Loading…
Loading…
Tender Value
₹7.8 L
EMD Value
₹19,500
Closing Date
10 Jun 2026, 5:00 pm4d left
Divisional Forest Officer, Palakkad
Kallekulangara Palakkad
Road Chappath Work-in Teak Plantation TP-2017 -Reach-1- at Elival Section Under Olavakkode Range During Year 2026-2027
2026_FD_853722_1
D-804/2026
Open Tender
Civil Works - Roads
90 days
Elival section
Road Chappath Work-in Teak Plantation TP-2017 -Reach-1- at Elival Section Under Olavakkode Range During Year 2026-2027
8 documents required · 8 mandatory
₹1,600
Yes
₹19,500
Yes
3 Jun 2026
3 Jun 2026
12 Jun 2026
3 Jun 2026
10 Jun 2026
3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Road Chappath Work-in Teak Plantation TP-2017 (Reach-1) at Elival Section Under Olavakkode Range During Year 2026-2027 | ||||||
| 1.01 | 2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and
saplings of girth up to 30 cm measured at a height of 1 m above ground level and
removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - | BI01010001010000000000000515BI0100001114 |
| 1.02 | 2.33.1
Felling trees of the girth (measured at a height of 1 m above ground level) including
cutting of trunks and branches, removing the roots and stacking of serviceable
material and disposal of unserviceable material.Beyound 30 cm girth up to and
including 60 cm girth | - | each | 1 | - | BI01010001010000000000000515BI0100001115 |
| 1.03 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5
m, as directed by Engineer-in-charge.All kinds of soil | - | cum | 1 | - | BI01010001010000000000000515BI0100001116 |
| 1.04 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means
in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift up to 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.All kinds of soi | - | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 1.05 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4
coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm
nominal size derived from natural sources) | - | Cum | - | - | BI01010001010000000000000515BI0100001118 |
| 1.06 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form
for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - | BI01010001010000000000000515BI0100001119 |
| 1.07 | 5.2.2
Reinforced cement concrete work in walls (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. up tot floor five level excluding cost of centering,
shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded
stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - | BI01010001010000000000000515BI0100001120 |
| 1.08 | 5.22.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete upto plinth levelThermo - Mechanically Treated
bars of grade Fe-500D or more | 0.2 | Kg | - | - | BI01010001010000000000000515BI0100001121 |
| 1.09 | 51.2.3
Filling with Quarry Muck <br> Filling up low lying and water logged areas
with local material/ quarry muck, spreading in layers, leveling the top at site and
consolidation by ramming, etc complete for improving the CBR value of subgrade | - | cum | - | - | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
priliminaryagreement.pdf
Tender Documents • 0.24 MB
ePayment.pdf
Other Document • 0.01 MB
BOQ_1442817.xls
BOQ • 0.28 MB
SCHEDULE.pdf
Tender Documents • 0.80 MB
Download all tender documents and submit your bid