| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹23.3 LAccepted-AOC | ₹23.3 L | L 1 | Accepted-AOC Techno-commercially qualified L1 Bidder. |
| 2 | L 2₹25.4 L+₹2.2 L (9.37%)Rejected-Finance BOOTY SADAR RANCHI 835219 | RANCHI | RANCHI | JHARKHAND | 835219 | ₹25.4 L+₹2.2 L (9.37%) | L 2 | Rejected-Finance Not lowest bid. |
| 3 | L 3₹25.6 L+₹2.3 L (10.1%)Rejected-Finance AT UPPER BOOTY NEAR KRISHNA NURSING HOME P S SADAR RANCHI JHARKHAND 835217 | RANCHI | JHARKHAND | 835217 | ₹25.6 L+₹2.3 L (10.1%) | L 3 | Rejected-Finance Not lowest bid. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Techno-commercially not qualified. |
Tender Value
₹25.5 L
EMD Value
₹51,000
Closing Date
4 May 2026, 2:00 pmClosed
GM, Transmission Zone II, Dumka
Transmission Zone II, Dumka, Maharo, Dumka
Preventive and breakdown maintenance work of 220 132 kV Switchyard and its related areas of Grid Sub-Station Madanpur (Dumka) for the period 16.05.2026 to 31.03.2027
2026_JSEB_112792_1
eNIT No 19/PR/JUSNL/2026-27
Open Tender
Repair and Maintenance Services
Works
320 days
Madanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹51,000
Yes
5 Aug 2026
13 Apr 2026
5 May 2026
13 Apr 2026
4 May 2026
13 Apr 2026
Supply of Manpower For Preventative / Routine Maintenance of Grid Substation as per schedule provided by Engineer Incharge:-
Break down/Shutdown Maintenance of Grid Sub-station :-
Erection , Connection, Testing and commissioning of following equipments with Crane/derrick at site including handling the material/equipments carefully at site including labour charges for all incidental and operational items of work ( Excluding Cost of Transportation Charges from Store to Site.)
Dismantling of following equipments with Crane/derrick at site including handling the material/equipments carefully at site including labour charges for all incidental and operational items of work ( Excluding Cost of Transportation Charges from Store to Site.)
Supply of Hydra / Crane (upto 08 MT capacity) as per requirement.
Add. Hrs.
Complete Overhauling of Cooling Fans of 150MVA ICT & 50 MVA Power Transformer with supply of all materials if required any.
Transportation of Transformer accessories / fittings, other GSS equipment, through Truck / Pickup from Transmission central Store Deoghar & Other GSS/Sites to GSS Madanpur including loading, unloading of the equipment/materials in proper packing (before loading) & (after loading) Upto 3MT
(i)Upto First 50kM
(ii)50kM<Distance<500kM (Rate per km)
Repair and Overhauling of 3 Ph Sub-Mersible pump set including cost of materials, lifting & lay down of Sub-mersible pump from Borewell, repair of water supply pipe all complete job and Transportation cost.
Testing Transformer oil by recognized laboratory including supply of sampling bottle. ( These tests are mandetory and must be completed by the end of December, 2025) :-
Testing of Transformers/ ICTs including Tan Delta of all bushing & winding, winding resistance test, trun ratio test, magnetic balance test, short and open circuit test IR & PI test etc. all test report must be prepared and submitted in standard format by reputed agency
Supply of Consumables viz. Markin cloth, Cotton waste, Joute, Distilled water, Brush, HT Nuts & Bolts, Patrollium Jelly, Grease, Kerosine, Petrol, Mobil, WD-40 rust remover,… Etc whatever required time to time for O&M work of G/S/S.
Maintenance of 250 KVA DG Set (replacement of Air & fuel filter, Gasket valve cover, engine tube oil etc.)
Air Condition Annual Maintenance charge with all spares at 220/132/33kV GSS Madanpur.
Assessment and rectification of defects in Battery chargers at 220/132 kV GSS Mdanpur.
Sub Total (A) for Sl No.1 (a+b+c)
Approximate increase in VDA during a year @ 10% on Sub Total (A)
Sub Total (B)
Sub Total ( C ) for Sl No. 2 to 15
Contractor profit on Sub-Total (B) (To be quoted by bidder in digit only upto two decimal places only) (Note-Maximum 10% and not Below than 0%)
Overhead Expenditure on Safety PPE Kit and T&Ps @ 03 % on Sub Total (B)
Employer's ESIC Contribution @ 3.25% on Sub-Total (B)
EPF Contribution of Employer@12% on Sub-Total (B)
Administrative Charges @ 0.5% on Sub-Total (B)
EDLI @ 0.5% of wages for the wages below than Rs. 15000/- and maximum to Rs. 75/- for the wages above than Rs. 15000/- per manpower per month) on Sub - Total (B)
Sub Total (D) (Sl. No.- 18+19+20+21+22+23+24+25)
CGST @ 09% on Sub Total (D)
SGST @ 09% on Sub Total (D)
Sub Total (E) (Sl. No.- 26+27+28)
Labour Cess @ 1% on Sub Total (E)
Grand Total (Sl. No.- 29+30)
Say Rs.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
MadanpurPricepartII.xls
Additional Documents • 0.07 MB
19Madanpurgridtenderdocuments.pdf
Tender Documents • 1.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .