Tender Value
₹25.2 L
EMD Value
₹30,000
Closing Date
15 Jun 2026, 6:00 pm5d left
Executive Engineer, Panchayat (R&B) Division, Valsad
CR- FDIR-2026-27 Metalling & Asphalt Patch Work on Karajgam Agripada Ambamata Temple to Joining Primary School Road sec 1/4 to 2/0 Ta Umargam Dist Valsad (Re-invite)
312409
06 of 2026-27
Open
Civil Works - Roads
Valsad
4 documents required · 4 mandatory
₹1,500
Executive Engineer, Panchayat (R and B) Division, Valsad
₹30,000
8 Jun 2026
8 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
Name of Work : CR- FDIR-2026-27 Metalling & Asphalt Patch Work on Karajgam Agripada
Ambamata Temple to Joining Primary School Road sec 1/4 to 2/0 Ta Umargam Dist Valsad
BILL OF QUANTITIES
Item No. Item of work Quantity Unit Rate In figures Amount
Consructing of granular sub-base Gr-II
by providing course graded B.T.
machine crushed material satisfying
MOST specification of (grading II)
using materials (26.5 mm to
mm@ 75 per cent,2.36 mm below@25
1 per cent) including spreading in 252.00 CMT. 568.630
uniform layer with motor grader on
prepared surface, mixing by mix in
place method with rotavator at OMC
and compacting with vibratory roller to
achieve the desired density etc.
Consructing of granular sub-base by
providing course graded B.T. machine
crushed material satisfying MOST
specification of grading I including
spreading in uniform layer with motor
2 grader on prepared surface, mixing by 168.00 CMT. 615.090
mix in place method with rotavator at
OMC and compacting with vibratory
roller to achieve the desired density
Providing and laying wet mix macadam
base course as per MORTH
specification using machine crushed
B.T. chips as per required gradation,
mixing with required optimum quantity
of water, conveying the mix to site of
3 work, spreading in to grade and 168.00 Cum 677.710
camber with paver/mechanical means
and consolidation each layer with
vibratory roller to aschieve the desired
density including cost of material
labour plant and equipment etc.
Providing & laying bituminious base
course 37.50 mm thick compacted
layer asphalt VG-30 grade at 1.99 %
by weight of mix for mixing and
2.5kg/10 smt RS-1 for tack coat &
using B.T. chips of required gradation
including cleaning and heating asphalt,
premix material by drum mix process
in proper gradation and laying with
4 paver finisher including rolling and 247.50 MT 2774.470
consolidation with 8-10 tonne vibratory
roller and providing all material
equipment, tools, and plants, fire
wood, oil, kerosene labour charges
etc. complete using contractor's own
machinaries, drum mix plant and paver
finisher etc. complete.
Providing & laying 37.50mm thick
bituminous macadam with 0.66 cum
stone chips for one M.T. using the
asphalt VG-30 34 kg/M.T. (i.e 3.40%)
for mixing and RS-1 for tack coat
kg/10sqmt heating the asphalt and agg
by continues batching of hot mix plant
5 & spreading the same by pavers 272.25 MT 3872.340
finisher and consolidation with power
roller of 80 to 100 KN with necessary
equipment, oil, kerosene, fire, wood,
labour charges etc. complete with
contractor's own machinary.
Providing & laying seal coat with B.T.
agg. as specifed using agg. at the rate
of 0.18 cu.mt/10Sq.Mt.and bitumen for
mixing agg. at the rate of 4.50% i.e.
45.00 kg/M.T. of total mix for binder
including heating & mixing in hot /
drum mix plant & transporting &
sreading the same by paver finisher &
6 consolidation with vibratory roller incl. 89.10 MT 4693.470
necessary firewoood, oil, lubricants,
labour charges etc. using contractor's
own drum mix plant, machineries &
equipment, tools etc. complete in
accordance with the requirement of
I/We am/are willing to carry out the work at…% above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
All works shall be carried out as public works department Handbook and other
specification of Division or as directed.
All the columns in schedule should be filled in ink or ballpen and the total of the
entries in last column should be struck by the contractor under his signature.
Rate quated include clearance of site (Prior commencement of work and at its close)
in all respects and hold good for work under all conditions,site moisture, weather etc.
The Contractor shall exhibit a board with detailed specification and details of work
as directed by the Engineer-In-Charge for which no extra payment shall be made.
The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at
the rate of input rate mentioned in all the tender.
To be continued on additional sheet,if found necessary.
Deputy Executive Engineer Executive Engineer
Panchayat (R&B) Sub.Division Panchayat (R & B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2.GR to be attached with DTP_SBD.pdf
GR.pdf
SBD-Pk-1.pdf
Schedule B Pk-1.pdf
Specification_ Pk-1.pdf
Download all tender documents and submit your bid