Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.2 LAccepted-AOC | ₹19.2 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical SAFIYAS KATAMPALLY P O KOTTAKUNNU 670011 | KANNUR | KANNUR | KERALA | 670011 | - | - | Rejected-Technical L4 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L2 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | K INFRATECH L2 | BYJU V L1 | M.V. RAMESHAN L3 | C H Askar L4 |
|---|---|---|---|---|---|---|---|
| 1.00APPENDIX A (NEW CONSTRUCTION OF KITCHEN & DINING BLOCK) | |||||||
| 1.01 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area clearedClearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 300 | sqm | 8.75 ₹2,625 | 8 ₹2,400 | 9.51 ₹2,853 | 9.99 ₹2,997.86 |
| 1.02 | 2.2.1 : Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead up to 50 m and lift up to 1.5 m:All kinds of soil | 115.56 | cum | 510 ₹58,937.64 | 496 ₹57,319.74 | 565 ₹65,293.66 | 587.82 ₹67,930.40 |
| 1.03 | 2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 16.86 | cum | 62 ₹1,045.32 | 60 ₹1,011.60 | 68.33 ₹1,152.04 | 76.42 ₹1,288.38 |
| 1.04 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 11.9 | cum | 5,350 ₹63,659.65 | 5,192 ₹61,779.61 | 5,462.65 ₹65,000.07 | 6,154.44 ₹73,231.64 |
| 1.05 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 28.3 | cum | 7,500 ₹2.1 L | 7,206 ₹2.0 L | 7,774.48 ₹2.2 L | 8,582.12 ₹2.4 L |
| 1.06 | 5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 47.7 | sqm | 235 ₹11,209.50 | 225 ₹10,732.50 | 256.09 ₹12,215.49 | 270.4 ₹12,897.87 |
| 1.07 | 2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 50.23 | cum | 153 ₹7,685.50 | 146 ₹7,333.87 | 166.04 ₹8,340.52 | 176.34 ₹8,858.16 |
| 1.08 | od56902/2019_2020 : Laterate masonry with neatly dressed stone of size 35x20x20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 28.4 | cum | 4,650 ₹1.3 L | 4,416 ₹1.3 L | 4,572.63 ₹1.3 L | 5,290.35 ₹1.5 L |
| 1.09 | od56903/2019_2020 : Laterite masonry with neatly dressed stone of size 35x20x20 cm or nearest size in cement mortar 1;6 for superstructure above plinth level to floor two level including all cost of materials, labour charges etc | 25.1 | cum | 4,990 ₹1.3 L | 4,758 ₹1.2 L | 5,179.9 ₹1.3 L | 5,643.04 ₹1.4 L |
Tender Value
Refer Docs
EMD Value
₹32,728
Closing Date
15 Feb 2021, 5:00 pmClosed
EXECUTIVE ENGINEER
PWD BUILDINGS DIVISON, THALASSERY
MLA ADs 2019 2020 Sri Ramachandran Kadannapalli MLA Kannur LAC Construction of building for Kitchen Dining for Govt TTI Men Kannur
2021_PWD_407365_2
41/2020-21
Open Tender
Civil Works - Buildings
270 days
KANNUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹32,728
Yes
9 Mar 2026
8 Feb 2021
18 Feb 2021
8 Feb 2021
15 Feb 2021
8 Feb 2021
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_586609.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid