| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC THEKKEVEEDU VELICHIKALA PO KOLLAM | KOLLAM | KERALA | 689694 | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.9 L+₹13,624.85 (2.35%)Rejected-AOC GOPIKA BHAVAN MARUTHAMONPPALLY POOYAPPALLY P O | THIRUVANANTHAPURAM | KERALA | 695001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹6.2 L+₹38,113.62 (6.57%)Rejected-AOC MADATHIN PADICAL HOUSE K S MANGALAM VAIKAM 686608 | KOTTAYAM | KERALA | 686608 | L3 | Rejected-AOC L3 | |
| 4 | L4₹6.2 L+₹43,169.78 (7.44%)Rejected-AOC KARTHIKA EZHUKONE EZHUKONE 691505 KOLLAM | KOLLAM | KERALA | 691505 | L4 | Rejected-AOC L4 |
Tender Value
₹6.3 L
EMD Value
₹15,815
Closing Date
12 Apr 2023, 5:00 pmClosed
Assistant Executive Engineer
KIP LB Subdivision No 19 Kottiyam
DEPOSIT Construction of Bridge across KIP Paravoor distributary at ch.10500 Mundakavila KIP canal Village office road in Chirakkara Panchayath
2023_Irrig_570208_1
IRR/PII/TR/8023/2022_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
150 days
Near Chirakkara Village Office
Please refer tender document
7 documents required · 7 mandatory
₹1,395
Yes
₹15,815
Yes
31 May 2023
31 Mar 2023
19 Apr 2023
31 Mar 2023
12 Apr 2023
31 Mar 2023
Amount
1 appendix A:Bridge construction and other allied works
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.2.3:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.2.5:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 ( 1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
OD21374/2022-2023: Name board of size 75X60 cm installed in the appropriate place visible to the public made of brick wall with granite plaque should be inserted and engraving letters etc. complete as per departmental officers at site.
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm
RENJITH G
SAJI P.C. CONTRCATOR
K.S. CHANDRALAL
Bidder Name
K.S. CHANDRALAL
SAJI P.C. CONTRCATOR
RENJITH G
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_841719.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .