Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-Finance | ₹8.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹8.2 L+₹20,615.28 (2.56%)Rejected-Finance | ₹8.2 L+₹20,615.28 (2.56%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.6 L+₹56,073.56 (6.97%)Rejected-Finance | ₹8.6 L+₹56,073.56 (6.97%) | L3 | Rejected-Finance L3 |
| 4 | L4₹10.3 L+₹2.3 L (28.2%)Rejected-Finance | ₹10.3 L+₹2.3 L (28.2%) | L4 | Rejected-Finance L4 |
Tender Value
₹10.3 L
EMD Value
₹20,615
Closing Date
18 Aug 2026, 3:00 pmClosed
Executive Engineer,KID
Office of the Executive Engineer Kakdwip Irrigation Division Postal address Kakdwip, South 24 Parganas, Pin-743347
Emergent restoration to Sundarban Embankment damaged due to full moon kotal from 30.07.2026 to 03.08.2026 for a length of 220.00 m from Ch.0.950 KM to Ch. 1.050 KM Ch.2.100 KM to Ch.2.220 KM facing the left bank of river Hooghly
2026_IWD_1038059_10
WBIW/EE/KIDIVISION/e-SNIT- 09 (e)/2026-27
Open Tender
CIVIL WORKS
Percentage
14 days
Kakdwip
Please refer Tender documents.
6 documents required · 6 mandatory
₹20,615
Yes
3 Sept 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
(ii) 15 cm av. Diameter
Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end. | - | Metre | 258.62 | - |
| 2 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads efore and after driving and including hire and labour for necessary driving appliances and all tackles.
(i) 15 cm av. diameter
Note:- Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end. | - | Metre | 125.14 | - |
| 3 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.
(a) Width of thinner end above 10 cm. and less than 15 cm.
(i) Jhaw / Eucalyptus. | - | Metre | 123.95 | - |
| 4 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. To be measured at mid length). | - | Metre | 34.56 | - |
| 5 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.
(a) Where boats are not necessary. | - | Metre | 13.11 | - |
| 6 | Supplying to site empty cement polythene bags (capacity50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | - | Each | 7.15 | - |
| 7 | Labour charges for filling empty cement gunny bag / polythene bag (capacity50kg) with all kinds of earth (wetordry), sand or agreegates (stone/brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking with in a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). | - | Each | 8.34 | - |
| 8 | Dumping in position earth /sand filled gunny / poly bags (capacity50kg) within a lead of 30 metre inclusive of all lifts. | - | Each | 3.58 | - |
| 9 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, channels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of A) Beyond 3.00 Km and upto 4.00 Km NB: Measurement to be taken on the basis of stack measurement / pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Note 1: Extra rate towards compensation for earth for land owned / arranged by the contractor over rate of earthwork for land owned / arranged by the Department has been added in this derivation @ ₹43.00/m³ [Vide Ref: Page No: 87, Item No: 16(Note) of NH Schedule of Rates 2019]
Note 2: The rate of royalty for earth/soil/fine sand/silt used for filling/brick making ( including such materials derived from dredging/de-silting) as notified same as that of Ordinary Earth/Brick Earth/fuller Earth vide Gazette notification No. 581-ICE-12013(99)/6/2022-MINES SEC-Dept. of ICE, Date:- 26.09.2022 of Department of Industry, Commerce & Enterprises Mines Branch @ ₹29.00/m³ has been added in this derivation. The royalty will be paid to the agency on production of necessary documents in support of paymentmade towards the royalty.
Note 3: Extra rate towards cess for earth for land owned / arranged by the contractor over rate of earthwork for land owned / arranged by the Department has been added in this derivation @ ₹5.30/m³ [Vide Ref: Memo No: 138/3512-29/C/99 Dated; 22.06.2000 of DLR & Jt. LRC, WB] | - | Cum | 382.92 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
Tendernotice_2.pdf
PDF • 1.03 MB
BOQ_2550087.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .