The Executive Engineer
Maintenance and Repair work of Kotada Distry LD-11 , Dhandhuka Distry LD-12,Charpura Distry LD-14 and Its minors under the command of LBC for 2025-26
280052
50 of 2025-26
Open
Civil Works - Canal
Works
Surendranagar
6 documents required · 6 mandatory
₹4,248
Yes
Executive Engineer SBC Dn No.4/1 Limbdi
₹1.4 L
Yes
24 Feb 2026
24 Feb 2026
24 Feb 2026
16 Mar 2026
24 Feb 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer
may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it
is otherwise provided under the Contract, include all construction plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered in
the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for the
related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the
contract documentation shall be made before entering rates or prices against each item
in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Canal work Road and Bridge works. For building works
specifications for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic error pursuant to Clause
29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed air
drilling for its removal, and which cannot be extracted by ripping with a tractor of at
least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Name of Division: Executive Engineer, S.B.C. Dn. No. 4/1, Limbdi.
Name of Work: - Maintenance and Repair work of Kotada Distry LD-11 , Dhandhuka
Distry LD-12,Charpura Distry LD-14 and Its minors under the command
of LBC for 2025-26
Description of Item Quantity Unit Amount in Rs.
Dismantaling the existing
cement concrete lining from
canal bed and slope including
removing all dismantled
concrete outside the canal land
within lead of 150m and with
all lifts as directed.
(a) 7.5 cm Thick Lining.
Excavation in All sorts of Strata
and Formations incl. depositing
the unuseful excavated stuff as
and where directed incl sorting
and stacking useful material as
2 directed up to 30 mt lead etc. 2200.00 Cum 93.00
complete incl. (Depth 3.0 TO
mt) dewatering. For all type
canal & foundation trenches of
C.D. Works. A) In Overburden
incl. Hard Murrum.
Earthwork / Back filling with
selected earth brought from out
side borrow area or from
3 excavated useful material incl. 22165.00 Cum 141.00
watering ramming, Compaction
with pneumatic temping and all
lead and lift etc complete.
Providing and fixing HDPE film
200 micron thick Geo
membrane below concrete
Providing and fixing welded
wiremesh 1.8 mm x 65mm x
5 mm with 30 gsm galvanized 11222.00 Sqmt 84.80
coating confirming to IS 280 -
2006 as per specification
providing & laying in position
Plain/Reinforced Cement
Concrete Lining of 1:2:4 mix in
bed,side slopes and curvature
batching,mixing.transporting
placing vibrating, smooth
finishing,membrance curing (by
curing compund only) and
providing bitumen joints at
6 specified interval including 18831.00 Sqmt 372.43
minor filling /depression with
murrum / earth /soil as per
side condition to correct profile
, compaction,trimming etc to
provide lining .
(3a) for 7.50 cms thick cast-in-
citu canal lining in 1:2:4 mix of
concrete with cement level-300
kg & MSA 20 mm (without
using paver machinaries &
without sleepers)
Prov. & laying in position
"Nominal Mix" cement concrete
using cement, sand and crushed
aggregate by mass and machine
mix for C.C work incl necessary
formworks centering
scaffolding compaction by
mechanical vibrator, curing as
directed with all lead & lift etc
complete. For General
purpose.(Concrete grade
1:1.5:3 and MSA-20 mm)
Desilting of various structures
of canal and distribution system
including depositing the same
as directed with all lift and lead
for canal syphone, air vent,
Turn Out Kundies etc. complete.
Cement plaster 10 mm thick in
9 single coat to CC/RCC work and 700.00 Sqmt 151.00
brick work on fair side in
C.M.1:3 including
finishing,curing,scaffolding etc
UPTO 6.0 Mt Height
Clearing silt from canal/drain
bed by digging the same to the
required bed level and gradient
including depositing the
excavated earth regularly in
spoil bank for utilizing the same
for preparing the bund after
breaking clods as and where
directed for lead up to 30 mt
and lift as under (Excluding
(A) Depth 0 to 3.0 mt
jungle clearance of specified
category and bushes for
canal/dam work as directed
with depositing material etc
complete.(Excluding tree of
grith above 0.5 mt) A) Upto
(a) For light dense
Total Amount =1,40,97,999.83
Total Amount =1,40,97,999.83
I/We am/are willing to carry out the work at… ....................... %above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out asunder.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item (with Quantity Unit Rate Amount
No brief specification and
reference to book of In In
specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) % (in figure) ……………………………
(C)Net Tendered Amount(A-B) (in figure) …………………………
1 The Contractor shall exhibit aboard with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all P.C.C./R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per vernacular office letter no. 04 of 2024, Dt. 20/01/2024 of The Chief Engineer, Quality
Control (SSNNL) as stated in S.O.R. therefore in P.C.C./R.C.C. items where there is a change
as per Nominal mix the cost of difference of cement consumption have been deducted from
the rate of original item at the rate of input rate (i.e. 5448.53 Rs / MT for OPC) in all the
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD M and R LD 11 12 14.pdf
MO Sheet M and R LD 11 12 14.docx
DOCX
BOQ.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .