendation from
business and professions outside GIPCL to influence its decision.
To ensure maximum transparency to the Not to use intimidation, threat, inducement or
Satisfaction of all stakeholders. pressure of any kind on GIPCL or any of it's
To fulfill the terms of agreement / contract and To be prompt and reasonable in fulfilling the
to consider objectively the viewpoints of other contract, agreement and legal obligations.
To ensure regular and timely release of To provide goods and / or services timely as
payments for works done/services provided per agreed quality and specifications.
To ensure that no improper demand is made by To maintain the general discipline in our
Employees or by anyone on our behalf. dealings and transactions.
To give maximum possible assistance to all the To be truthful and honest in furnishing
Vendors / Suppliers / Service Provider and information.
others to enable them to complete the works in
To provide all necessary information to suppliers Not to divulge to others any information,
/ contractors relating to contract / job to facilitate business details about GIPCL made
them to complete the contract / job successfully available during the course of business
in time. relationship without the written consent of
To ensure that no hurdles are caused to Not to enter into cartel / understanding
vendors /suppliers / contractors in execution of whether formal or informal so as to influence
agreement / contract / work. the price.
Seal & Signature Seal & Signature
(GIPCL's Authorized Signatory) (Party's Authorized Signatory)
Designation : Designation :
(Note: It is voluntary on the part of the second party to sign the Ethics Pact, but efforts are made by GIPCL
Management to convince it to sign the same. For this purpose, the second party (i.e.
Contractor / vendor / supplier / service provider) is at liberty to suggest changes in the contents of the Ethics
Pact to suit its comfort level.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Final Tender Security Fire Baroda 2026 28.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .