| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.7 LAccepted-AOC | ₹12.7 L | 1 | Accepted-AOC ACCEPTED |
| 2 | 2₹15.2 LRejected-Finance | ₹15.2 L | 2 | Rejected-Finance 2 |
| Sl No | Description | Qty | Unit | NT Joseph L2 | ST ANTONY AGENCES KAROOR L1 |
|---|---|---|---|---|---|
| 1.00Anganawady construction | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 29.9 | cum | 359.72 ₹10,754.91 | 359.72 ₹10,754.91 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5.31 | cum | 7,932.89 ₹42,107.78 | 7,932.89 ₹42,107.78 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 40.5 | sqm | 386.16 ₹15,639.48 | 386.16 ₹15,639.48 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.76 | cum | 10,488.77 ₹91,839.67 | 10,488.77 ₹91,839.67 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 42.84 | sqm | 762.88 ₹32,685.59 | 762.88 ₹32,685.59 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 39.9 | sqm | 1,008.55 ₹40,241.15 | 1,008.55 ₹40,241.15 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.42 | cum | 12,772.18 ₹43,680.86 | 12,772.18 ₹43,680.86 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 81.06 | sqm | 961.24 ₹77,918.11 | 961.24 ₹77,918.11 |
| 1.01 | OD275361/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 11.62 | cum | 1,723.32 ₹20,019.81 | 1,723.32 ₹20,019.81 |
Tender Value
₹12.7 L
EMD Value
₹31,772
Closing Date
26 Feb 2026, 5:00 pmClosed
LAISHA ASOKAN
The Assistant Engineer, LSGD, Chalakudy Municipality
Annual Plan-P No 450/25-26 Anganawady construction-ward 1-General Civil Work-Chalakudy Municipality
2026_LSGD_836458_3
09/2025-26/AEE/LSGD/CKDY
Open Tender
Civil Works - Buildings
Chalakudy Municipality
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹31,772
Yes
5 Jul 2026
16 Feb 2026
27 Feb 2026
16 Feb 2026
26 Feb 2026
16 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Anganawady construction | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.003 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.004 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
| 1.006 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 1 | sqm | - | - |
| 1.007 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.008 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.009 | OD275361/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1408247.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.06 MB
Tendernotice_3.pdf
PDF • 0.06 MB
prilims.pdf
Tender Documents • 0.26 MB
notice.pdf
Tender Documents • 0.03 MB
viewsbd1.pdf
Tender Documents • 2.79 MB
fot.pdf
Tender Documents • 0.26 MB
afidavit.pdf
Tender Documents • 0.24 MB
BOQ_1408247.xls
BOQ • 0.33 MB
CORRI.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid