Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.3 L
EMD Value
₹1,300
Closing Date
15 Oct 2026, 6:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, P. H.W. Division, Radhanpur
Bid documents for, The work of Dismantling, Demolition of Office Building & Rest House AT Shihori Sub Division Under M & R to Office Building 2025-26.Taluka :- Kankrej, District :- Banaskantha.
350626
03 of 2026-27
Open
Civil Works - Water Works
Works
Patan
6 documents required · 6 mandatory
₹600
Executive Engineer, P. H. Works Division, GWSSB, Radhanpur
₹1,300
30 Sept 2026
30 Sept 2026
30 Sept 2026
15 Oct 2026
30 Sept 2026
Estimated Cost : Rs.
Gujarat Water Supply & Sewerage Board
Zone-2,AHMEDABAD
Volume-III, PRICE BID BK-3 P2_M&R-23-24_Reparing of PH
Bid Documents for Design, Build & Operate Contract for
Volume-III, PRICE BID BK-3 P2_M&R-23-24_Reparing of PH
Name of Work:- Bid documents for, The work of Dismantling, Demolition of Office
Building & Rest House AT Shihori Sub Division Under Kankrej-Deodar Group
RWSS M & R 2026-27. Taluka :- Kankrej, District :- Banaskantha.
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
(1) The rates and prices shall be submitted in the electronic formats given by n-
procure which is called Schedule-B. Rates and prices received in any other
formats will be rejected and the Bids will be disqualified.
(2) It will be entirely at the discretion of the Employer to accept or reject the
bidder’s proposal, without giving any reasons whatsoever and the bidder shall
not be permitted to withdraw his bid on this account.
be free supplied from the by client.
(4) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit
rate as called for against the BOQ item.
in Schedule-B only will be considered for price evaluation & shall form a part of
the Contract Agreement.
and evaluation.
(7) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C.
Bidder shall give year wise break up of cost for 5 years O&M in Schedule-C/1 to
Schedule-C/5 separately for Schedule-C. The total shall be in line to the price
quoted in Schedule-C. The total shall be carried forward to Schedule-B for
comparison and evaluation.
(8) Wherever for a particular item the quantities have been specified payment
shall be on unit rate basis and unit variation in quantity will be paid with pro
(9) Each item is to be individually priced online and the amounts shall be added up
prices shall be left blank except where the item description requires the item
to be priced on "as applicable” basis. The item shall not be priced if it is “not
applicable” to the bidder’s design, in which case the bidder shall add the
words “NOT APPLICABLE”. The wording in the item description is for subject
matter guidance only; clause references are indicative only and all other
relevant clauses shall also be referred to. The prices shall allow for all the
works covered under the bid and all liabilities and contractual obligations
whether separately specified or not. Items against which no prices are quoted
shall not be separately paid for and the bidder shall be deemed to have
covered the cost of execution of such items (according to the requirements of
the bid document) in the prices quoted for other items.
Volume-III, PRICE BID BK-3 P2_M&R-23-24_Reparing of PH
for satisfactory working/safety of the system as specified, will not be
separately paid for by the Employer when executed and shall be deemed to be
already covered by other items and rates listed in the price sheets No extra
payment shall be given for any item which is required to complete and perform
fixed, during the pendency of the Contract. In case of any discrepancy noted in
carried over and arithmetic corrections if any will be considered for financial
evaluation of the bid.
(12) Schedule ‘D gives the basis of interim payment for construction of works.
(13) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature
required for construction including temporary bunds, diverting water,
pumping, de-watering etc. for the proper execution of works. The rates shall
also be deemed to include any works and setting out that may be required to
be carried out for laying out of all the works involved.
(14) Prices shall be filled online only.
Contract, the Specifications and other sections of these bid documents and
these documents are to be taken as mutually explanatory of one another.
(16) The bidder shall interpret the data furnished and carry out any additional
survey work, or investigation work required at his own cost.
(17) The prices quoted shall also include the cost of materials utilized for testing.
(18) The bidder should acquaint himself with the site conditions including the
access to Work site. The successful bidder shall have to make suitable access
to work sites at his own cost. These accesses will be used by the other
contractors working for GWSSB.
and the prices shall include all the equipments / materials / accessories and
services required as per the specifications. The bidder shall fill in the price
schedule furnished.
(20) The amount to be quoted for O & M / year shall be as per Volume-IB, General
Conditions of Contract, Clause No. 1, Security Deposit.
(21) 1% of the value of work will be deducted from the Running bill against labour
cess which is non refundable.
(22) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of
the same will be borne by GWSSB.
(23) Any expenditure incurred by inspection/ CSC agency for the work misinformed
by the contractor and charges of inspection/ CSC agency without any work due
to misinformation shall be recovered from the contractor.
(24) The rates to be quoted by the Contractor must be exclusive of GST but inclusive of
all other taxes. GST should be paid extra on the admissible payment as per the
approved tender rates and condition of price variation; GST should be paid as per
prevailing rates at the time of payment. The TDS as per provision of IT rules and
Volume-III, PRICE BID BK-3 P2_M&R-23-24_Reparing of PH
(25) The rates should be quoted by the Contractor must be exclusive of GST but
inclusive of all other taxes as per Volume-I (B) General Condition of Contract,
(26) The rates quoted shall be exclusive of GST, but inclusive of all other taxes and
cess or levies or duties which shall not be paid extra. Which GST will be paid
for admissible part of actual work done at the approved tender rates and
tender condition of price variation. GST shall be paid as per prevailing rates at
the time of payment. The TDS shall be deducted at source as per provision of
IT rules and GWSSB policy.
(27) The rates should be quoted exclusive of GST but inclusive of all other taxes as
per Volume-I(B), General Condition of Contract, Clause No.47.
(28) The process requires that the bidder shall quote his price for the work
shall remain firm and fix during the entire period of performance of the
contract except price variation allowed for supply of MS pipe as per Volume-IB
Clause No. 59, General Conditions of Contract.
(29) Payment shall be made for the components for which lump sump prices are
quoted, as per the schedule of payment. Total cost will be worked out on the
basis of work done of individual items and rates quoted against those particular
(30) Royalties: The contractor shall be liable to pay the royalty of the quarried
materials/ minerals used in the construction of works at the rates specified in
the Narmada Water Resources, Water Supply & Kalpsar Dept. Resolution No.
GEN-2010-595- (6)- M.I. Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy
enclosed) and shall be recovered from the running bills of the work from time
to time and remaining amount if any shall be recovered from the final bill
before releasing the security deposit of the work. The contractor shall furnish
the statement showing the quantity of quarried materials / minerals from
whom purchased ( with full address of the seller) and copies of the bills for
purchase to the Executive Engineer of the in charge of the work. The
contractor shall also furnish such additional information as regards royalty
payment to the competent authority.
(31) Agency shall have to take Insurance policy and intimate to GWSSB along with
the evidence within time limit. In case of non compliance entire responsibility
shall be rest with the agency and required amount shall be recovered from any
due amount of the agency.
(32) GWSSB can recover penalty amount from the agency for not taking the
insurance. Though the penalty amount is recovered, responsibility of the
agency for taking insurance shall be continued and will not be escaped from
the responsibility.
(33) Payment should be made after fund released by GWSSB.
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
Volume-III, PRICE BID BK-3 P2_M&R-23-24_Reparing of PH
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB: Name of Work:- Bid documents for, The work of Dismantling, Demolition of
Office Building & Rest House AT Shihori Sub Division Under Kankrej-Deodar
Group RWSS M & R 2026-27. Taluka :- Kankrej, District :- Banaskantha.
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of
the above Contract, we the undersigned offer to design, Engineer, procure,
construct, complete, commission, operate and maintain the whole of the said works
for 5 years from the date of commissioning including defects liability period as given
in Conditions of Contract and in conformity with the drawings, conditions of
Documents, including Addenda Nos.__________ (insert numbers) for Lump sum fixed
price of Rs._________________.
Rupees_____________________________________________) for Construction
including free trial run for three months or such other sum as may be ascertained in
accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any
other person/Agency by the Employer to perform on his behalf for carrying out the
inspection and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved
by the Engineer’s representative.
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take any
action including termination of Contract and impose at his absolute discretion any
penalties, and/or reject the work.
Volume-III, PRICE BID BK-3 P2_M&R-23-24_Reparing of PH
3. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within _________ months, inclusive of monsoons,
from the date or receipt of Letter of Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 90 days from the Last date of
submission of the bill and it shall remain binding upon us and may be accepted at
any time before the expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but
until such agreement is prepared this Bid together with your written acceptance
thereof shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and
of value specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages likely
to be suffered by you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Volume-III, PRICE BID BK-3 P2_M&R-23-24_Reparing of PH
Name of Work Bid documents for, The work of Dismantling, Demolition of Office
Building & Rest House AT Shihori Sub Division Under Kankrej-Deodar Group
RWSS M & R 2026-27. Taluka :- Kankrej, District :- Banaskantha.
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
Schedule showing the approximately the materials to be supplied to the contractor
from government stores for the work to be executed and the rate at which they are to
Rate at which the
Sr. material will be charged Place of
Particular Qty.
No. to the contractor Delivery
1. The contractor submitting the Tender shall see that the rate in Schedule-A are filled
in by the Engineer in Charge at the time of issue tender.
2. The contractor while submitting the tender shall provide his own arrangement at his
own cost for loading, unloading, and transporting safety to the site of work the
cement stipulated in Schedule-A
3. Binding wire of 15 gauge of thinner gauge required for placing the reinforcement in
position shall be provided at his own cost.
4. All the materials required for the items other than labour in Schedule-A but
available with the dept. will be issued on request to the contractor. (for use in this
contract only) at prevailing market rates or departmental issue rates whichever is
5. All the surplus materials supplied by the deptt. As mentioned in schedule-A should
be handed over to the Department by the contractor at the Govt. stores as directed.
6. The materials mentioned in schedule-A shall have to be checked for their
correctness and soundness by the contractor before taking the delivery of the
materials from the Government.
7. Necessary cement will be purchased by the agency at their own cost from open
8. The persons of firm submitting the Tender should see that rates in the above
schedule are filled up by the Executive Engineer, on the issue of form prior to the
submission of the Tender.
9. Carting of above materials should be done by contractor at his own cost.
10. Contractor should return the balance materials in good and acceptable condition,
otherwise recovery at the double rates will be affected in view of Clause 12.4.
11. Royalties: The contractor shall be liable to pay the royalty of the quarried materials/
minerals used in the construction of works at the rates specified in the Narmada Water
Resources, Water Supply & Kalpsar Dept. Resolution No. GEN-2010-595- (6)-
Volume-III, PRICE BID BK-3 P2_M&R-23-24_Reparing of PH
M.I.Cell ( K-1) Dt. 29-4-2011 and shall be recovered from the running bills of the work
from time to time and remaining amount if any shall be recovered from the final bill
before releasing the security deposit of the work.The contractor shall furnish the
statement showing the quantity of quarried materials / minerals from whom purchased
( with full address of the seller) and copies of the bills for purchase to the Executive
Engineer of the in charge of the work. The contractor shall also furnished such
additional information as regards royalty payment to the competent authority
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
Volume-III, PRICE BID BK-3 P2_M&R-23-24_Reparing of PH
Name of Work Bid documents for, The work of Dismantling, Demolition of Office
Building & Rest House AT Shihori Sub Division Under Kankrej-Deodar Group
RWSS M & R 2026-27. Taluka :- Kankrej, District :- Banaskantha.
Schedule - 'B' (SCHEDULE OF PRICES)
Qty Unit Description of item Rate Per Amount
Demolition of Brick work and stone masonry
including stacking of serviceable materilas and
432.19 Cum disposal of unserviceable materials with all lead 562.89 Cum
and lift.(ii) In Cement Mortar.
Demolition including stacking of serviceable
40.13 Cum materilas and disposal of unserviceable materials 1082.35 Cum
with all lead and lift. (i) R.C.C. work
Cutting, extracting and disposing off structural
5280.16 Kg a) Steel content -30.00 Kg -158404.80
assuming it to be ~ 0.6% of concrete volume and
having ~ 25% deterioration
I / we am / are willing to carry out the work at ________________% above/below (Percentage should be written in
words also) above / below the tendered rate mentioned and above amount of my/our tender comes as under :-
Estimented amount put to; Estimented amount put to;
Signature Deputy Executive Engineer Executive Engineer
of P.H.W.S.S.D. P.H.Works Division
Contractor Shihori Radhanpur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Deposit Release Circular.pdf
gst latest.pdf
Performance bond-SECURITY DEPOSIT TIME LIMIT EXTENSION LETTER .pdf
Annexture 5 Insurance.pdf
Badhakam Shramyogi.PDF
Labour Fee Circular.jpg
JPG
Price Variation Paripatra 2023 (1).pdf
Annexure 3 - EMD G.R..pdf
Annexure 4 to 5.pdf
Annexure -6 GUJARAT RAJYA KHARID NITI 2016.pdf
Vol 1 A Tech Bid.pdf
Vol 1 B GCC.pdf
Price Bid.pdf
Special Note.pdf
Tech. Specification.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .