| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st rank₹2.5 LAccepted-AOC | 1st rank | Accepted-AOC 1st | |
| 2 | 2nd rank₹2.9 L+₹37,082.31 (14.8%)Rejected-AOC PARAVAN VILA VEEDU MELAMMAKAM MARIYAPURAM | 2nd rank | Rejected-AOC 2nd |
Tender Value
₹3.0 L
EMD Value
₹7,416
Closing Date
21 Mar 2025, 3:00 pmClosed
Assistant Executive Engineer
O/o the Assistant Executive Engineer, Channel Sub Division, Neyyattinkara
Canal bund road
2025_Irrig_752032_1
IRR/IA/TR/1825/2023_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
vellayani
Please refer Tender documents.
11 documents required · 11 mandatory
₹655
Yes
₹7,416
Yes
5 May 2025
18 Mar 2025
22 Mar 2025
18 Mar 2025
21 Mar 2025
18 Mar 2025
Amount
Protection of Canal bund
15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
AJEESH KUMAR AR (BID ID -2166823)
Bidder Name
R SELVARAJ
AJEESH KUMAR AR
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1219375.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .