Loading…
Loading…
Tender Value
₹9.3 L
EMD Value
₹9,400
Closing Date
8 Oct 2026, 3:00 pm
Executive Engineer
o/o Executive Engineer PWD Division Karur
SPECIAL REPAIRS TO FLOORING, LEAKY ROOF , WATER SUPPLY AND SANITARY ARRANGEMENTS IN HEALTH SUB CENTRE AT SEETHAPATTI IN KARUR DISTRICT
2026_PWD_707321_1
NIT10-4/KARUR/26-27
Open Tender
Civil Works - Buildings
Lump-sum
SEETHAPATTI
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹9,400
23 Sept 2026
23 Sept 2026
8 Oct 2026
23 Sept 2026
8 Oct 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of plain Cement concrete | 0.64 | M3 | 520.23 | ₹332.95 |
| 2 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of RCC | 4.24 | M3 | 4,610.31 | ₹19,547.71 |
| 3 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of Floor finish and dadooing walls in cement mortar with mosaic tiles / glazed tiles / cuddapah slabs | 18.6 | M2 | 65.56 | ₹1,219.42 |
| 4 | Clean removal of Cement plaster from walls and as directed by the departmental officers | 96.38 | M2 | 9.06 | ₹873.2 |
| 5Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting in- clusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. Data worked out for 64 m3 per day/8 hrs. | |||||
| 5.1 | Upto 2.40m Depth. | 24 | M3 | 198.95 | ₹4,774.8 |
| 6Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by manual means | |||||
| 6.1 | Foundation and Basement | 0.25 | M3 | 7,010.55 | ₹1,752.64 |
| 7 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 2 | M3 | 5,541.5 | ₹11,083 |
| 8 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means | 0.7 | M3 | 5,541.5 | ₹3,879.05 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Seethapatti.pdf
Tender Documents • 1.59 MB
BOQ_850050.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .