Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹81.7 L
EMD Value
₹82,000
Closing Date
20 Jul 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,Tapi (R & B) Division,Vyara
Construction of New Compound wall at GTI campus Kanza, Tal.: Vyara,Dist.: Tapi
321787
09 OF 2026-27
Open
Civil Works
Works
Tapi
16 documents required · 14 mandatory · 2 optional
₹2,400
Executive Engineer,Tapi (R & B) Division,Vyara
₹82,000
8 Jul 2026
8 Jul 2026
8 Jul 2026
20 Jul 2026
8 Jul 2026
120 days
Construction of New Compound wall at GTI campus Kanza, Tal.: Vyara, Dist.: Tapi.
BILL OF QUANTITIES
Percentage Rate Tender
Item Description of Item Quantity Unit Rate In Amount
1 Demolition including stacking of serviceable materilas and disposal of 71.00 Cu.m. 1084.30
unserviceable materials with all lead and lift. (i) R.C.C. work
2 Demolition of Brick work and stone masonry including stacking of serviceable 199 Cu.m. 564.16
materilas and disposal of unserviceable materials with all lead and lift.(ii) In
3 Dismentling steel work including distempering and stacking the materials with all 660.00 Kg. 3.76
4 Dismentling barbed wire in fencing including making rolls and also including 430.00 Rmt. 68.33
dismentling fencing posts including all earth work concrete in base and making
good the disturbed ground stacking useful materials as directed and disposing as
directed and disposing of the unserviceable materials with all lead and lift.
5 Excavation for foundation upto 1.5 m depth including sorting out and stacking of 871.00 Cu.m. 120.01
useful materials and disposing off the excavated stuff upto 50 Meter lead.(A)
Loose or soft soil
6 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out 259 Cu.m. 166.44
and stacking of useful materials and disposing off the excavated stuff upto
50 Meter lead.(B) Dense or Hard soil
7 Providing and laying controlled cement concrete M150 for curing complete 69.00 Cu.m. 4151.00
including cost of formwork but excluding the cost of reinforcement for reinforced
concrete work in (A) Foundations, footings,Base of columns, Plinth Slab and Mass
8 Providing and laying controlled cement concrete M.250 and curing complete 175.00 Cu.m. 4620.38
including the cost of formwork and excluding reinforcement for reinforced
concrete work in (A) Foundations, footings, and Mass concrete. footing.
9 Providing and laying controlled cement concrete M.250 and curing complete 160.00 Cu.m. 5631.44
including the cost of formwork and excluding the cost of reinforcement for
reinforced concrete work in (B) Walls, from top of foundation level upto floor two
10 Providing and laying controlled cement concrete M-250 and curing complete 12.00 Cu.m. 7304.36
including the cost of form work but excluding the cost of reinforcement for
reinforced concrete work in (d) columns Up to Plinth level.
11 Providing and laying controlled cement concrete M-200 and curing complete 23.00 Cu.m. 7562.45
including the cost of form work but excluding the cost of reinforcement for
reinforced concrete work in Columns, pillars posts and struts G.FLOOR.
12 Filling available excavated earth (excluding rock) in trenches. plinth, sides of 714.00 Cu.m. 133.65
foundations etc. in layers not exceeding 20 cm. in depth consolidating each
disposited layer by ramming and watering.
Item Description of Item Quantity Unit Rate In Amount
13 Providing and laying controlled cement concrete M-250 and curing complete 40.00 Cu.m. 5574.70
including the cost of form work but excluding the cost of reinforcement for
reinforced concrete work in Ground & Plinth BEAMS.
14 Brick work using common burnt clay building bricks having crushing strength not 196.00 Cu.m. 4403.40
less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5. (1-
Cement : 5 -fine sand) (B) Conventional Ground Floor
15 Providing and laying controlled cement concrete M-200 for RCC work and curing 18.00 Cu.m. 5830.53
complete including the cost of form work but excluding the cost of reinforced
concrete work in coping on Ground Floor
16 Providing IS Mark TMT FE 500D bar reinforcement for RCC work including bending 36935.00 Kg. 77.29
& placing in position complete up to All floor Level
17 20 mm thick Sand faced cement plaster with 18x8 mm grooves as suggested by 2096.00 Sq.m. 337.52
this office consisting of 12 mm thick backing coat of C.M. 1:3 ( 1 cement : 3 coarse
sand ) and 8 mm thick finishing coat of C.M. 1:1 ( 1 cement : 1 coarse sand) for all
heights as directed etc. complete. and as per pattern sample aprroved by the
architect or directed engineer in-charge
18 Wall Painting (Two coats) with weather proof 100 % acraylic emulsion (Apex or 2096.00 Sq.m. 117.40
equivalent type) paint of approved brand and manufacture and of required shade
on exterior wall surface to give an even shade over and including primery coat
with Alkaly resistance primer of approved brand after thoroughly brushing
surface to remove all dust and remains of loose powdered material etc. copm.
for all height.
19 Providing and fixing Decorative Entrance Gate made out of cast iron and various 935.00 Kg. 116.55
mild steel tabular section combination , the Ornamental entrance gate should be
fixed at column including pattern and die making , cutting , welding , grinding,
fabrication , fixing in position at column with necessary pedestal, bearing block
and other locking arrangement. The entrance gate should be painted with two
coats of priming coat of paint, and two coat of oil paint etc complete. As per
detail design and directed by engineer in charge.
20 Providing and fixing concertina coil fencing with punched tape concertina coil 600 430.00 Rmt. 582.77
mm dia 10 mt openable length having 50 no rounds per 6 mt length, upto 3mt
height of wall with existing angle iron (50mm x50mm x5mm )requird shaped As
per Directed Engeenier in charge. placed 2.4mt or 3.00mt apart and with
horizontal R.B.T. reinforced barbed wire(3 mm) , stud tied with G.I. staples and
G.I. clips to retain horizontal, including necessary bolts or G.I.barbed wire tied to
angle iron, all complete as per direction of Engineer-in-charge, with reinforced
barbed tape (R.B.T.)/Spring core (2.5 mm thick) and weight 43.478 gm/meter at
compound wall for ESR M4/ intakewell.
Item Description of Item Quantity Unit Rate In Amount
21 Constructing providing and fabricating cattle guard using channel section frame of 18.00 Sq.m. 5227.76
size ISMC series 100 mm x 50 mm (Weight 9.20 kg/Rmt) and ISMC section
mm x 75mm (weight 11.50 kg/Rmt) intermediate support for welding G.I.pipe at
12 Cm C/C of size 50 mm in a frame made of Channel section size 100 mm x
mm all round including fixing the unit on prepared chamber of masonary wall
using MS hold fast embeded in masonary wall top as directed by Engineer in
charge and as per drawing and necessary required arrangement etc complete.
Rupees Eighty one Lacs Seventy Four Thousand Six Hundred Seventy one And Fourty Two Paise Only
Note :-The Credit Dismentalled Materials must be deduct of Rs. 2,25,356.92 agency 1st RA Bill.
I/We am/are willing to carry out the work at………………….% above/below percent(Should be written in figures and words) of the estimated
rate mentioned above. Amount of my /our
Tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no
extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
4 Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design
the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned
5 The Credit Dismentalled Materials must be deduct of Rs. 2,25,356.92 agency 1st RA Bill.
Executive Engineer
Tapi ( R & B ) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD-GTI.pdf
BOQ-GTI.pdf
SPECIFICATIONS-GTI.pdf
Building-Specification Book.pdf
GR.pdf
GR Clouse 24-34 52.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .