| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L2₹1.6 CrRejected-Finance | ₹1.6 Cr | L2 | Rejected-Finance Second Lowest |
| 3 | L3₹1.6 CrRejected-Finance | ₹1.6 Cr | L3 | Rejected-Finance Third Lowest |
| 4 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Tender fee GST for Rs 994 not paid |
| Sl No | Description | Qty | Unit | AK THOUSEEF L1 | CM ASHARAF L5 | YASFA INFRASTRUCTURE PRIVATE LIMITED L3 | ABDUL KHADER B A L4 | MA ABOOBACKER AFTAB L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Road_MoRD | ||||||||
| 1.00 | 2.2.2.A:Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (II) By Mechanical Means (A) In area of non-thorny jungle | 0.53 | Hectare | 27,345 ₹14,465.51 | 31,500 ₹16,663.50 | 30,000 ₹15,870 | 31,048.43 ₹16,424.62 | 29,670 ₹15,695.43 |
| 1.00 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth | 266.28 | cum | 765 ₹2.0 L | 810 ₹2.2 L | 840 ₹2.2 L | 871.58 ₹2.3 L | 833 ₹2.2 L |
| 1.00 | 3.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 699.83 | cum | 44 ₹30,792.52 | 51 ₹35,691.33 | 48 ₹33,591.84 | 50.58 ₹35,397.40 | 49 ₹34,291.67 |
| 1.00 | 3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 7,335.62 | sqm | 13 ₹95,363.03 | 15 ₹1.1 L | 14 ₹1.0 L | 14.82 ₹1.1 L | 14 ₹1.0 L |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 1,381.3 | cum | 3,050 ₹42.1 L | 3,700 ₹51.1 L | 3,330 ₹46.0 L | 3,474.37 ₹48.0 L | 3,320 ₹45.9 L |
| 1.01 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | 35.97 | cum | 7,318 ₹2.6 L | 8,500 ₹3.1 L | 8,020 ₹2.9 L | 8,330.01 ₹3.0 L | 7,950 ₹2.9 L |
| 1.01 | 11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203III. P.C.C. grade M 20 (i) Nominal mix (1:2:4) | 126.4 | cum | 7,735 ₹9.8 L | 9,000 ₹11.4 L | 8,500 ₹10.7 L | 8,804.77 ₹11.1 L | 8,410 ₹10.6 L |
| 1.01 | 11.4.5:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203V. R.C.C. grade M 25 | 17.64 | cum | 8,447 ₹1.5 L | 9,800 ₹1.7 L | 9,250 ₹1.6 L | 9,593.83 ₹1.7 L | 9,170 ₹1.6 L |
| 1.01 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 | 2.45 | cum | 8,056 ₹19,737.20 | 9,400 ₹23,030 | 8,830 ₹21,633.50 | 9,149.53 ₹22,416.35 | 8,750 ₹21,437.50 |
Tender Value
₹1.7 Cr
EMD Value
₹50,000
Closing Date
29 Jan 2026, 6:00 pmClosed
Superintending Engineer Harbour Engg Dept,NC
Office of the Superintending Engineer,Harbour Engineering Department(HED) NORTH CIRCLE,KOZHIKODE-673303
GENERAL NAVAKERALA SADHAS Kasargod District Upgradation to Kadambar Machambadi Road in Manjeshwaram Grama Panchayath General Civil Work
2026_HED_829504_1
HED/CEHED/TR/653/2025_5_1_1/1
Open Tender
Civil Works - Roads
Manjeshwaram Grama Panchayath
Please refer Tender documents.
11 documents required · 11 mandatory
₹5,515
Yes
₹50,000
Yes
7 Mar 2026
21 Jan 2026
31 Jan 2026
21 Jan 2026
29 Jan 2026
21 Jan 2026
Road_MoRD
2.2.2.A:Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (II) By Mechanical Means (A) In area of non-thorny jungle
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
3.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6
11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203III. P.C.C. grade M 20 (i) Nominal mix (1:2:4)
11.4.5:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203V. R.C.C. grade M 25
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
BM & BC MoRTH
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.b:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom.
5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size)
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually
Road Protection and Painting Works
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
OD3231/2025-2026:Filling with Quarry Muck Filling up low lying and water logged areas with quarry muck, spreading in layers, leveling the top at site and consolidation by smooth wheeled roller, etc complete for improving the CBR value of subgrade.(as per approved OD Inter Departmental committee held on 30.03.2023)
65.7:Hydraulic excavator
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1393037.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
sbd.pdf
Tender Documents • 2.79 MB
BOQ_1393037.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid