Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-Finance | ₹15.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹15.0 LAccepted-Finance | ₹15.0 L | L2 | Accepted-Finance L2 |
| 3 | L3₹15.0 LAccepted-Finance | ₹15.0 L | L3 | Accepted-Finance L3 |
| Sl No | Description | Qty | Unit | CHAUHAN ENTERPRISES L1 | SONU ELECTRICALS L3 | MAHENDRA PAL L2 |
|---|---|---|---|---|---|---|
| 1.00Supply of Decentralized material as per UPCL Norms. | ||||||
| 1.01 | MS NUT & BOLT OFF SIZE | 46 | KG | 120 ₹5,520 | 122 ₹5,612 | 120.5 ₹5,543 |
| 1.02 | SUSPENSION CLAMP WITH
EYE HOOK ABC PCC | 115 | NOS | 350 ₹40,250 | 352.5 ₹40,537.50 | 352 ₹40,480 |
| 1.03 | LT BARE N.CONN. PG CLAMP
FOR DB 95-95mm² | 52 | NOS | 295 ₹15,340 | 294 ₹15,288 | 296 ₹15,392 |
| 1.04 | MS CLAMP PCC WITH N/B
FOR SUSP.CLAMP | 128 | NOS | 351 ₹44,928 | 352.7 ₹45,145.60 | 352 ₹45,056 |
| 1.05 | STAY INSULATOR 100X115 | 28 | NOS | 118 ₹3,304 | 119 ₹3,332 | 120 ₹3,360 |
| 1.06 | AL TO AL CONNECTOR
ABCABLE 95 TO 95 mm | 95 | NOS | 295 ₹28,025 | 296 ₹28,120 | 297 ₹28,215 |
| 1.07 | INSULATED PRC (IPC 95-95
SQ mm | 110 | NOS | 415 ₹45,650 | 416.2 ₹45,782 | 416 ₹45,760 |
| 1.08 | LT Distribution Box 3Phase
4Wire | 48 | NOS | 5,500 ₹2.6 L | 5,502 ₹2.6 L | 5,498 ₹2.6 L |
| 1.09 | Stay Clamp With N&B | 18 | NOS | 351 ₹6,318 | 354 ₹6,372 | 352 ₹6,336 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹45,000
Closing Date
2 Feb 2026, 4:00 pmClosed
Executive Engineer
Office EE EDD UPCL Sitarganj U.S.Nagar (Uttarakhand)
Suplly and Work Under EDSD I Sitarganj(Hend O and M)
2026_UPCL3_90939_1
29/2025-26 EDD (S) Sitarganj
Open Tender
Electrical Works
90 days
Under EDD UPCL Sitarganj
As Per Tender Document
3 documents required · 3 mandatory
₹1,180
Yes
EE EDD Sitarganj
₹45,000
Yes
1 Apr 2026
13 Jan 2026
3 Feb 2026
13 Jan 2026
2 Feb 2026
13 Jan 2026
Supply of Decentralized material as per UPCL Norms.
MS NUT & BOLT OFF SIZE
SUSPENSION CLAMP WITH EYE HOOK ABC PCC
LT BARE N.CONN. PG CLAMP FOR DB 95-95mm²
MS CLAMP PCC WITH N/B FOR SUSP.CLAMP
STAY INSULATOR 100X115
AL TO AL CONNECTOR ABCABLE 95 TO 95 mm
INSULATED PRC (IPC 95-95 SQ mm
LT Distribution Box 3Phase 4Wire
Stay Clamp With N&B
AL. CRIMPING TYPE LUGS 120 SQ.mm
Al. Lug Long Barrel 95 sq. mm.
Aluminium lug 25 sq. mm
MS Half Clamp for LT Distribution Box
DEAD END CLAMP WITH NUT & BOLTS
Following work as per UPCL norms & site requirement.
EXCAVATION OF PIT FOR STAY SET
ERECTION OF LT STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE PCC POLE
DISMANTLING OF LT LINE 1 P 2 W(WEASEL)
DISMANTLING OF LT LINE 3 P 4 W(WEASEL)
LOPPING & CHOPPINGOF TREE BRANCHES
CARTAGE PCC POLE, 21-50 KM
CARTAGE OF PETTY MATERIAL,21-50 KM
FIXING OF PG CLAMP 95-50 SQMM
INSTALLATION OF LT DIST BOX (1P & 3P)
LAYING OF LT XLPE ABC 3X95 +1X70 SQ.MM
DISCONN & RECONN. OF SERVICE CONN. 1PH.
DISCONN & RECONN. OF SERVICE CONN. 3PH.
SUPPLY & FIXING IPC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
29202526.pdf
Tender Documents • 1.45 MB
formaandb.pdf
Other Document • 0.67 MB
BOQ_107746.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid