| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC | ₹12.7 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹12.9 L+₹20,671.08 (1.63%)Rejected-AOC | ₹12.9 L+₹20,671.08 (1.63%) | L2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | VINEED KUMAR CJ L1 | JAIMES MATHEW L2 |
|---|---|---|---|---|---|
| 1.00Culvert | |||||
| 1.00 | 2.5.2.B:Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (II) By Mechanical Means (B) Reinforced Cement Concrete | 4.35 | cum | 1,566.48 ₹6,809.49 Lowest | 1,766 ₹7,676.8 |
| 1.00 | 2.7.B:Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.(B) Rubble Stone Masonry in Cement Mortar | 17.55 | cum | 761.8 ₹13,369.59 Lowest | 861 ₹15,110.55 |
| 1.00 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth | 15.81 | cum | 941.83 ₹14,888.45 Lowest | 950 ₹15,017.6 |
| 1.00 | OD47066/2025-2026:Filling with Quarry Muck. Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc. quantity for 300m3 | 1.98 | cum | 911.24 ₹1,800.61 Lowest | 920 ₹1,817.92 |
| 1.00 | OD46975/2025-2026: DRY RUBBLE MASONRY _ Dry rubble without concrete leveling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labor charges etc. complete as per direction of Departmental officers at site | 2.86 | cum | 4,160.22 ₹11,898.23 Lowest | 4,260 ₹12,183.6 |
| 1.01 | OD47747/2025-2026: DR PACKING Under foundation - Dry stone packing under foundation with Dept.rubble and labour charges etc. complete as per direction of departmental officers at site | 7.02 | cum | 831.37 ₹5,836.22 Lowest | 930 ₹6,528.6 |
| 1.01 | 75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 3.98 | cum | 6,847.77 ₹27,240.43 Lowest | 6,947 ₹27,635.17 |
| 1.01 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20 | 3.95 | cum | 9,887.04 ₹39,073.58 Lowest | 9,999 ₹39,516.05 |
| 1.01 | 12.5.1.1:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m I. P.C.C grade M 15 (i) Nominal mix (1:2.5:5) | 19.76 | cum | 9,304.36 ₹1,83,854.15 Lowest | 9,450 ₹1,86,732 |
Tender Value
₹12.7 L
EMD Value
₹31,762
Closing Date
16 Aug 2025, 2:00 pmClosed
ASSISTANT ENGINEER, CHENNEERKKARA GP
O/O Assistant Engineer, LID EW, Chenneerkkara GP
LRRP 2024-25 Aranmula LAC, 967 -Manjinikkara Maniyarakkattil Palelilppadi road, Chenneerkkara GP, Pathanamthitta District
2025_LSGD_783365_1
02/AE/LIDEW/CHKA/2025-26/T1E
Open Tender
Civil Works - Roads
Item Rate
CHENNEERKKARA GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹31,762
23 Oct 2025
7 Aug 2025
19 Aug 2025
7 Aug 2025
16 Aug 2025
7 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .