Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance KANNUR | KERALA | 670612 | ₹1.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.5 L+₹1,126.81 (0.75%)Admitted-Fee/PreQual/Technical/Finance KERALA KL | THIRUVANANTHAPURAM | KERALA | 695001 | ₹1.5 L+₹1,126.81 (0.75%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | GIREESH UP L2 | ISMAIL P L1 |
|---|---|---|---|---|---|
| 1.00Class room completion | |||||
| 1.00 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 563.4 | sqm | 76 ₹42,818.63 | 74 ₹41,691.82 Lowest |
| 1.00 | 13.82.2:Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 grams/ litre, of approved brand and manufacture including applying additional coats wherever required, to achieve even shade and colour.Two coats | 518.18 | sqm | 133.68 ₹69,270.97 Lowest | 133.68 ₹69,270.97 Lowest |
| 1.00 | 13.63.1:Painting with aluminium paint of approved brand and manufacture to give an even shade.Two or more coats on new work | 37.31 | sqm | 139.92 ₹5,221.11 Lowest | 139.92 ₹5,221.11 Lowest |
| 1.00 | 50.6.1.9:Solid block masonry using pre cast solid blocks( Factory made) of size 40x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 2.43 | cum | 8,446.33 ₹20,524.58 Lowest | 8,446.33 ₹20,524.58 Lowest |
| 1.00 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 37.8 | sqm | 339.63 ₹12,838.01 Lowest | 339.63 ₹12,838.01 Lowest |
Tender Value
₹1.5 L
EMD Value
₹3,742
Closing Date
20 Aug 2026, 5:00 pmClosed
ASSISTANTENGINEER
AE/LID/EW Karuvarakundu GP
Annual Plan-Karuvarakund GP-2025-26-422/26- Completion of Class Room for GLPS karuvarakund- 422/26
2026_LSGD_865110_19
ET2/27/AE/LIDEW/KKD
Open Tender
Civil Works - Buildings
Item Rate
270 days
KARUVARAKUNDU
Please refer tender documents
9 documents required · 9 mandatory
₹555
₹3,742
8 Sept 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Class room completion | |||||
| 1.001 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 0.2 | sqm | - | - |
| 1.002 | 13.82.2:Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 grams/ litre, of approved brand and manufacture including applying additional coats wherever required, to achieve even shade and colour.Two coats | 1 | sqm | - | - |
| 1.003 | 13.63.1:Painting with aluminium paint of approved brand and manufacture to give an even shade.Two or more coats on new work | 1 | sqm | - | - |
| 1.004 | 50.6.1.9:Solid block masonry using pre cast solid blocks( Factory made) of size 40x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | - | cum | - | - |
| 1.005 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 1 | sqm | - | - |
stage.html
html • 0.02 MB
finance_1464040.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
generalestpdfview.pdf
Tender Documents • 0.02 MB
viewsbd (1).pdf
Tender Documents • 1.74 MB
BOQ_1464040.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .