Loading…
Loading…
Tender Value
₹9.5 L
EMD Value
₹9,500
Closing Date
18 Jul 2026, 3:30 pmClosed
EE OFFICE- TENALI
Tenali
Annual Maintenance of State Highways in (R&B) Section, Addanki for the year 2026-27 ( SH Package No 11)
957348
EE/R&B/BPT/21/2026-27 dated 30.06.2026
OPEN - NCB
Annual maintenance works
BAPATLA
9 documents required · 5 mandatory · 4 optional
₹336
₹9,500
11 Jul 2026
4 Jul 2026
4 Jul 2026
Providing B T patch work to the specified thickness as directed by the department using 40 mm size I R C gauge HBG metal and 0.13 cum of 9.50 mm to 11.20 mm HBG M/ c chips using a total quantity of 42 kgs of Bitumen 80/100 grade Bitumen per i cum of metal cutting the existing pot holes to rectangular shape with verticle sides or as directed by the department, removing loose aggregates, brushing cleaning dusting the existing road surface, heating and spraying bitumen for tack coat as directed by the department, pre mixing bitumen and metal, spreading the pre mix in flush with the riding surface, hand packing sectioning to proper camber, rolling with Power Road Roller, laying bitumen to the top surface as direced by the department etc, complte including cost and conveyance of metal, Bitumen and all labour charges, hire and operational charges of boiler and other small T & P cost of fire wood, Kerosine and other incidental charges etc,. complete for B T patch work.
Addanki - Koniki road from km.0/0 to 23/0
Inkollu - Muppavaram road from km .11/695 to 19/640
Providing BT patch work to the specified thickness as directed by the department using 9.5 mm to 11.2 mm size IRC gauge HBG M/C key chips using 72 kgs of 80/100 grade bitumen for 1 cum of chips and .15 cum of stone dust cutting the existing pot holes to rectangular shape with vertical sides or as directed by the department, removal loose aggregate, brushing cleaning and dusting the existing road surface, heating and spraying bitumen for tack coat as directed by the department, pre-mixing bitumen and metal, spreading the premix in flush with the riding surface, hand packing sectioning to proper camber, tamping with heavy rammers, laying bitumen to the top surface as directed by the department etc. complete including cost and conveyance of metal, Bitumen and all labour charges, hire and operational charges of boiler and other small T&P cost of firewood, kerosine and other incidental charges etc., complete for B.T.patch work.
Addanki - Koniki road from km.0/0 to 23/0
Inkollu - Muppavaram road from km .11/695 to 19/640
Clearing juliflora (Prostis) jungle including uprooting and removing of juliflora stumps including all labour charges etc,. Complete as directed by the departmental officers.
Addanki - Koniki road from km.0/0 to 23/0
Inkollu - Muppavaram road from km .11/695 to 19/640
Stripping of excess soil (Sectioning of Berms) from the shoiulders surface to achive the approved level and compating all labour charges etc,. Complete as per MORTH specification 3003.
Addanki - Koniki road from km.0/0 to 23/0
Inkollu - Muppavaram road from km .11/695 to 19/640
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
BOQ kollur.xls
TENDER_DOCUMENT • 0.05 MB
DTS KP Road.doc
TENDER_DOCUMENT • 1.07 MB
Schedule SH Pack-11.xls
TENDER_DOCUMENT • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .