Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹75.4 LAccepted-AOC | ₹75.4 L | l1 | Accepted-AOC accept |
| 2 | L2₹80.2 LRejected-AOC LID AND EW SECTION PALLIKKATHODU GRAMA PANCHAYATH | KOTTAYAM | KERALA | 686102 | ₹80.2 L | L2 | Rejected-AOC reject |
| Sl No | Description | Qty | Unit | Shajimon Joseph L2 | IRSHAD C.A L1 |
|---|---|---|---|---|---|
| 1.00BUILDING PROPER | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 266.22 | cum | 294.84 ₹78,491.42 | 277.14 ₹73,779.38 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 98.4 | cum | 105.62 ₹10,393.01 | 99.28 ₹9,769.15 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 32.03 | cum | 6,765.71 ₹2.2 L | 6,359.74 ₹2.0 L |
| 1.00 | OD212419/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. All work upto plinth level | 65.52 | cum | 9,345.62 ₹6.1 L | 8,784.84 ₹5.8 L |
| 1.00 | OD212420/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Min Cement content considered in this item is @ 330 kg/ cum.
All work above plinth level upto floor V level | 13.56 | cum | 10,657.48 ₹1.4 L | 10,017.99 ₹1.4 L |
| 1.01 | OD212421/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. All work above plinth level upto floor V level | 66 | cum | 10,895.81 ₹7.2 L | 10,326.62 ₹6.8 L |
| 1.01 | 4.2.8:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 4.11 | cum | 8,499.5 ₹34,932.95 | 7,989.5 ₹32,836.85 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 403.04 | cum | 256.7 ₹1.0 L | 241.29 ₹97,249.28 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 10,230.4 | kilogram | 97.6 ₹10.0 L | 91.7 ₹9.4 L |
Tender Value
₹81.3 L
EMD Value
₹50,000
Closing Date
21 May 2025, 11:00 amClosed
Executive Engineer
Executive Engineer, PWD, Buildings division. Kottayam-1
GENERAL Construction of New Building for Govt. LP School Onamthuruthu 2023 2024 Construction of New Building for Onamthuruthu School General Civil Work
2025_PWD_764480_1
PWD/BLDG/TR/718/2024_5_1_1/1
Open Tender
Civil Works - Buildings
365 days
PWD Buildings kottayam
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
₹50,000
20 Feb 2026
14 May 2025
23 May 2025
14 May 2025
21 May 2025
14 May 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid