Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical 68 VAN VIHAR COLONY TONK ROAD GOPAL PURA JAIPUR RAJASTHAN 302018 | JAIPUR | RAJASTHAN | 302018 | Rejected-Technical Eligible business document satisfying clause 1.91(ix)(d) of Deptt of Expenditure, Manual for procurement of consultancy and other services 2017, not submitted. |
| 4 | Rejected-Technical B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | Rejected-Technical Experience certificate of executing similar type for work not submitted. |
| 5 | Rejected-Technical | Rejected-Technical Inadequate document uploaded. |
Tender Value
Refer Docs
EMD Value
₹12,980
Closing Date
20 Oct 2020, 6:00 pmClosed
Chief Engineer CG GOA
HQ CE CG GOA- 403 806
CONSULTANCY FOR OBTAINING GRIHA V. 2015 3 STAR RATING FOR CONSTRUCTON OF DEFICIENT MARRIED ACCN FOR COAST GUARD OFFICERS ,EPS AND CIVILIANS AT COAST GUARD AIR STATION RATNAGIRI, UNDER GE (I) (P) RATNAGIRI.
2020_MES_381922_1
30010/JO-26/2020-21/E3
Open Tender
Consultancy Services
Lump-sum
45 days
GOA
As Per NIQ
7 documents required · 7 mandatory
₹500
Yes
GE (I) (P) RATNAGIRI
₹12,980
Yes
18 Nov 2020
29 Sept 2020
22 Oct 2020
29 Sept 2020
20 Oct 2020
6 Oct 2020
Scope of Consultancy to commence from planning stage of work to attaining GRIHA-version 2015, 3 star rating (provisional and final) on completion of subject project(Plinth area as per appendix ‘A’ attached) , including following: 1. Feasibility study : It will include the following: a. Site Workshop: It includes briefing about the Green Building certification guidelines for all the stakeholders. b. Checklist: Providing tentative scores based on the Preliminary project Input. c. Report: Recommendations of measures to follow as per the rating system and also suggestion for score Improvements d. Responsibility Matrix: Consultant will create and update a project matrix that describes the specific tasks to be implemented by various members of the planning/design team and compiles documentation pertinent to Certification. Based on the Criterion Scorecard, an action Item Matrix will be used to clarify the specifications needed, calculations that must be performed and other -specific items will be updated at key intervals of the design and construction progress. 2. The preliminary Modeling : It includes the following: a. Simulations for daylight calculations- Daylight Analysis as per Certification requirement, Simulation studies for unmet hours. Shading Analysis as per Certification requirement. Daylight, glare and shading simulation studies. The impact of lighting, glare and shading on the lighting design shall be studied and evaluated by suitable models. Recommendations based on the studies/model shall be provided. b. Day Lighting Simulation- Day lights simulation shall be done to find out the light factor, useful day light luminance and predicted lux levels inside the occupied space. Towards the end the consultant shall complete the day light template to document the result of simulation.
a. Recommend the materials to be used during construction b. Provide construction matrix/Material Tracker c. Provide Declaration letter templates for Manufactures and Vendors 5. GRIHA Facilitation: a. Overall facilitation for GRIHA online registration, submitting requisite documents on GRIHA online panel, facilitation of orientation workshop to be arranged by GRIHA Council with MES planning/design/execution team. b. Consultant to arrange site visit of GRIHA Council officials (Due diligence I) to validate sustainable measures to be adopted during construction phase. It will be scheduled post the project has reach its plinth level. c. Clarify the observations of GRIHA council get & modifications made/done to Arch/structural designs of the project so as to ensure measure adopted for obtaining GRIHA-3 Star rating. d. Facilitating 2nd site visit of GRIHA council (Due diligence II) so as to validate internal finishes, electrical, plumbing and mechanical components installed during the construction phased. It is scheduled post completion of the building structure work. e. Consultant has to ensure following during the interim period of submission of online documents to finalization of tendering process of the project: f. Submission of documents: As the project will be nearing completion, consultant will upload the document for all criteria on the online panel for review by GRIHA Council. g. Preliminary evaluation by GRIHA Counsel: Consultant to be in touch with GRIHA council during the preliminary evaluation and submit document/clarifications as required by GRIHA Council.
h. Final Due diligence visit by GRIHA Council: Consultant to facilitate the GRIHA Council final site visit to verify the submitted documentation with on site implementation. This visit is done once project is completed and all equipments and systems are installed and commissioned. i. Provisional and Final valuation by GRIHA council: Consultant to ensure receipt of provisional GRIHA 3 star certification and facilitate 3rd party audit and final evaluation by GRIHA Council after 12 months of occupancy. Consultant to ensure final GRIHA 3 star rating is awarded by council on the basis of this evaluation. 6. Exclusions : a. All Fees to be payable to GRIHA b. Travel and boarding arrangements of GRIHA Council members Note : The reimbursement of the following amount will be done separately by the Deptt. (a) Griha authorities fees + taxes if any. (b) Any scope related to drawings or any other associated service. This is optional payment as against if any work comes up later stages. (c) Travel charges for Authority experts from GRIHA to site for three visit. These are charges for Griha officials to travel to site and return with living charges. (d) Main project completion period is 156 weeks wef Nov 2020
Appx 'A' DETAILS OF BUILDINGS AND PLINTH AREA Description of building Plinth area in SQM 1. Type II Qrts, S+7 – 2 Blocks (56 Qtrs.) - 1 Block of 28 Qtrs area considered. -5724.00Sqm 2. Type II Qrts, S+8 – 1 Block (32 Qtrs.) -3240.00 Sqm 3. Type III Qrts, S+7 – 1 Block (28 Qtrs.) -3164.00 Sqm 4. Type V Qrts incl servant Qtrs, S+9 – 1 Block (09 Qtrs.) -2079.00 Sqm 5. Garage for Type-V Qrts. -140.00 Sqm 6. Pump house -36.00 Sqm 7. Sub station -160.00 Sqm Total= 14543.00 Sqm 8. 25000 Ltrs RCC Terrace Tank for Fire Fighting -04 Nos 9. Underground Sump Well -275000 ltrs 10. Garbage Bins -03 Nos 11. R.C.C septic tank 300 user -02 Nos
GREEN SKETCH CONSULTANTS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .