Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹18.0 L+₹10,584.48 (0.59%)Accepted-Finance AT BAHARANA PO BAULANGA PS GOP DIST PURI | PURI | ODISHA | 752001 | ₹18.0 L+₹10,584.48 (0.59%) | L2 | Accepted-Finance Not Selected |
| 2 | L3₹18.6 L+₹76,208.24 (4.26%)Accepted-Finance AT PO BIRATUNGA PS GOP DIST PURI | BIRATUNGA | PURI | ODISHA | ₹18.6 L+₹76,208.24 (4.26%) | L3 | Accepted-Finance Not Selected |
| 3 | L4₹21.2 L+₹3.3 L (18.3%)Accepted-Finance | ₹21.2 L+₹3.3 L (18.3%) | L4 | Accepted-Finance Not Selected |
| 4 | L4₹21.2 L+₹3.3 L (18.3%)Accepted-Finance | ₹21.2 L+₹3.3 L (18.3%) | L4 | Accepted-Finance Not Selected |
| 5 | L4₹21.2 L+₹3.3 L (18.3%)Accepted-Finance | ₹21.2 L+₹3.3 L (18.3%) | L4 | Accepted-Finance Not Selected |
Tender Value
₹21.2 L
EMD Value
₹21,160
Closing Date
5 Mar 2026, 5:00 pmClosed
SUPERINTENDING ENGINEER, R.W DIVISION, NIM
O/O THE SUPERINTENDING ENGINEER, R.W DIVISION, NIM
Building
2026_CERWI_126559_2
Tender Online Divn.NPR-18/2025-26
Open Tender
Civil Works - Buildings
Percentage
180 days
Nimapara
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹21,160
Yes
19 Sept 2026
24 Feb 2026
6 Mar 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
24 Feb 2026 - 5 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in hard soil including dressing and levelling the bed up to the required depth & removing the excavated earth & depositing the same away from the work site within initial lead of 50 mtr & initial lift of 1.5 mtr, including cost of labour T&P articles required for the work including shoring, shuttering, propping & dewatering if required, etc. complete in all respect as per the specification & direction of the Engineer-in-Charge. | 87.51 | Cum | 276.89 | ₹24,230.64 |
| 2 | Supplying and filling in foundation trenches and plinth with sand, well watered and rammed in layers not exceeding 15cm in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge. | 103.06 | Cum | 1,036.87 | ₹1,06,859.82 |
| 3 | Providing Plain cement concrete (1:3:6) using 40mm. Size black hard hand broken granite stone chips of approved quality from approved quarry using ordinary Portland cement (OPC), screened and washed sharp sand for mortar including lowering, laying and compacting concrete in layers not exceeding 15cm.thick, watering and curing, including cost, conveyance, royalty and taxes of all materials, all labour sundries and T&P required for the work, including shoring, shuttering, dewatering if required including hire and running charges of all machineries etc. complete as directed by the Engineer-in-charge. | 24.14 | Cum | 6,738.17 | ₹1,62,659.42 |
| 4 | Laterite stone masonry in cement mortar (1:6) in superstructure per cum including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. | 28.85 | Cum | 6,626.17 | ₹1,91,165 |
| 5 | Fly Ash Brick Work in C.M (1:6) using Fly Ash Bricks of approved quality in superstructure including providing key bricks, splays cutting, circular moulding, champering, chiselling including watering, curing with cost , conveyance , royalty taxes of all materials, labour and T&P articles required for the work etc. complete in all respect as per direction of the Engineer in charge . | 39.51 | Cum | 6,285.18 | ₹2,48,327.46 |
| 6 | R.C.C.Work of M-20 nominal mix (1:1/2:3) using 20mm & 10mm H.G stone aggregate with approved quality from approved quarry for cement concrete including centring & shuttering work cost of all materials, labour T&P required for the work with royality etc. Complete in all respect as per direction of the Engineer in charge. (Foundation) | 4.81 | Cum | 7,549.61 | ₹36,313.62 |
| 6.01 | Plinth Band | 2.87 | Cum | 7,549.61 | ₹21,667.38 |
| 6.02 | Column | 5.51 | Cum | 16,184.41 | ₹89,176.1 |
| 6.03 | Lintel | 1.8 | Cum | 14,584.85 | ₹26,252.73 |
| 6.04 | Chajja | 1.11 | Sqm | 1,263.95 | ₹1,402.98 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.92 MB
DTCN.pdf
Tender Documents • 1.71 MB
BOQ_582729.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .