Loading…
Loading…
Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
21 Oct 2026, 5:30 pm
ACE,CC,Burla
O/o the ACE, CC, Burla
Improvement to Barkarley Distributary within RD.00m to RD.3400m for the Year 2026-27
2026_CEBBU_142638_1
ACECCB-02(06)/2026-27
Open Tender
Civil Works - Canal
Percentage
335 days
Barkarley, Barpali
Please refer to the DTCN
2 documents required · 2 mandatory
₹10,000
₹2.5 L
Yes
6 Oct 2026
6 Oct 2026
22 Oct 2026
6 Oct 2026
21 Oct 2026
6 Oct 2026
6 Oct 2026 - 21 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing shrub jungles uprooting stumps and small bushes and trees below 1 mtr girth on premeasurant as directed by Engineer-in-charge. | 15,500 | Sqm | 2.9 | ₹44,950 |
| 2 | Excavation,loading, unloading and carriage by mechanical means of all kind of soil including stoney earth gravel and moorum etc. interspread with boulders up to 1/2 cum size with all lifts and delifts including trimming of slope and bed to design section and depositing the excavated materials a way from work site a per the specification and as directed by the Engineer-in-charge within initial lead of 1 Km from the place of excavation complete.for excavation of foundation. | 3,046.4 | Cum | 81.9 | ₹2,49,500.16 |
| 3 | Filling foundation and plinth with sand including cost, conveyance & royalty of all materials to the work site including watering & ramming with all leads, lifts, sundries & T&P etc . complete, as per direction of Engineer-in-Charge. | 1,904 | Cum | 738.7 | ₹14,06,484.8 |
| 4 | Providing and laying reinforced cement concrete confirming to M-20 grade in approved surface using 20 mm size & down graded hard granite well graded crusher broken stone aggregate sharp sand and cement of approved grading and quality confirming to the specification,mixing in concrete mixer/batching and mixing plant with with all leads, delifts and transportation by mechanical /manual means including cost, carriage,royality of all materials and cess including laying of 100micron polythene films,dewatering by suitable means,supplying T&P curing for specified days by suitable means,supervision charges incluing mobilisation and demobilisation with cost of construction and dismaintling of gangways and scaffolding,chute,coffer dam with all materials,hire & running charges of machineries required for the work,approach road , diversion road & site illumination etc. as per approved drawings and specification complete with all costs incidental to the work and as directed by Engineer-in-charge. | 2,213.4 | Cum | 6,620.3 | ₹1,46,53,372.02 |
| 5 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification including cost, convenyance and royality of all materials to site, T&P sundries, etc. complete as per direction of Engineer- in- charge. | 731.15 | Qntl | 9,319 | ₹68,13,586.85 |
| 6 | Rigid smooth centering & shuttering for cement concrete works including false work & dismantling after casting and clearing the debries from worksite with all leads,lifts, sundries including cost ,conveyance labour T&P etc. complete as directed by Engineer-in-charge | 7,140 | Sqm | 249.8 | ₹17,83,572 |
| 7 | Filling in foundation and Plinth with excavated materials incluiding watering ,ramming etc complete as per direction of Engineer in charge | 1,015.47 | Cum | 157.2 | ₹1,59,631.41 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_612394.xls
BOQ • 0.26 MB
BarkarleyDTCN.pdf
Tender Documents • 9.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .