Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹636.4 CrAccepted-AOC | ₹636.4 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹693 CrRejected-Finance | ₹693 Cr | L2 | Rejected-Finance Not Lowest Bidder |
| 3 | L3₹735 CrRejected-Finance | ₹735 Cr | L3 | Rejected-Finance Not Lowest Bidder |
| 4 | L4₹739.8 CrRejected-Finance | ₹739.8 Cr | L4 | Rejected-Finance Not Lowest Bidder |
| 5 | L5₹754.2 CrRejected-Finance | ₹754.2 Cr | L5 | Rejected-Finance Not Lowest Bidder |
Tender Value
₹986.9 Cr
Closing Date
8 Jun 2021, 6:00 pmClosed
SM (EC)
AAI,RG BHAWAN, NEW DELHI
Detailed Designing, EPC of Airport infrastructure of operational area for 4E category operation of Airport i.e. Runway, Taxiway Apron, Perimeter Road etc., including associated Electrical works.
2021_AAI_71159_1
AAI/CHQ/ENGG/DHOLERA/PH-I/RWY
Open Tender
Construction Works
840 days
DHOLERA, AHMEDABAD
AS PER NIT
8 documents required · 8 mandatory
₹11,800
Exempted
6 Jul 2023
25 Feb 2021
9 Jun 2021
26 Feb 2021
8 Jun 2021
27 Mar 2021
26 Feb 2021 - 30 Mar 2021
Amount
Detailed designing, Engineering, Procurement and Construction (EPC) of “Development of New Greenfield Airport at Dholera, Ahmedabad (Gujarat). Phase-1. Sub Head: Detailed Designing, Engineering, Procurement and Construction of Airport infrastructures of operational area for 4E category operation of Airport i.e. Runway, Taxiways, Aprons, Perimeter Road etc. including associated electrical works” as set forth in Schedule - A and as specified in Schedule - B together with provision of project facilities as specified in Schedule - C and in-conformity with the specifications and standards set forth in Schedule - D, including performance and fulfillment of all other obligations of the contractor and ensuring compliances to all provisions contained elsewhere in the contract and in accordance with the provisions of this tender and matters incidental there to necessary for the performance of any and all the obligations of the contractor under this tender. Scope of work shall also cover operation for period of 7 years including DLP of 2 years and maintenance for period of 7 years including AICMC for period of 5 years after DLP. Bidder shall include cost of maintenance for 7 years (including AICMC for period of 5 years after DLP) in this quote as set forth in Schedule -N (PART - B). However, bidder shall not include cost for operation in this quote. Cost of operation like applicable minimum labour wages, PF, ESIC etc. for period of 7 years shall be reimbursed by AAI on actual basis after submission of duly verified documentary evidence as set forth in Schedule - N (PART - A). The bidder shall quote the offer excluding GST.
M.S.Khurana Engineering Limited
M/s. ASHOKA BUILDCON LTD
PATEL INFRASTRUCTURE LIMITED
Kmc Constructions Limited
PNC Infratech Ltd
HG Infra Engineering Limited
LARSEN AND TOUBRO LTD
Afcons Infrastructure Limited
CDS INFRA PROJECTS LIMITED
Dilip Buildcon Limited
Gawar Construction Limited
Dineshchandra R Agrawal Infracon Pvt. Ltd.
ITD Cementation India Limited
M/s. Gayatri Projects Limited
BSCPL
APCO Infratech Pvt Ltd.,
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid